{
 "id": "epzmrztcx6",
 "slug": "angra-nuclear-power-plant",
 "title": "Angra nuclear power plant",
 "updated": "2026-10-15",
 "topic_path": [
  {
   "id": "technology",
   "label": "Technology and the built world",
   "api_url": "https://www.edgepedia.org/api/v1/topics/technology"
  },
  {
   "id": "technology.energy",
   "label": "Energy technology",
   "api_url": "https://www.edgepedia.org/api/v1/topics/technology.energy"
  },
  {
   "id": "technology.energy.energy.nuclear",
   "label": "Nuclear power",
   "api_url": "https://www.edgepedia.org/api/v1/topics/technology.energy.energy.nuclear"
  },
  {
   "id": "technology.energy.energy.nuclear.plants-industry-and-national-programs",
   "label": "Plants, industry, and national programs",
   "api_url": "https://www.edgepedia.org/api/v1/topics/technology.energy.energy.nuclear.plants-industry-and-national-programs"
  },
  {
   "id": "technology.energy.energy.nuclear.plants-industry-and-national-programs.nuclear-power-plants-in-asia-africa-and-the-amer",
   "label": "Nuclear power plants in Asia, Africa, and the Americas",
   "api_url": "https://www.edgepedia.org/api/v1/topics/technology.energy.energy.nuclear.plants-industry-and-national-programs.nuclear-power-plants-in-asia-africa-and-the-amer"
  }
 ],
 "geo": [
  {
   "id": "geo.latam.t1946.technology.energy",
   "label": "Latin America and the Caribbean · 1946 to 2000: Energy technology",
   "api_url": "https://www.edgepedia.org/api/v1/geo/geo.latam.t1946.technology.energy",
   "path": [
    {
     "id": "geo.latam",
     "label": "Latin America and the Caribbean",
     "api_url": "https://www.edgepedia.org/api/v1/geo/geo.latam"
    },
    {
     "id": "geo.latam.t1946",
     "label": "Latin America and the Caribbean · 1946 to 2000",
     "api_url": "https://www.edgepedia.org/api/v1/geo/geo.latam.t1946"
    },
    {
     "id": "geo.latam.t1946.technology",
     "label": "Technology and the built world",
     "api_url": "https://www.edgepedia.org/api/v1/geo/geo.latam.t1946.technology"
    },
    {
     "id": "geo.latam.t1946.technology.energy",
     "label": "Energy technology",
     "api_url": "https://www.edgepedia.org/api/v1/geo/geo.latam.t1946.technology.energy"
    }
   ]
  },
  {
   "id": "geo.latam.t2021.technology.energy",
   "label": "Latin America and the Caribbean · 2021 and later: Energy technology",
   "api_url": "https://www.edgepedia.org/api/v1/geo/geo.latam.t2021.technology.energy",
   "path": [
    {
     "id": "geo.latam",
     "label": "Latin America and the Caribbean",
     "api_url": "https://www.edgepedia.org/api/v1/geo/geo.latam"
    },
    {
     "id": "geo.latam.t2021",
     "label": "Latin America and the Caribbean · 2021 and later",
     "api_url": "https://www.edgepedia.org/api/v1/geo/geo.latam.t2021"
    },
    {
     "id": "geo.latam.t2021.technology",
     "label": "Technology and the built world",
     "api_url": "https://www.edgepedia.org/api/v1/geo/geo.latam.t2021.technology"
    },
    {
     "id": "geo.latam.t2021.technology.energy",
     "label": "Energy technology",
     "api_url": "https://www.edgepedia.org/api/v1/geo/geo.latam.t2021.technology.energy"
    }
   ]
  }
 ],
 "excerpt": "The Angra nuclear power plant, officially the Central Nuclear Almirante Álvaro Alberto, is Brazil's only nuclear power station, near Angra dos Reis in Rio de Janeiro state.",
 "snippet": "The Angra nuclear power plant, officially the Central Nuclear Almirante Álvaro Alberto, is Brazil's only nuclear power station, near Angra dos Reis in Rio de Janeiro state.",
 "node": "technology.energy.energy.nuclear.plants-industry-and-national-programs.nuclear-power-plants-in-asia-africa-and-the-amer",
 "markdown": "# Angra nuclear power plant\n\nThe Angra nuclear power plant, officially the Central Nuclear Almirante Álvaro Alberto (CNAAA), is Brazil's only nuclear power station, located at Itaorna beach near the town of [Angra dos Reis](https://www.edgepedia.org/angra-dos-reis) in Rio de Janeiro state. It consists of two operating pressurized water reactors, Angra 1 and Angra 2, and a third unit, Angra 3, whose incomplete construction has been suspended and resumed repeatedly since the 1980s.<sup>[1](https://www3.eletronuclear.gov.br/Nossas-Atividades/Paginas/Angra-1.aspx)</sup><sup> • </sup><sup>[2](https://www.eletronuclear.gov.br/Imprensa-e-Midias/Paginas/Eletronuclear-completa-27-anos.aspx)</sup>\n\n| Key fact | Detail |\n|---|---|\n| Location and operator | Itaorna, Angra dos Reis, Rio de Janeiro; owned and operated by Eletrobras Eletronuclear, a state-controlled company under ENBPar<sup>[3](https://www.eletronuclear.gov.br/Nossas-Atividades/Paginas/Informacoes-de-Angra-2.aspx)</sup><sup> • </sup><sup>[2](https://www.eletronuclear.gov.br/Imprensa-e-Midias/Paginas/Eletronuclear-completa-27-anos.aspx)</sup> |\n| Angra 1 | Westinghouse two-loop PWR, 640 MW gross (609 MW net), 1,882 MWt; commercial operation since 1985<sup>[1](https://www3.eletronuclear.gov.br/Nossas-Atividades/Paginas/Angra-1.aspx)</sup><sup> • </sup><sup>[4](https://www.eletronuclear.gov.br/Nossas-Atividades/Paginas/Informacoes-de-Angra-1.aspx)</sup> |\n| Angra 2 | Siemens/KWU four-loop PWR, 1,350 MW gross (1,280 MW net), 3,771 MWt; declared operational December 2000<sup>[5](https://nucleus.iaea.org/sites/connect/MSNpublic/Pages/nct/downloads/Pub1537_web.pdf)</sup><sup> • </sup><sup>[3](https://www.eletronuclear.gov.br/Nossas-Atividades/Paginas/Informacoes-de-Angra-2.aspx)</sup> |\n| Angra 3 | PRE-KONVOI PWR of 1,405 MW gross (1,340 MW net); construction began 30 May 2010, about 65 to 68 percent complete, completion undecided<sup>[6](https://world-nuclear.org/nuclear-reactor-database/details/Angra-3)</sup><sup> • </sup><sup>[7](https://www3.eletronuclear.gov.br/Nossas-Atividades/Paginas/Angra-3.aspx)</sup> |\n| Output | The two operating units generate about 15 million MWh per year, roughly 3% of Brazil's electricity and about 40% of Rio de Janeiro state's consumption<sup>[2](https://www.eletronuclear.gov.br/Imprensa-e-Midias/Paginas/Eletronuclear-completa-27-anos.aspx)</sup> |\n| Angra 1 life extension | The regulator CNEN authorized long-term operation in November 2024, allowing Angra 1 to run until 2044<sup>[8](https://www.gov.br/cnen/pt-br/assunto/ultimas-noticias/cnen-autoriza-extensao-da-operacao-de-angra-1-por-mais-20-anos/)</sup> |\n| Angra 3 economics | A 2025 BNDES study put completion at R$23.9 billion and abandonment at R$21.9 to 25.97 billion<sup>[9](https://economia.uol.com.br/noticias/reuters/2025/11/05/estudo-do-bndes-sobre-angra-3-aponta-custo-maior-da-energia-e-mais-r239-bi-para-conclusao.htm)</sup> |\n\n## Origins and the 1975 German agreement\n\nBrazil's nuclear program at Angra began with two very different procurement models. Angra 1 was bought from the American company Westinghouse as a \"turn key\" package, a closed contract that did not provide for technology transfer to Brazilian suppliers.<sup>[1](https://www3.eletronuclear.gov.br/Nossas-Atividades/Paginas/Angra-1.aspx)</sup> In 1975, Brazil and Germany signed a cooperation agreement to develop a complete nuclear fuel cycle in Brazil, including a protocol for purchasing eight PWR-type plants; the first two 1,300 MW-class units, which became Angra 2 and Angra 3, were ordered that year from Siemens/KWU.<sup>[5](https://nucleus.iaea.org/sites/connect/MSNpublic/Pages/nct/downloads/Pub1537_web.pdf)</sup>\n\nThe program was then slowed by Brazil's economic conditions. From 1984 onward, slow economic growth had a serious effect on the nuclear program and on the construction of Angra 2 and Angra 3; the utility continued work on Angra 2 and rock excavation for Angra 3 on annual government budgets until the whole project was stopped in 1986.<sup>[5](https://nucleus.iaea.org/sites/connect/MSNpublic/Pages/nct/downloads/Pub1537_web.pdf)</sup>\n\n## Angra 1\n\nAngra 1 is a two-loop Westinghouse pressurized water reactor with 640 MW of gross capacity, 609 MW net, and a nominal thermal power of 1,882 MWt.<sup>[1](https://www3.eletronuclear.gov.br/Nossas-Atividades/Paginas/Angra-1.aspx)</sup><sup> • </sup><sup>[4](https://www.eletronuclear.gov.br/Nossas-Atividades/Paginas/Informacoes-de-Angra-1.aspx)</sup> It entered commercial operation in 1985 as Brazil's first nuclear power plant.<sup>[1](https://www3.eletronuclear.gov.br/Nossas-Atividades/Paginas/Angra-1.aspx)</sup> In its early years the plant had equipment problems that impaired operation; these were resolved in the mid-1990s, after which the unit performed at levels comparable with international practice.<sup>[1](https://www3.eletronuclear.gov.br/Nossas-Atividades/Paginas/Angra-1.aspx)</sup>\n\n**Life extension.** [Eletronuclear](https://www.edgepedia.org/eletronuclear) submitted a request to renew Angra 1's operating license to the national regulator, the [Comissão Nacional de Energia Nuclear](https://www.edgepedia.org/comissao-nacional-de-energia-nuclear) (CNEN), in 2019, and delivered the third periodic safety review report in December 2023.<sup>[1](https://www3.eletronuclear.gov.br/Nossas-Atividades/Paginas/Angra-1.aspx)</sup> Preparatory work has included replacing the steam generators, applying a weld overlay to pressurizer nozzles, replacing the reactor pressure vessel head and the main transformers, and programs for obsolescence management and concrete structure inspection.<sup>[1](https://www3.eletronuclear.gov.br/Nossas-Atividades/Paginas/Angra-1.aspx)</sup> In November 2024, CNEN granted the Authorization for Long-Term Operation, permitting Angra 1 to operate until 2044, subject to conditions including a new periodic safety review in 2033.<sup>[8](https://www.gov.br/cnen/pt-br/assunto/ultimas-noticias/cnen-autoriza-extensao-da-operacao-de-angra-1-por-mais-20-anos/)</sup> The World Nuclear Performance Report states a different end date of 2055 for the same authorization.<sup>[10](https://world-nuclear.org/images/articles/World_Nuclear_Performance_Report_2025_ec7e189b.pdf)</sup> The Tribunal de Contas da União, Brazil's federal audit court, which reviewed the extension program in 2026, describes the authorization as running to 2044 under Resolução-Cnen 331/2024.<sup>[11](https://portal.tcu.gov.br/imprensa/noticias/extensao-da-vida-util-de-angra-1-e-analisada-pelo-tribunal-de-contas-da-uniao)</sup>\n\nThe extension program (LTO Angra 1) is scheduled through 2028 at an estimated cost above R$3.5 billion; a TCU audit found a risk that insufficient financing could halt the works, noting that planned long-term funding through R$2.4 billion in convertible debentures had not yet been issued and that bridge loans had already cost more than R$185 million by February 2026.<sup>[11](https://portal.tcu.gov.br/imprensa/noticias/extensao-da-vida-util-de-angra-1-e-analisada-pelo-tribunal-de-contas-da-uniao)</sup>\n\n## Angra 2\n\nAngra 2 is a four-loop pressurized water reactor of German Siemens/KWU design, with 1,350 MW gross, 1,280 MW net, and 3,771 MWt of thermal power.<sup>[3](https://www.eletronuclear.gov.br/Nossas-Atividades/Paginas/Informacoes-de-Angra-2.aspx)</sup><sup> • </sup><sup>[5](https://nucleus.iaea.org/sites/connect/MSNpublic/Pages/nct/downloads/Pub1537_web.pdf)</sup> Reactor building base-plate concrete was poured on 14 September 1981, and a foundation recalculation during 1976 construction analysis had already caused a severe delay, with foundations completed only in 1982.<sup>[3](https://www.eletronuclear.gov.br/Nossas-Atividades/Paginas/Informacoes-de-Angra-2.aspx)</sup><sup> • </sup><sup>[5](https://nucleus.iaea.org/sites/connect/MSNpublic/Pages/nct/downloads/Pub1537_web.pdf)</sup> After the 1986 stoppage, mechanical, electrical, and instrumentation erection restarted in March 1996; systems needed for core loading were ready in March 2000, and Angra 2 was declared operational in December 2000, with commercial operation from 2001.<sup>[5](https://nucleus.iaea.org/sites/connect/MSNpublic/Pages/nct/downloads/Pub1537_web.pdf)</sup>\n\nUnlike the Angra 1 turnkey purchase, the Angra 2 and 3 contract was accompanied by technology transfer to Brazil, which the operator credits with giving the country command of practically all stages of nuclear fuel fabrication.<sup>[12](https://www.eletronuclear.gov.br/Seguranca/Paginas/Tecnologia.aspx)</sup> In 2025 Angra 2 set its own generation record, and in March 2026 it was reconnected to the national grid after a scheduled outage that began on 16 January.<sup>[13](https://www.eletronuclear.gov.br/Imprensa-e-Midias/Paginas/Relat%C3%B3rio-Anual-2025-destaca-contribui%C3%A7%C3%A3o-da-Eletronuclear-para-a-seguran%C3%A7a-energ%C3%A9tica-do-Brasil.aspx)</sup><sup> • </sup><sup>[14](https://economia.uol.com.br/noticias/reuters/2026/03/13/usina-nuclear-angra-2-volta-a-operar-apos-parada-em-janeiro-diz-eletronuclear.htm)</sup>\n\n## Angra 3\n\nAngra 3 is a PRE-KONVOI pressurized water reactor, a sister design to Angra 2, with 1,405 MW gross and 1,340 MW net capacity, and a thermal capacity of 3,900 MWt.<sup>[6](https://world-nuclear.org/nuclear-reactor-database/details/Angra-3)</sup> Its construction license was issued in June 2010 and first concrete for the reactor building was poured on 1 June 2010, with commercial operation then scheduled for December 2015.<sup>[5](https://nucleus.iaea.org/sites/connect/MSNpublic/Pages/nct/downloads/Pub1537_web.pdf)</sup> The World Nuclear Association lists the construction start as 30 May 2010.<sup>[6](https://world-nuclear.org/nuclear-reactor-database/details/Angra-3)</sup>\n\nThe project has been interrupted repeatedly. Work was suspended in 2015 over a financing review and a corruption probe, a 2022 attempt to revive it faltered, and construction was halted again in April 2023.<sup>[7](https://www3.eletronuclear.gov.br/Nossas-Atividades/Paginas/Angra-3.aspx)</sup><sup> • </sup><sup>[15](https://www.investing.com/news/economy-news/brazils-government-split-over-multibillion-dollar-nuclear-plant-completion-3873731)</sup><sup> • </sup><sup>[16](https://www.sfen.org/app/uploads/2025/10/Review-report-Sfen-2026.pdf)</sup> Eletronuclear reports about 65 percent physical completion, with roughly R$7.8 billion invested and about R$20 billion then estimated to finish.<sup>[7](https://www3.eletronuclear.gov.br/Nossas-Atividades/Paginas/Angra-3.aspx)</sup> Its 2025 annual report put progress at 68.84 percent against a planned 78.77 percent and rated the project \"at risk\" after the National Energy Policy Council (CNPE) again failed to decide the plant's fate in December 2025.<sup>[17](https://www.eletronuclear.gov.br/Quem-Somos/Governanca/Documents/Relatorios-Anuais/Eletronuclear_RA_2025_Port_Final.pdf)</sup>\n\n**The completion decision.** Under Law 14,120/2021, the sale price of Angra 3's energy is to result from a study by the Brazilian development bank BNDES, approved by the CNPE.<sup>[18](https://www.sec.gov/Archives/edgar/data/1439124/000129281425002105/ebr20250514_6k1.htm)</sup> BNDES modeling delivered in September 2024 put the proposed tariff at R$653.31/MWh (October 2023 basis) and found the costs of finishing and abandoning the project nearly equal, at R$23 billion and R$21 billion respectively.<sup>[19](https://www.eletronuclear.gov.br/Imprensa-e-Midias/Paginas/Angra-3%2C-atualiza%C3%A7%C3%B5es-sobre-o-futuro-da-energia-nuclear-no-Brasil.aspx)</sup> An updated November 2025 study raised the tariff range to R$778.86 to R$817.27/MWh, pushed completion to 2033, and estimated R$23.9 billion to complete versus R$21.9 to 25.97 billion to abandon.<sup>[9](https://economia.uol.com.br/noticias/reuters/2025/11/05/estudo-do-bndes-sobre-angra-3-aponta-custo-maior-da-energia-e-mais-r239-bi-para-conclusao.htm)</sup> While the CNPE deliberates, Eletronuclear spends about R$1 billion per year maintaining the project, including R$800 million in debt service to BNDES and [Caixa Econômica Federal](https://www.edgepedia.org/caixa-economica-federal).<sup>[9](https://economia.uol.com.br/noticias/reuters/2025/11/05/estudo-do-bndes-sobre-angra-3-aponta-custo-maior-da-energia-e-mais-r239-bi-para-conclusao.htm)</sup>\n\nThe Brazilian government itself is divided: Reuters reported in February 2025 that the economic team favored abandoning the project while the Mines and Energy Ministry supported completion, and in February 2026 Minister Esther Dweck said a decision was expected within the semester, noting that the cost of not continuing was very close to the cost of continuing.<sup>[15](https://www.investing.com/news/economy-news/brazils-government-split-over-multibillion-dollar-nuclear-plant-completion-3873731)</sup><sup> • </sup><sup>[20](https://economia.uol.com.br/noticias/reuters/2026/02/12/ministra-dweck-preve-decisao-sobre-angra-3-neste-semestre-e-indica-vantagem-em-concluir-obra.htm)</sup> In July 2026 the CNPE recognized the public interest in Eletronuclear's request to BNDES and Caixa for a temporary suspension of Angra 3 debt payments, while stating that the act did not alter financing contracts or determine any suspension.<sup>[21](https://www.gov.br/mme/pt-br/assuntos/conselhos-e-comites/cnpe/comunicacoes/cnpe-reconhece-interesse-publico-da-suspensao-do-pagamento-das-dividas-de-angra-3)</sup>\n\n## Role in the Brazilian electricity system\n\nThe two operating units together generate about 15 million MWh per year, enough for roughly 6 million inhabitants, and account for about 3% of the electricity generated in Brazil and about 40% of consumption in Rio de Janeiro state; with Angra 3 completed, the complex would supply the equivalent of about 70% of the state's consumption.<sup>[2](https://www.eletronuclear.gov.br/Imprensa-e-Midias/Paginas/Eletronuclear-completa-27-anos.aspx)</sup> The IEA's 2025 review of Brazil puts the two plants' share of generation at 2% in 2024 and their combined installed capacity at 1,990 MW.<sup>[22](https://www.gov.br/mme/pt-br/assuntos/secretarias/sntep/dte/cgate/acoplare/brazil2025-energypolicyreview-iea.pdf)</sup> Because the plants run independently of weather, they serve as a stable complement to Brazil's hydro-dominated system, particularly during droughts.<sup>[22](https://www.gov.br/mme/pt-br/assuntos/secretarias/sntep/dte/cgate/acoplare/brazil2025-energypolicyreview-iea.pdf)</sup><sup> • </sup><sup>[2](https://www.eletronuclear.gov.br/Imprensa-e-Midias/Paginas/Eletronuclear-completa-27-anos.aspx)</sup>\n\nThe site also hosts research infrastructure: the Neutrinos Angra experiment, a detector for electron antineutrinos, was commissioned at the Angra dos Reis power plant to monitor the reactor's antineutrino emission.<sup>[23](https://arxiv.org/abs/1812.11604)</sup>\n\n## Safety oversight\n\nCNEN regulates the site and publishes annual operational status reports (RESOU) for the CNAAA units, and CNEN resident inspectors work at the plant around the clock.<sup>[24](https://www.gov.br/cnen/pt-br/assunto/radioprotecao-e-seguranca-nuclear/area-nuclear/2024/2024)</sup><sup> • </sup><sup>[25](https://www.gov.br/cnen/pt-br/assunto/ultimas-noticias/nota-de-esclarecimento-com-monitoramento-rigoroso-e-total-transparencia-cnen-garante-a-seguranca-operacional-da-usina-de-angra-2)</sup> The plant has been reviewed repeatedly by international missions: an IAEA Operational Safety Review Team visited Angra 1 from 30 June to 17 July 2003, the 119th mission of the OSART program, and found managers committed to improving operational safety while recommending better long-term staffing and reduced reliance on contractors.<sup>[26](https://www.iaea.org/sites/default/files/documents/review-missions/mission_to_angra1_jun_2003_119_.pdf)</sup> In December 2024, CNEN publicly addressed an internal leak in the first seal of the Angra 2 reactor vessel head, stating that the leak had remained stable, did not compromise the plant's safety criteria, and that a similar occurrence had been recorded and managed in 2010.<sup>[25](https://www.gov.br/cnen/pt-br/assunto/ultimas-noticias/nota-de-esclarecimento-com-monitoramento-rigoroso-e-total-transparencia-cnen-garante-a-seguranca-operacional-da-usina-de-angra-2)</sup>\n\n## References\n\n1. [Angra 1, Eletrobras Eletronuclear](https://www3.eletronuclear.gov.br/Nossas-Atividades/Paginas/Angra-1.aspx)\n2. [Eletronuclear completa 27 anos, Eletrobras Eletronuclear (1 August 2024)](https://www.eletronuclear.gov.br/Imprensa-e-Midias/Paginas/Eletronuclear-completa-27-anos.aspx)\n3. [Informações de Angra 2, Eletrobras Eletronuclear](https://www.eletronuclear.gov.br/Nossas-Atividades/Paginas/Informacoes-de-Angra-2.aspx)\n4. [Informações de Angra 1, Eletrobras Eletronuclear](https://www.eletronuclear.gov.br/Nossas-Atividades/Paginas/Informacoes-de-Angra-1.aspx)\n5. [Annex I: Brazil, IAEA Nuclear Power Project Management STI/PUB/1537](https://nucleus.iaea.org/sites/connect/MSNpublic/Pages/nct/downloads/Pub1537_web.pdf)\n6. [Angra 3, World Nuclear Association Reactor Database](https://world-nuclear.org/nuclear-reactor-database/details/Angra-3)\n7. [Angra 3, Eletrobras Eletronuclear](https://www3.eletronuclear.gov.br/Nossas-Atividades/Paginas/Angra-3.aspx)\n8. [CNEN autoriza extensão da operação de Angra 1 por mais 20 anos, Comissão Nacional de Energia Nuclear (22 November 2024)](https://www.gov.br/cnen/pt-br/assunto/ultimas-noticias/cnen-autoriza-extensao-da-operacao-de-angra-1-por-mais-20-anos/)\n9. [Estudo do BNDES sobre Angra 3 aponta custo maior da energia e mais R$23,9 bi para conclusão, Reuters via UOL (5 November 2025)](https://economia.uol.com.br/noticias/reuters/2025/11/05/estudo-do-bndes-sobre-angra-3-aponta-custo-maior-da-energia-e-mais-r239-bi-para-conclusao.htm)\n10. [World Nuclear Performance Report 2025, World Nuclear Association](https://world-nuclear.org/images/articles/World_Nuclear_Performance_Report_2025_ec7e189b.pdf)\n11. [Extensão da vida útil de Angra 1 é analisada pelo Tribunal de Contas da União (26 August 2026)](https://portal.tcu.gov.br/imprensa/noticias/extensao-da-vida-util-de-angra-1-e-analisada-pelo-tribunal-de-contas-da-uniao)\n12. [Tecnologia, Eletrobras Eletronuclear](https://www.eletronuclear.gov.br/Seguranca/Paginas/Tecnologia.aspx)\n13. [Relatório Anual 2025 destaca contribuição da Eletronuclear para a segurança energética do Brasil (19 June 2026)](https://www.eletronuclear.gov.br/Imprensa-e-Midias/Paginas/Relat%C3%B3rio-Anual-2025-destaca-contribui%C3%A7%C3%A3o-da-Eletronuclear-para-a-seguran%C3%A7a-energ%C3%A9tica-do-Brasil.aspx)\n14. [Usina nuclear Angra 2 volta a operar após parada em janeiro, Reuters via UOL (13 March 2026)](https://economia.uol.com.br/noticias/reuters/2026/03/13/usina-nuclear-angra-2-volta-a-operar-apos-parada-em-janeiro-diz-eletronuclear.htm)\n15. [Brazil's government split over multi-billion dollar nuclear plant completion, Reuters via Investing.com (18 February 2025)](https://www.investing.com/news/economy-news/brazils-government-split-over-multibillion-dollar-nuclear-plant-completion-3873731)\n16. [Rest of the world, Review Report 2026, Société Française d'Énergie Nucléaire](https://www.sfen.org/app/uploads/2025/10/Review-report-Sfen-2026.pdf)\n17. [Relatório Anual 2025, Eletrobras Eletronuclear](https://www.eletronuclear.gov.br/Quem-Somos/Governanca/Documents/Relatorios-Anuais/Eletronuclear_RA_2025_Port_Final.pdf)\n18. [Eletrobras Form 6-K (14 May 2025), U.S. Securities and Exchange Commission](https://www.sec.gov/Archives/edgar/data/1439124/000129281425002105/ebr20250514_6k1.htm)\n19. [Angra 3, atualizações sobre o futuro da energia nuclear no Brasil, Eletrobras Eletronuclear (28 May 2025)](https://www.eletronuclear.gov.br/Imprensa-e-Midias/Paginas/Angra-3%2C-atualiza%C3%A7%C3%B5es-sobre-o-futuro-da-energia-nuclear-no-Brasil.aspx)\n20. [Ministra Dweck prevê decisão sobre Angra 3 neste semestre, Reuters via UOL (12 February 2026)](https://economia.uol.com.br/noticias/reuters/2026/02/12/ministra-dweck-preve-decisao-sobre-angra-3-neste-semestre-e-indica-vantagem-em-concluir-obra.htm)\n21. [CNPE reconhece interesse público da suspensão do pagamento das dívidas de Angra 3, Ministério de Minas e Energia (24 July 2026)](https://www.gov.br/mme/pt-br/assuntos/conselhos-e-comites/cnpe/comunicacoes/cnpe-reconhece-interesse-publico-da-suspensao-do-pagamento-das-dividas-de-angra-3)\n22. [Brazil 2025 Energy Policy Review, International Energy Agency](https://www.gov.br/mme/pt-br/assuntos/secretarias/sntep/dte/cgate/acoplare/brazil2025-energypolicyreview-iea.pdf)\n23. [Neutrinos Angra experiment: commissioning and first operational measurements, arXiv](https://arxiv.org/abs/1812.11604)\n24. [Relatório de Situação Operacional das Usinas 2024, Comissão Nacional de Energia Nuclear](https://www.gov.br/cnen/pt-br/assunto/radioprotecao-e-seguranca-nuclear/area-nuclear/2024/2024)\n25. [Nota de Esclarecimento sobre a segurança operacional da Usina de Angra 2, CNEN (21 February 2025)](https://www.gov.br/cnen/pt-br/assunto/ultimas-noticias/nota-de-esclarecimento-com-monitoramento-rigoroso-e-total-transparencia-cnen-garante-a-seguranca-operacional-da-usina-de-angra-2)\n26. [IAEA OSART mission to Angra 1, 30 June to 17 July 2003](https://www.iaea.org/sites/default/files/documents/review-missions/mission_to_angra1_jun_2003_119_.pdf)\n\n---\n*Topic: Encyclopedia › Technology and the built world › Energy technology › Nuclear power › Plants, industry, and national programs › Nuclear power plants in Asia, Africa, and the Americas*\n\n*Initially written Oct 15, 2026*\n\n*Copyright 2026 EdgeChat AI, a subsidiary of Biostate AI.*\n\nLicense: Edgepedia Community License 1.0, https://www.edgepedia.org/edgepedia/license\n",
 "same_as": [],
 "url": "https://www.edgepedia.org/angra-nuclear-power-plant",
 "markdown_url": "https://www.edgepedia.org/angra-nuclear-power-plant.md",
 "license": {
  "name": "Edgepedia Community License 1.0",
  "url": "https://www.edgepedia.org/edgepedia/license",
  "summary": "Free with credit, commercial use included. AI training is open to everyone. For other uses, organizations over USD 100M in revenue or 100M monthly users license separately.",
  "spdx": "LicenseRef-Edgepedia-Community-1.0"
 },
 "credit": "\"Angra nuclear power plant\", Edgepedia (EdgeChat), https://www.edgepedia.org/angra-nuclear-power-plant. Edgepedia Community License 1.0.",
 "credit_md": "\"[Angra nuclear power plant](https://www.edgepedia.org/angra-nuclear-power-plant)\", Edgepedia (EdgeChat), [https://www.edgepedia.org/angra-nuclear-power-plant](https://www.edgepedia.org/angra-nuclear-power-plant). [Edgepedia Community License 1.0](https://www.edgepedia.org/edgepedia/license).",
 "credit_html": "\"<a href=\"https://www.edgepedia.org/angra-nuclear-power-plant\">Angra nuclear power plant</a>\", Edgepedia (EdgeChat), <a href=\"https://www.edgepedia.org/angra-nuclear-power-plant\">https://www.edgepedia.org/angra-nuclear-power-plant</a>. <a href=\"https://www.edgepedia.org/edgepedia/license\">Edgepedia Community License 1.0</a>.",
 "speakable": "The Angra nuclear power plant, officially the Central Nuclear Almirante Álvaro Alberto, is Brazil's only nuclear power station, near Angra dos Reis in Rio de Janeiro state."
}
