{
 "id": "epretrmw5g",
 "slug": "beineu-bozoy-shymkent-gas-pipeline",
 "title": "Beineu-Bozoy-Shymkent Gas Pipeline",
 "updated": "2026-10-15",
 "topic_path": [
  {
   "id": "technology",
   "label": "Technology and the built world",
   "api_url": "https://www.edgepedia.org/api/v1/topics/technology"
  },
  {
   "id": "technology.energy",
   "label": "Energy technology",
   "api_url": "https://www.edgepedia.org/api/v1/topics/technology.energy"
  },
  {
   "id": "technology.energy.energy.pipelines",
   "label": "Pipelines and fuel transport",
   "api_url": "https://www.edgepedia.org/api/v1/topics/technology.energy.energy.pipelines"
  },
  {
   "id": "technology.energy.energy.pipelines.gas-pipelines-of-russia-and-the-former-soviet-un",
   "label": "Gas pipelines of Russia and the former Soviet Union",
   "api_url": "https://www.edgepedia.org/api/v1/topics/technology.energy.energy.pipelines.gas-pipelines-of-russia-and-the-former-soviet-un"
  }
 ],
 "geo": [
  {
   "id": "geo.asia.t2001.technology.energy",
   "label": "Asia (other) · 2001 to 2020: Energy technology",
   "api_url": "https://www.edgepedia.org/api/v1/geo/geo.asia.t2001.technology.energy",
   "path": [
    {
     "id": "geo.asia",
     "label": "Asia (other)",
     "api_url": "https://www.edgepedia.org/api/v1/geo/geo.asia"
    },
    {
     "id": "geo.asia.t2001",
     "label": "Asia (other) · 2001 to 2020",
     "api_url": "https://www.edgepedia.org/api/v1/geo/geo.asia.t2001"
    },
    {
     "id": "geo.asia.t2001.technology",
     "label": "Technology and the built world",
     "api_url": "https://www.edgepedia.org/api/v1/geo/geo.asia.t2001.technology"
    },
    {
     "id": "geo.asia.t2001.technology.energy",
     "label": "Energy technology",
     "api_url": "https://www.edgepedia.org/api/v1/geo/geo.asia.t2001.technology.energy"
    }
   ]
  },
  {
   "id": "geo.asia.t2021.technology.energy.energy.pipelines",
   "label": "Asia (other) · 2021 and later: Pipelines and fuel transport",
   "api_url": "https://www.edgepedia.org/api/v1/geo/geo.asia.t2021.technology.energy.energy.pipelines",
   "path": [
    {
     "id": "geo.asia",
     "label": "Asia (other)",
     "api_url": "https://www.edgepedia.org/api/v1/geo/geo.asia"
    },
    {
     "id": "geo.asia.t2021",
     "label": "Asia (other) · 2021 and later",
     "api_url": "https://www.edgepedia.org/api/v1/geo/geo.asia.t2021"
    },
    {
     "id": "geo.asia.t2021.technology",
     "label": "Technology and the built world",
     "api_url": "https://www.edgepedia.org/api/v1/geo/geo.asia.t2021.technology"
    },
    {
     "id": "geo.asia.t2021.technology.energy",
     "label": "Energy technology",
     "api_url": "https://www.edgepedia.org/api/v1/geo/geo.asia.t2021.technology.energy"
    },
    {
     "id": "geo.asia.t2021.technology.energy.energy.pipelines",
     "label": "Pipelines and fuel transport",
     "api_url": "https://www.edgepedia.org/api/v1/geo/geo.asia.t2021.technology.energy.energy.pipelines"
    }
   ]
  }
 ],
 "excerpt": "The Beineu-Bozoy-Shymkent Gas Pipeline is a 1,450 km trunk natural gas pipeline in Kazakhstan that supplies the south and links to the Central Asia-China gas pipeline at Shymkent.",
 "snippet": "The Beineu-Bozoy-Shymkent Gas Pipeline is a 1,450 km trunk natural gas pipeline in Kazakhstan that supplies the south and links to the Central Asia-China gas pipeline at Shymkent.",
 "node": "technology.energy.energy.pipelines.gas-pipelines-of-russia-and-the-former-soviet-un",
 "markdown": "# Beineu-Bozoy-Shymkent Gas Pipeline\n\nThe Beineu-Bozoy-Shymkent Gas Pipeline (BBSh) is a trunk natural gas pipeline in [Kazakhstan](https://www.edgepedia.org/kazakhstan) that runs about 1,450 km from the gas fields of the west of the country to the densely populated southern regions, connecting at Shymkent with Line C of the Central Asia-China gas pipeline. It is described by QazaqGaz as the largest pipeline project in the history of independent Kazakhstan.<sup>[1](https://qazaqgaz.kz/storage/app/media/korporativnye-dokumenty/en/godovoj-otchet-za-2023-god.pdf)</sup> Built as a 50/50 Kazakh-Chinese joint venture and financed largely by Chinese policy banks, it supplies domestic gas to southern Kazakhstan and enables exports to China, and a second parallel line is now under construction with a Qatari partner.\n\n| Key fact | Detail |\n|---|---|\n| Route | Beineu (Mangystau Region) to Bozoy (Aktobe Region) to Shymkent, through Mangystau, Aktobe, Kyzylorda and Turkestan regions; actual length 1,449.5 km<sup>[2](https://bsgp.kz/en_US/%D0%BE-%D0%BA%D0%BE%D0%BC%D0%BF%D0%B0%D0%BD%D0%B8%D0%B8/)</sup> |\n| Technical parameters | Pipe diameter 1,067 mm; design pressure 9.8 MPa on the Bozoy-Shymkent section<sup>[3](https://china.aiddata.org/projects/73384/)</sup><sup> • </sup><sup>[4](https://hearings.ndbecology.gov.kz/Public/PubHearings/PublicHearingDetail?hearingId=27469)</sup> |\n| Capacity | 10 bcm/year originally; raised to 15 bcm/year in April 2020 with the fourth compressor station<sup>[5](https://www.gem.wiki/Beineu-Bozoy-Shymkent_Gas_Pipeline)</sup> |\n| Ownership and operation | Beineu-Shymkent Gas Pipeline LLP, a 50/50 joint venture of QazaqGaz (formerly KazTransGas) and Trans-Asia Gas Pipeline Company Limited (CNPC side)<sup>[3](https://china.aiddata.org/projects/73384/)</sup><sup> • </sup><sup>[5](https://www.gem.wiki/Beineu-Bozoy-Shymkent_Gas_Pipeline)</sup> |\n| Commissioning | Bozoy-Shymkent section in December 2013; Beineu-Bozoy section in November 2015, five months ahead of the April 2016 target<sup>[6](https://qazaqgaz.kz/storage/app/media/korporativnye-dokumenty/en/report-for-the-year-of-2017.pdf)</sup><sup> • </sup><sup>[7](https://www.kmg.kz/ru/press-center/press-releases/146/)</sup> |\n| Financing | $1.8 billion syndicated loan from China Development Bank and Bank of China for Phase I (2012); $700 million for Phase II (2015); GEM reports a $2.5 billion loan agreement running to 2028<sup>[3](https://china.aiddata.org/projects/73384/)</sup><sup> • </sup><sup>[5](https://www.gem.wiki/Beineu-Bozoy-Shymkent_Gas_Pipeline)</sup> |\n| Second line | Parallel line of about 1,450 km, up to 10 bcm/year at stage one and 15 bcm/year at stage two, built with Qatari UCC Holding; construction began in 2025<sup>[4](https://hearings.ndbecology.gov.kz/Public/PubHearings/PublicHearingDetail?hearingId=27469)</sup><sup> • </sup><sup>[8](https://primeminister.kz/en/news/oil-and-gas-condensate-production-plan-for-2025-is-962-million-tonnes-ministry-of-energy-29764)</sup> |\n\n## Purpose and route\n\nThe pipeline was conceived to meet three policy goals stated in the 2007 intergovernmental agreement between Kazakhstan and China on cooperation in constructing and operating the Kazakhstan-China gas pipeline: reliable gas supply to consumers in southern Kazakhstan, reduced dependence on imported gas, and diversification of Kazakh gas exports.<sup>[9](https://ojs.publisher.agency/index.php/ISS/article/view/2028)</sup> Before it was built, southern Kazakhstan depended heavily on gas imported from [Uzbekistan](https://www.edgepedia.org/uzbekistan) and [Turkmenistan](https://www.edgepedia.org/turkmenistan); the [International Energy Agency](https://www.edgepedia.org/international-energy-agency) notes that the South Kazakhstan Region has received gas from the Aktobe Region since the pipeline's completion, and that the line decreases Kazakhstan's dependency on Uzbek and Turkmen gas.<sup>[10](https://www.iea.org/reports/kazakhstan-energy-profile/energy-security)</sup>\n\nThe route starts at Beineu in [Mangystau Region](https://www.edgepedia.org/mangystau-region), where it ties into the Central Asia-Center (SAC-4) system, runs via the Bozoy gas metering station in Aktobe Region, and ends near Shymkent at the Akbulak gas metering station in Turkestan Region.<sup>[2](https://bsgp.kz/en_US/%D0%BE-%D0%BA%D0%BE%D0%BC%D0%BF%D0%B0%D0%BD%D0%B8%D0%B8/)</sup><sup> • </sup><sup>[9](https://ojs.publisher.agency/index.php/ISS/article/view/2028)</sup> Along the way it connects the western producing fields with the existing trunk systems Soyuz, Central Asia-Center, Bukhara-Ural, Bukhara Gas Region-Tashkent-Bishkek-Almaty, Gazli-Shymkent, and Kazakhstan-China, joining them into a single national gas transportation system.<sup>[7](https://www.kmg.kz/ru/press-center/press-releases/146/)</sup> The largest single section, 847 km, crosses Kyzylorda Region.<sup>[11](https://intergas.kz/en/news/4/388)</sup>\n\n## Construction history\n\n**Phased build.** The project company Beineu-Shymkent Gas Pipeline LLP was established in December 2010 on an equal-share basis between KazTransGas and Trans-Asia Gas Pipeline Company Limited, with a charter capital of $1 billion formed by equal contributions.<sup>[7](https://www.kmg.kz/ru/press-center/press-releases/146/)</sup><sup> • </sup><sup>[2](https://bsgp.kz/en_US/%D0%BE-%D0%BA%D0%BE%D0%BC%D0%BF%D0%B0%D0%BD%D0%B8%D0%B8/)</sup> Construction proceeded in stages. The Bozoy-Shymkent linear section (km 311 to 1,453) and the Bozoy gas metering unit, with throughput up to 2.5 billion m³ per year, were accepted in December 2013.<sup>[6](https://qazaqgaz.kz/storage/app/media/korporativnye-dokumenty/en/report-for-the-year-of-2017.pdf)</sup> The Beineu-Bozoy section (km 0 to 311) was commissioned on November 20, 2015, five months earlier than the planned April 2016 date, with KazTransGas reporting savings of about 150 billion tenge (roughly $500 million) against the planned cost.<sup>[7](https://www.kmg.kz/ru/press-center/press-releases/146/)</sup>\n\n**Capacity growth.** The main Bozoy compressor station and the Karaozek line compressor station entered service in November 2017, bringing throughput to the project level of 6 billion m³ per year.<sup>[6](https://qazaqgaz.kz/storage/app/media/korporativnye-dokumenty/en/report-for-the-year-of-2017.pdf)</sup> Three further compressor stations were commissioned in April 2019 as part of the expansion from 10 to 15 bcm/year, and the fourth, Ustyurt (KS-1A) in the Baiganin District of Aktobe Region, followed in April 2020, completing the 15 bcm/year capacity.<sup>[10](https://www.iea.org/reports/kazakhstan-energy-profile/energy-security)</sup><sup> • </sup><sup>[12](https://ar2020.kmg.kz/en/strategic-report/strategy/under-investment-projects)</sup> By the end of 2017, 9.1 billion m³ had been transported since the start of operations.<sup>[6](https://qazaqgaz.kz/storage/app/media/korporativnye-dokumenty/en/report-for-the-year-of-2017.pdf)</sup>\n\n## Financing\n\nThe project was financed mainly with Chinese loans. In December 2012 the project company signed a $1.8 billion syndicated loan with [China Development Bank](https://www.edgepedia.org/china-development-bank) and Bank of China for Phase I, priced at three-month LIBOR plus a 2.7 percent margin during the guarantee period, with repayment to March 2028 and corporate guarantees from [KazMunayGas](https://www.edgepedia.org/kazmunaygas) and CNPC.<sup>[3](https://china.aiddata.org/projects/73384/)</sup> A further $700 million syndicated loan from the same two banks, signed in September 2015, financed Phase II, the 306.3 km Beineu-Bozoy segment.<sup>[3](https://china.aiddata.org/projects/73384/)</sup> Global Energy Monitor records a 2015 loan agreement of $2.5 billion with the two banks running to 2028 for the pipeline's construction.<sup>[5](https://www.gem.wiki/Beineu-Bozoy-Shymkent_Gas_Pipeline)</sup> The European Bank for Reconstruction and Development also considered a $356.71 million loan, disclosed in October 2018, for modernization and expansion of the Bozoi compressor station and construction of the Kereit gas metering station.<sup>[13](https://ewsdata.rightsindevelopment.org/projects/50495-beineu-shymkent-modernisation/)</sup> Published cost estimates for the whole pipeline are around $3.6 billion in the RUSI Journal account and $3.8 billion in Kazakhstan's National Energy Report.<sup>[14](https://www.researchgate.net/publication/325479813_Central_Asian_Gas_Exports_Dependency_Swapping_Russian_Patronage_for_Chinese)</sup><sup> • </sup><sup>[15](https://s3-prod.exia.kz/articles/NationalReport15_English.pdf)</sup>\n\n## Role in supply and exports\n\nThe pipeline connects to Line C of the Central Asia-China gas pipeline, allowing Kazakh gas to be exported to China; the IEA reports that capacity expansion was expected to raise stable export supplies of marketable gas to China to 10 bcm per year.<sup>[10](https://www.iea.org/reports/kazakhstan-energy-profile/energy-security)</sup> Kazakhstan began exporting gas to China in October 2017 under a contract between KazTransGas and [PetroChina](https://www.edgepedia.org/petrochina).<sup>[3](https://china.aiddata.org/projects/73384/)</sup> Domestically, the pipeline gasifies settlements in the southern regions; KazTransGas stated at the Beineu-Bozoy commissioning that 577 settlements in the southern regions, home to half the republic's population, would additionally be connected to gas.<sup>[7](https://www.kmg.kz/ru/press-center/press-releases/146/)</sup>\n\nBy early 2023 the first line was running above its design capacity, at 106 percent, and Kazakhstan's Minister of Energy Bolat Akchulakov proposed developing a feasibility study for a second pipeline, citing reliability of supply for southern Kazakhstan's growing population.<sup>[5](https://www.gem.wiki/Beineu-Bozoy-Shymkent_Gas_Pipeline)</sup>\n\n## Second line\n\nA second, parallel line of the pipeline is under construction. In May 2023, at the first Central Asia-China Summit, QazaqGaz and CNPC signed a cooperation agreement that laid the foundation for starting the second line.<sup>[16](https://intergas.kz/en/news/4/1097)</sup> After negotiations with Trans-Asia Gas Pipeline Company Ltd. failed, the second-line project became a 50/50 venture between QazaqGaz and the Qatari UCC Holding, a subsidiary of Power International Holding, under a Kazakhstan-Qatar government agreement; UCC Holding will also build two gas processing plants, the new KS-14 compressor station and the KS-14-Kostanay-Aktobe pipeline.<sup>[5](https://www.gem.wiki/Beineu-Bozoy-Shymkent_Gas_Pipeline)</sup>\n\nThe project company for the new line is Beineu-Bozoi-Shymkent 2 Ltd. Its environmental documentation describes a 1,450 km route laid in the same corridor as the first line, with a 1,067 mm diameter, working pressure of 9.81 MPa on the Bozoy-Shymkent section and 7.35 MPa on Beineu-Bozoy, throughput of up to 10 billion m³ per year at stage one and 15 billion m³ per year at stage two, and a design service life of at least 30 years.<sup>[4](https://hearings.ndbecology.gov.kz/Public/PubHearings/PublicHearingDetail?hearingId=27469)</sup> The Ministry of Energy planned construction to start in April 2025.<sup>[8](https://primeminister.kz/en/news/oil-and-gas-condensate-production-plan-for-2025-is-962-million-tonnes-ministry-of-energy-29764)</sup> Public hearings in Karmakshy District in 2025 gave a construction duration of 41 months, from September 2025 to January 2029.<sup>[17](https://www.gov.kz/memleket/entities/kyzylorda-karmakshy/press/news/details/1070499)</sup> QazaqGaz states the project is needed for energy security and gas supply to the southern and central regions, including new power projects such as the [Turkestan](https://www.edgepedia.org/turkestan) and [Kyzylorda](https://www.edgepedia.org/kyzylorda) combined-cycle gas turbines, and to maintain export volumes to China.<sup>[18](https://sk.kz/ar2025/en/oil-gas.html)</sup>\n\n## References\n\n1. [QazaqGaz Annual Report 2023](https://qazaqgaz.kz/storage/app/media/korporativnye-dokumenty/en/godovoj-otchet-za-2023-god.pdf)\n2. [About the company, Beineu-Shymkent Gas Pipeline LLP](https://bsgp.kz/en_US/%D0%BE-%D0%BA%D0%BE%D0%BC%D0%BF%D0%B0%D0%BD%D0%B8%D0%B8/)\n3. [Beineu-Bozoi-Shymkent Gas Pipeline Project financing records, AidData](https://china.aiddata.org/projects/73384/)\n4. [Public hearing notice, Beineu-Bozoi-Shymkent 2 Ltd, National Environmental Database](https://hearings.ndbecology.gov.kz/Public/PubHearings/PublicHearingDetail?hearingId=27469)\n5. [Beineu-Bozoy-Shymkent Gas Pipeline, Global Energy Monitor](https://www.gem.wiki/Beineu-Bozoy-Shymkent_Gas_Pipeline)\n6. [KazTransGas Annual Report 2017](https://qazaqgaz.kz/storage/app/media/korporativnye-dokumenty/en/report-for-the-year-of-2017.pdf)\n7. [KazTransGas JSC has connected the West with the South, KazMunayGas press release, 23 November 2015](https://www.kmg.kz/ru/press-center/press-releases/146/)\n8. [Oil and gas condensate production plan for 2025, Prime Minister of Kazakhstan](https://primeminister.kz/en/news/oil-and-gas-condensate-production-plan-for-2025-is-962-million-tonnes-ministry-of-energy-29764)\n9. [Assemgul Yerzhanova (2023), Construction of the Main Gas Pipeline \"Beineu-Shymkent\", Interdisciplinary Science Studies](https://ojs.publisher.agency/index.php/ISS/article/view/2028)\n10. [Energy security, Kazakhstan Energy Profile, IEA](https://www.iea.org/reports/kazakhstan-energy-profile/energy-security)\n11. [Kyzylorda Branch of Intergas Central Asia celebrated its tenth anniversary](https://intergas.kz/en/news/4/388)\n12. [KazMunayGas 2020 Annual Report, Performance under investment projects](https://ar2020.kmg.kz/en/strategic-report/strategy/under-investment-projects)\n13. [Beineu-Shymkent Modernisation (EBRD-50495), Early Warning System](https://ewsdata.rightsindevelopment.org/projects/50495-beineu-shymkent-modernisation/)\n14. [Farkhod Aminjonov (2018), Central Asian Gas Exports Dependency, The RUSI Journal](https://www.researchgate.net/publication/325479813_Central_Asian_Gas_Exports_Dependency_Swapping_Russian_Patronage_for_Chinese)\n15. [Kazakhstan National Energy Report 2015, KAZENERGY](https://s3-prod.exia.kz/articles/NationalReport15_English.pdf)\n16. [New gas projects of QazaqGaz and CNPC, Intergas Central Asia, 19 July 2023](https://intergas.kz/en/news/4/1097)\n17. [Public hearings on the second line of the Beineu-Bozoy-Shymkent pipeline, Karmakshy District](https://www.gov.kz/memleket/entities/kyzylorda-karmakshy/press/news/details/1070499)\n18. [Samruk-Kazyna Annual Report 2025, Oil and Gas](https://sk.kz/ar2025/en/oil-gas.html)\n\n---\n*Topic: Encyclopedia › Technology and the built world › Energy technology › Pipelines and fuel transport › Gas pipelines of Russia and the former Soviet Union*\n\n*Initially written Oct 15, 2026*\n\n*Copyright 2026 EdgeChat AI, a subsidiary of Biostate AI.*\n\nLicense: Edgepedia Community License 1.0, https://www.edgepedia.org/edgepedia/license\n",
 "same_as": [],
 "url": "https://www.edgepedia.org/beineu-bozoy-shymkent-gas-pipeline",
 "markdown_url": "https://www.edgepedia.org/beineu-bozoy-shymkent-gas-pipeline.md",
 "license": {
  "name": "Edgepedia Community License 1.0",
  "url": "https://www.edgepedia.org/edgepedia/license",
  "summary": "Free with credit, commercial use included. AI training is open to everyone. For other uses, organizations over USD 100M in revenue or 100M monthly users license separately.",
  "spdx": "LicenseRef-Edgepedia-Community-1.0"
 },
 "credit": "\"Beineu-Bozoy-Shymkent Gas Pipeline\", Edgepedia (EdgeChat), https://www.edgepedia.org/beineu-bozoy-shymkent-gas-pipeline. Edgepedia Community License 1.0.",
 "credit_md": "\"[Beineu-Bozoy-Shymkent Gas Pipeline](https://www.edgepedia.org/beineu-bozoy-shymkent-gas-pipeline)\", Edgepedia (EdgeChat), [https://www.edgepedia.org/beineu-bozoy-shymkent-gas-pipeline](https://www.edgepedia.org/beineu-bozoy-shymkent-gas-pipeline). [Edgepedia Community License 1.0](https://www.edgepedia.org/edgepedia/license).",
 "credit_html": "\"<a href=\"https://www.edgepedia.org/beineu-bozoy-shymkent-gas-pipeline\">Beineu-Bozoy-Shymkent Gas Pipeline</a>\", Edgepedia (EdgeChat), <a href=\"https://www.edgepedia.org/beineu-bozoy-shymkent-gas-pipeline\">https://www.edgepedia.org/beineu-bozoy-shymkent-gas-pipeline</a>. <a href=\"https://www.edgepedia.org/edgepedia/license\">Edgepedia Community License 1.0</a>.",
 "speakable": "The Beineu-Bozoy-Shymkent Gas Pipeline is a 1,450 km trunk natural gas pipeline in Kazakhstan that supplies the south and links to the Central Asia-China gas pipeline at Shymkent."
}
