{
 "id": "ept8qj94fz",
 "slug": "heritage-at-risk-register",
 "title": "Heritage at Risk register",
 "updated": "2026-10-15",
 "topic_path": [
  {
   "id": "places",
   "label": "Places and geography",
   "api_url": "https://www.edgepedia.org/api/v1/topics/places"
  },
  {
   "id": "places.sites",
   "label": "Parks, protected areas, and geographic heritage sites",
   "api_url": "https://www.edgepedia.org/api/v1/topics/places.sites"
  },
  {
   "id": "places.sites.heritage",
   "label": "Geographic heritage districts and memorial sites",
   "api_url": "https://www.edgepedia.org/api/v1/topics/places.sites.heritage"
  },
  {
   "id": "places.sites.heritage.heritage-designation",
   "label": "Heritage designation and preservation",
   "api_url": "https://www.edgepedia.org/api/v1/topics/places.sites.heritage.heritage-designation"
  },
  {
   "id": "places.sites.heritage.registers-national",
   "label": "National and regional heritage registers",
   "api_url": "https://www.edgepedia.org/api/v1/topics/places.sites.heritage.registers-national"
  },
  {
   "id": "places.sites.heritage.registers-national.england-nhle",
   "label": "National Heritage List for England and scheduled monuments in England",
   "api_url": "https://www.edgepedia.org/api/v1/topics/places.sites.heritage.registers-national.england-nhle"
  }
 ],
 "geo": [
  {
   "id": "geo.weu.t1946.places.sites.heritage",
   "label": "Western Europe · 1946 to 2000: Geographic heritage districts and memorial sites",
   "api_url": "https://www.edgepedia.org/api/v1/geo/geo.weu.t1946.places.sites.heritage",
   "path": [
    {
     "id": "geo.weu",
     "label": "Western Europe",
     "api_url": "https://www.edgepedia.org/api/v1/geo/geo.weu"
    },
    {
     "id": "geo.weu.t1946",
     "label": "Western Europe · 1946 to 2000",
     "api_url": "https://www.edgepedia.org/api/v1/geo/geo.weu.t1946"
    },
    {
     "id": "geo.weu.t1946.places",
     "label": "Places and geography",
     "api_url": "https://www.edgepedia.org/api/v1/geo/geo.weu.t1946.places"
    },
    {
     "id": "geo.weu.t1946.places.sites",
     "label": "Parks, protected areas, and geographic heritage sites",
     "api_url": "https://www.edgepedia.org/api/v1/geo/geo.weu.t1946.places.sites"
    },
    {
     "id": "geo.weu.t1946.places.sites.heritage",
     "label": "Geographic heritage districts and memorial sites",
     "api_url": "https://www.edgepedia.org/api/v1/geo/geo.weu.t1946.places.sites.heritage"
    }
   ]
  }
 ],
 "excerpt": "The Heritage at Risk register is an annual list by Historic England of England's designated historic buildings, monuments, and places considered at risk of loss.",
 "snippet": "The Heritage at Risk register is an annual list by Historic England of England's designated historic buildings, monuments, and places considered at risk of loss.",
 "node": "places.sites.heritage.registers-national.england-nhle",
 "markdown": "# Heritage at Risk register\n\n[The Heritage](https://www.edgepedia.org/the-heritage) at Risk Register is an annual list, compiled by [Historic England](https://www.edgepedia.org/historic-england), of the designated historic buildings, monuments, landscapes, and places in England that are considered to be at risk of loss through neglect, decay, or inappropriate development. It gives an annual snapshot of the health of England's historic environment and is used to prioritize conservation action and funding.<sup>[1](https://historicengland.org.uk/whats-new/news/heritage-at-risk-2025/)</sup>\n\n| Key fact | Detail |\n|---|---|\n| Publisher | Historic England, a public body sponsored by the Department for Culture, Media and Sport; the Register continues the program run by English Heritage before the 2015 reorganization<sup>[2](https://historicengland.org.uk/listing/heritage-at-risk/findings/official-statistic/statistics-method-statement/)</sup> |\n| First editions | London register 1991; national Buildings at Risk Register 1998; first Heritage at Risk Register 2008<sup>[2](https://historicengland.org.uk/listing/heritage-at-risk/findings/official-statistic/statistics-method-statement/)</sup> |\n| 2025 size | 4,891 entries across all methodology types; 138 added and 129 removed for positive reasons during the year<sup>[3](https://historicengland.org.uk/content/documents/har/har-statistics-2025/)</sup> |\n| 2025 composition | 1,460 buildings and structures, 986 places of worship, 1,864 archaeology entries, 105 parks and gardens, 3 battlefields, 4 protected wreck sites, 469 conservation areas<sup>[3](https://historicengland.org.uk/content/documents/har/har-statistics-2025/)</sup> |\n| Eligibility | Sites must be both assessed as at risk and listed or designated at certain levels; most Grade II secular buildings outside Greater London are not covered<sup>[4](https://historicengland.org.uk/listing/heritage-at-risk/search-register/selection-criteria/)</sup><sup> • </sup><sup>[2](https://historicengland.org.uk/listing/heritage-at-risk/findings/official-statistic/statistics-method-statement/)</sup> |\n| Grant support | £7.4 million of Historic England grant aid went to 123 Register entries (including conservation areas) in 2024/25<sup>[5](https://historicengland.org.uk/listing/heritage-at-risk/findings/)</sup> |\n| Publication cycle | Individual site data published each November; official statistics released each August, based on the National Heritage List for England as it stood on 31 March<sup>[6](https://historicengland.org.uk/content/documents/har/har-statistics-method-statement-2025/)</sup><sup> • </sup><sup>[2](https://historicengland.org.uk/listing/heritage-at-risk/findings/official-statistic/statistics-method-statement/)</sup> |\n\n## Scope and eligibility\n\nInclusion requires two things: the site must be assessed as being at risk, and it must be listed or designated at certain levels.<sup>[4](https://historicengland.org.uk/listing/heritage-at-risk/search-register/selection-criteria/)</sup> [The Register](https://www.edgepedia.org/the-register) does not cover non-designated heritage assets, and it does not cover most Grade II listed buildings outside London, with the exception of places of worship and buildings dual-designated as scheduled monuments.<sup>[2](https://historicengland.org.uk/listing/heritage-at-risk/findings/official-statistic/statistics-method-statement/)</sup> The reason is capacity: with over 325,000 Grade II secular buildings and structures outside [Greater London](https://www.edgepedia.org/greater-london), Historic England cannot assess them all, though some local planning authorities maintain their own local registers that do include Grade II buildings and even unlisted buildings.<sup>[2](https://historicengland.org.uk/listing/heritage-at-risk/findings/official-statistic/statistics-method-statement/)</sup>\n\nThe wider context is a large designated stock. The [National Heritage List for England](https://www.edgepedia.org/national-heritage-list-for-england) carries around 380,000 entries for listed buildings including places of worship, of which about 2.5% are Grade I and about 5.8% are Grade II*, plus almost 20,000 scheduled monuments and nearly 10,000 conservation areas designated by local planning authorities.<sup>[2](https://historicengland.org.uk/listing/heritage-at-risk/findings/official-statistic/statistics-method-statement/)</sup>\n\n## Assessment methodologies\n\nAssets are assessed under seven methodology types, matched to the nature of the site: buildings and structures, places of worship, archaeology, parks and gardens, battlefields, wreck sites, and conservation areas.<sup>[4](https://historicengland.org.uk/listing/heritage-at-risk/search-register/selection-criteria/)</sup> Assessments may be made through on-site checks or desk-based work, and a dual-designated site can carry entries under more than one methodology if both its structural and below-ground elements are at risk.<sup>[2](https://historicengland.org.uk/listing/heritage-at-risk/findings/official-statistic/statistics-method-statement/)</sup>\n\n**Buildings and structures.** Secular buildings must be listed Grade I or II* nationally, Grade II in Greater London, or be structural scheduled monuments with upstanding remains. They are assessed on condition (very bad, poor, fair, or good) and, where applicable, occupancy, since an occupied building is generally less vulnerable than a vacant one. A building is removed once it is fully repaired and its future is secured through occupation and use or appropriate management.<sup>[4](https://historicengland.org.uk/listing/heritage-at-risk/search-register/selection-criteria/)</sup>\n\n**Places of worship.** Listed buildings of any grade in use as a public place of worship at least six times a year are eligible. The occupancy criterion is not used, because by their nature places of worship are in use; assessment rests on condition alone, and a building in very bad or poor condition is added to the Register. If a major element such as a tower is at risk, professional judgment may put the whole building on the Register.<sup>[4](https://historicengland.org.uk/listing/heritage-at-risk/search-register/selection-criteria/)</sup> In April 2024 there were approximately 14,800 listed places of worship in England.<sup>[2](https://historicengland.org.uk/listing/heritage-at-risk/findings/official-statistic/statistics-method-statement/)</sup>\n\n**Archaeology.** Only scheduled monuments on the National Heritage List for England are considered, covering earthworks and buried archaeology. Although protected by law, such sites face pressures outside the planning system, including damage from cultivation, forestry, scrub growth, animal burrowing, and erosion. Entries are removed once sufficient progress has been made to demonstrate a significant reduction in risk.<sup>[4](https://historicengland.org.uk/listing/heritage-at-risk/search-register/selection-criteria/)</sup>\n\n**Parks and gardens, battlefields, and wrecks.** Registered parks and gardens of all grades are eligible, and are typically affected by development and neglect, often compounded by divided ownership. Registered battlefields are judged against four criteria: landscape readability, survival of significant landscape features, archaeological integrity, and ambiance, with risks usually coming from development pressure, arable cultivation, or unregulated metal-detecting. Protected wreck sites are considered at risk if there is a significant likelihood of loss of historical, archaeological, or artistic significance within the foreseeable future, from causes ranging from unauthorised access to erosion and fishing damage; they leave the Register once an appropriate management and monitoring regime is operational.<sup>[4](https://historicengland.org.uk/listing/heritage-at-risk/search-register/selection-criteria/)</sup>\n\n**Conservation areas.** Local planning authorities designate conservation areas, and each year Historic England asks every authority in England to report on the state of its areas. Those that are deteriorating, or in very bad or poor condition and not expected to improve significantly within three years, are defined as at risk. The procedure changed in 2018: between 2009 and 2017 a 35-question online survey with weighted scores produced the assessment, but since 2018 risk status has been determined by professional judgment on a case-by-case basis, using a questionnaire and a risk assessment flow chart.<sup>[4](https://historicengland.org.uk/listing/heritage-at-risk/search-register/selection-criteria/)</sup><sup> • </sup><sup>[2](https://historicengland.org.uk/listing/heritage-at-risk/findings/official-statistic/statistics-method-statement/)</sup>\n\n## History of the program\n\nThe program began with buildings. After a survey of all listed buildings in London, English Heritage published the first annual Register of Buildings at Risk in London in 1991; the national Buildings at Risk Register followed in 1998, covering Grade I and II* listed buildings and structural scheduled monuments across England.<sup>[2](https://historicengland.org.uk/listing/heritage-at-risk/findings/official-statistic/statistics-method-statement/)</sup><sup> • </sup><sup>[7](https://historicengland.org.uk/images-books/publications/intro-2008-heritage-at-risk-register/harregisterintroacc/)</sup> In 2008 the Register was expanded into the first Heritage at Risk Register, adding scheduled monuments with non-structural remains, registered parks and gardens, registered battlefields, and protected wreck sites. Conservation areas across the rest of England were included from 2009, and places of worship gained their own methodology from 2011, when Grade II places of worship also became eligible.<sup>[2](https://historicengland.org.uk/listing/heritage-at-risk/findings/official-statistic/statistics-method-statement/)</sup>\n\nWhen [English Heritage](https://www.edgepedia.org/english-heritage) was split in 2015 into Historic England and the English Heritage Trust, Historic England kept responsibility for the Register and renamed it accordingly, as a continuation of the existing program.<sup>[2](https://historicengland.org.uk/listing/heritage-at-risk/findings/official-statistic/statistics-method-statement/)</sup>\n\n## What the numbers show\n\nThe 2008 edition reported that the proportion of England's Grade I and II* listed buildings at risk had fallen from 3.8% in 1999 to 3.2%, that 45% of entries on the 1999 baseline register had been removed as their futures were secured, and that only six buildings from that baseline had been lost.<sup>[7](https://historicengland.org.uk/images-books/publications/intro-2008-heritage-at-risk-register/harregisterintroacc/)</sup> A 2020 government review noted that around 63% of sites from the original 1999 register had been removed because their futures had been secured, and that stakeholders regarded the Register as a useful measure of the state of the historic environment that had directly helped save specific sites.<sup>[8](https://www.gov.uk/government/publications/tailored-review-of-historic-england/historic-england-tailored-review)</sup>\n\nRecent years show the balance between rescue and new risk. In 2024, 155 sites were added and 124 removed.<sup>[9](https://www.independent.co.uk/news/uk/historic-england-roman-county-durham-chris-bryant-england-b2646823.html)</sup> In 2025, 138 sites were added and 129 removed, leaving 4,891 entries, with buildings and structures rising from 1,442 to 1,460.<sup>[3](https://historicengland.org.uk/content/documents/har/har-statistics-2025/)</sup><sup> • </sup><sup>[10](https://museumsandheritage.com/advisor/posts/heritage-buildings-at-risk-grows-in-latest-heritage-at-risk-register/)</sup> Additions that year included Dr Jenner's Hut in [Gloucestershire](https://www.edgepedia.org/gloucestershire), the Brading Roman villa hypocaust on the [Isle of Wight](https://www.edgepedia.org/isle-of-wight), and workers' cottages at Cromford Mills in [Derbyshire](https://www.edgepedia.org/derbyshire); removals included Bruce Grove Public Toilets in Tottenham and Papplewick Pumping Station in Nottingham, restored after a £500,000 scheme.<sup>[1](https://historicengland.org.uk/whats-new/news/heritage-at-risk-2025/)</sup><sup> • </sup><sup>[10](https://museumsandheritage.com/advisor/posts/heritage-buildings-at-risk-grows-in-latest-heritage-at-risk-register/)</sup>\n\nHistoric England cautions that the dataset is a convenience sample of sites known to be at risk, so it cannot be used to identify statistical trends, and that inclusion does not usually imply criticism of the owner, since the factors giving rise to risk are often beyond the owner's reasonable control.<sup>[2](https://historicengland.org.uk/listing/heritage-at-risk/findings/official-statistic/statistics-method-statement/)</sup>\n\n## Registers elsewhere in the United Kingdom\n\nScotland's Buildings at Risk Register (BARR) began in 1990, developed by the Scottish Civic Trust with funding from Historic Scotland, and was maintained by [Historic Environment Scotland](https://www.edgepedia.org/historic-environment-scotland) from 2015; it listed 2,219 buildings as of January 2024. A review by Harlow Consulting found insufficient evidence that the Register had a significant impact in bringing buildings back into use, and HES paused the BARR in 2024 while considering long-term options, leaving the existing website accessible but no longer updated.<sup>[11](https://www.historicenvironment.scot/about-us/news/review-of-buildings-at-risk-register-published/)</sup> The same review noted that Historic England's Register is not in itself a direct tool for promoting restoration and reuse, and that the principal strength of Historic England's approach lies in its holistic management of buildings at risk.<sup>[12](https://app-hes-pubs-prod-neu-01.azurewebsites.net/api/file/bdc8106a-0d33-44a3-a55a-b1cc0093bd21)</sup> [Northern Ireland](https://www.edgepedia.org/northern-ireland) maintains the Heritage at Risk Northern Ireland (HARNI) register, similar in scope to the Scottish register.<sup>[12](https://app-hes-pubs-prod-neu-01.azurewebsites.net/api/file/bdc8106a-0d33-44a3-a55a-b1cc0093bd21)</sup>\n\n## References\n\n1. [Historic England Reveals its Heritage at Risk Register 2025, Historic England](https://historicengland.org.uk/whats-new/news/heritage-at-risk-2025/)\n2. [Heritage at Risk Statistics Method Statement, Historic England](https://historicengland.org.uk/listing/heritage-at-risk/findings/official-statistic/statistics-method-statement/)\n3. [2025 Heritage at Risk - Key Statistics, Historic England](https://historicengland.org.uk/content/documents/har/har-statistics-2025/)\n4. [Selection Criteria for Inclusion in the Heritage at Risk Register, Historic England](https://historicengland.org.uk/listing/heritage-at-risk/search-register/selection-criteria/)\n5. [Heritage at Risk: Latest Findings, Historic England](https://historicengland.org.uk/listing/heritage-at-risk/findings/)\n6. [Heritage at Risk Statistics Method Statement 2025, Historic England](https://historicengland.org.uk/content/documents/har/har-statistics-method-statement-2025/)\n7. [Heritage at Risk Register 2008 introduction, Historic England](https://historicengland.org.uk/images-books/publications/intro-2008-heritage-at-risk-register/harregisterintroacc/)\n8. [Historic England Tailored Review, GOV.UK](https://www.gov.uk/government/publications/tailored-review-of-historic-england/historic-england-tailored-review)\n9. [Painted Roman walls and world's first rail station put on heritage at risk list, The Independent](https://www.independent.co.uk/news/uk/historic-england-roman-county-durham-chris-bryant-england-b2646823.html)\n10. [More heritage buildings at risk in latest Heritage at Risk Register, Museums + Heritage Advisor](https://museumsandheritage.com/advisor/posts/heritage-buildings-at-risk-grows-in-latest-heritage-at-risk-register/)\n11. [Review of Buildings at Risk Register published, Historic Environment Scotland](https://www.historicenvironment.scot/about-us/news/review-of-buildings-at-risk-register-published/)\n12. [Buildings at Risk Register Review, Harlow Consulting for Historic Environment Scotland](https://app-hes-pubs-prod-neu-01.azurewebsites.net/api/file/bdc8106a-0d33-44a3-a55a-b1cc0093bd21)\n\n---\n*Topic: Encyclopedia › Places and geography › Parks, protected areas, and geographic heritage sites › Geographic heritage districts and memorial sites › Heritage designation and preservation › National and regional heritage registers › National Heritage List for England and scheduled monuments in England*\n\n*Initially written Oct 15, 2026*\n\n*Copyright 2026 EdgeChat AI, a subsidiary of Biostate AI.*\n\nLicense: Edgepedia Community License 1.0, https://www.edgepedia.org/edgepedia/license\n",
 "same_as": [],
 "url": "https://www.edgepedia.org/heritage-at-risk-register",
 "markdown_url": "https://www.edgepedia.org/heritage-at-risk-register.md",
 "license": {
  "name": "Edgepedia Community License 1.0",
  "url": "https://www.edgepedia.org/edgepedia/license",
  "summary": "Free with credit, commercial use included. AI training is open to everyone. For other uses, organizations over USD 100M in revenue or 100M monthly users license separately.",
  "spdx": "LicenseRef-Edgepedia-Community-1.0"
 },
 "credit": "\"Heritage at Risk register\", Edgepedia (EdgeChat), https://www.edgepedia.org/heritage-at-risk-register. Edgepedia Community License 1.0.",
 "credit_md": "\"[Heritage at Risk register](https://www.edgepedia.org/heritage-at-risk-register)\", Edgepedia (EdgeChat), [https://www.edgepedia.org/heritage-at-risk-register](https://www.edgepedia.org/heritage-at-risk-register). [Edgepedia Community License 1.0](https://www.edgepedia.org/edgepedia/license).",
 "credit_html": "\"<a href=\"https://www.edgepedia.org/heritage-at-risk-register\">Heritage at Risk register</a>\", Edgepedia (EdgeChat), <a href=\"https://www.edgepedia.org/heritage-at-risk-register\">https://www.edgepedia.org/heritage-at-risk-register</a>. <a href=\"https://www.edgepedia.org/edgepedia/license\">Edgepedia Community License 1.0</a>.",
 "speakable": "The Heritage at Risk register is an annual list by Historic England of England's designated historic buildings, monuments, and places considered at risk of loss."
}
