{
 "id": "ep5rg9hhev",
 "slug": "yimin-power-station",
 "title": "Yimin power station",
 "updated": "2026-10-15",
 "topic_path": [
  {
   "id": "technology",
   "label": "Technology and the built world",
   "api_url": "https://www.edgepedia.org/api/v1/topics/technology"
  },
  {
   "id": "technology.energy",
   "label": "Energy technology",
   "api_url": "https://www.edgepedia.org/api/v1/topics/technology.energy"
  },
  {
   "id": "technology.energy.energy.coal_power",
   "label": "Coal-fired power",
   "api_url": "https://www.edgepedia.org/api/v1/topics/technology.energy.energy.coal_power"
  },
  {
   "id": "technology.energy.energy.coal_power.coal-power-stations-in-china",
   "label": "Coal power stations in China",
   "api_url": "https://www.edgepedia.org/api/v1/topics/technology.energy.energy.coal_power.coal-power-stations-in-china"
  },
  {
   "id": "technology.energy.energy.coal_power.coal-power-stations-in-china.coal-power-stations-in-inner-mongolia",
   "label": "Coal power stations in Inner Mongolia",
   "api_url": "https://www.edgepedia.org/api/v1/topics/technology.energy.energy.coal_power.coal-power-stations-in-china.coal-power-stations-in-inner-mongolia"
  }
 ],
 "geo": [
  {
   "id": "geo.chn.nodate.technology.energy.energy.coal_power.coal-power-stations-in-china.coal-power-stations-in-inner-mongolia",
   "label": "China · Not dated: Coal power stations in Inner Mongolia",
   "api_url": "https://www.edgepedia.org/api/v1/geo/geo.chn.nodate.technology.energy.energy.coal_power.coal-power-stations-in-china.coal-power-stations-in-inner-mongolia",
   "path": [
    {
     "id": "geo.chn",
     "label": "China",
     "api_url": "https://www.edgepedia.org/api/v1/geo/geo.chn"
    },
    {
     "id": "geo.chn.nodate",
     "label": "China · Not dated",
     "api_url": "https://www.edgepedia.org/api/v1/geo/geo.chn.nodate"
    },
    {
     "id": "geo.chn.nodate.technology",
     "label": "Technology and the built world",
     "api_url": "https://www.edgepedia.org/api/v1/geo/geo.chn.nodate.technology"
    },
    {
     "id": "geo.chn.nodate.technology.energy",
     "label": "Energy technology",
     "api_url": "https://www.edgepedia.org/api/v1/geo/geo.chn.nodate.technology.energy"
    },
    {
     "id": "geo.chn.nodate.technology.energy.energy.coal_power",
     "label": "Coal-fired power",
     "api_url": "https://www.edgepedia.org/api/v1/geo/geo.chn.nodate.technology.energy.energy.coal_power"
    },
    {
     "id": "geo.chn.nodate.technology.energy.energy.coal_power.coal-power-stations-in-china",
     "label": "Coal power stations in China",
     "api_url": "https://www.edgepedia.org/api/v1/geo/geo.chn.nodate.technology.energy.energy.coal_power.coal-power-stations-in-china"
    },
    {
     "id": "geo.chn.nodate.technology.energy.energy.coal_power.coal-power-stations-in-china.coal-power-stations-in-inner-mongolia",
     "label": "Coal power stations in Inner Mongolia",
     "api_url": "https://www.edgepedia.org/api/v1/geo/geo.chn.nodate.technology.energy.energy.coal_power.coal-power-stations-in-china.coal-power-stations-in-inner-mongolia"
    }
   ]
  }
 ],
 "excerpt": "Yimin power station, also known as Huaneng Yimin power station, is a lignite-fired power station in Hulunbuir, Inner Mongolia, China, with six units totaling 3,400 MW, built between 1998 and 2010.",
 "snippet": "Yimin power station, also known as Huaneng Yimin power station, is a lignite-fired power station in Hulunbuir, Inner Mongolia, China, with six units totaling 3,400 MW, built between 1998 and 2010.",
 "node": "technology.energy.energy.coal_power.coal-power-stations-in-china.coal-power-stations-in-inner-mongolia",
 "markdown": "# Yimin power station\n\n**Yimin power station** (华能呼伦贝尔能源开发伊敏发电厂), also known as Huaneng Yimin power station, is an operating lignite-fired power station in Yiminhezhen, Evenki Autonomous Banner, Hulunbuir, Inner Mongolia, China, with six coal-fired units totaling 3,400 MW in service and two further 660 MW units announced<sup>[1](https://www.gem.wiki/Yimin_power_station)</sup>. It is the power half of China's first integrated coal-and-electricity enterprise, Huaneng Yimin Coal and Electricity Co., Ltd., which pairs the plant with the adjacent Yimin open-pit coal mine<sup>[2](https://m.thepaper.cn/baijiahao_30886920)</sup>.\n\n| Key fact | Detail |\n|---|---|\n| Location | Yiminhezhen, Evenki (Ewenke) Autonomous Banner, Hulunbuir, Inner Mongolia; 48.549722, 119.773889<sup>[1](https://www.gem.wiki/Yimin_power_station)</sup> |\n| Operating capacity | Six lignite-fired units totaling 3,400 MW, online 1998 to 2010; GEM lists the station as at least 3,500 MW including announced units<sup>[1](https://www.gem.wiki/Yimin_power_station)</sup> |\n| Units | Phase I: 2 x 500 MW supercritical (1998, 1999); Phase II: 2 x 600 MW subcritical with CHP (2007, 2008); Phase III: 2 x 600 MW supercritical with CHP (2010)<sup>[1](https://www.gem.wiki/Yimin_power_station)</sup><sup> • </sup><sup>[3](https://www.china5e.com/news/news-145219-1.html)</sup> |\n| Ownership | Huaneng Yimin Coal and Power Co Ltd (100%), parent China Huaneng Group Co Ltd (100%)<sup>[1](https://www.gem.wiki/Yimin_power_station)</sup> |\n| Fuel | Domestic lignite, delivered from the adjacent Yimin open-pit mine by enclosed conveyor<sup>[1](https://www.gem.wiki/Yimin_power_station)</sup><sup> • </sup><sup>[2](https://m.thepaper.cn/baijiahao_30886920)</sup> |\n| Mine capacity | Yimin open-pit mine approved at 35 million tonnes per year in 2022; 2022 single-mine output ranked first nationally<sup>[4](https://www.gem.wiki/Yimin_Surface_Mine)</sup><sup> • </sup><sup>[2](https://m.thepaper.cn/baijiahao_30886920)</sup> |\n| Estimated CO2 | 16.0 Mt per year, with an estimated investment need of 5.7 billion dollars listed by SwitchCoal<sup>[5](https://www.switchcoal.org/en/region/inner-mongolia)</sup> |\n\n## Phases and units\n\n**Phase I** was built with two 500 MW supercritical units supplied from Russia, connected to the grid on 9 November 1998 and 14 September 1999 after 168-hour trial runs<sup>[3](https://www.china5e.com/news/news-145219-1.html)</sup><sup> • </sup><sup>[6](https://ztpd.nmgnews.com.cn/system/2009/12/16/010349657.shtml)</sup>. The accompanying open-pit mine reached its design output of 5 million tonnes per year in 1998<sup>[6](https://ztpd.nmgnews.com.cn/system/2009/12/16/010349657.shtml)</sup>.\n\n**Phase II** added two 600 MW domestic subcritical units with combined heat and power capability. The state approved the phase, together with a 6-million-tonne-per-year mine expansion, in March 2005, and both units entered service in 2007 and 2008<sup>[3](https://www.china5e.com/news/news-145219-1.html)</sup>.\n\n**Phase III** comprised two further 600 MW supercritical units. Unit 6 passed its 168-hour trial run in December 2010 and was handed over to production after a construction period of only 17 months, a record for comparable units in China's high-cold regions at the time; the plant sits at high latitude with an average annual temperature of −4 degrees Celsius and winters of up to eight months<sup>[3](https://www.china5e.com/news/news-145219-1.html)</sup>. With Phase III complete, the company's installed capacity reached 3,400 MW<sup>[3](https://www.china5e.com/news/news-145219-1.html)</sup>.\n\n## The coal-electricity integration model\n\nThe [State Council](https://www.edgepedia.org/state-council) designated Yimin as China's first coal-electricity joint-operation pilot, approving the integration plan in 1989; the Yimin Coal and Electricity Company was founded in 1991<sup>[2](https://m.thepaper.cn/baijiahao_30886920)</sup><sup> • </sup><sup>[7](https://rmrb.zhouenlai.info/%E4%BA%BA%E6%B0%91%E6%97%A5%E6%8A%A5%EF%BC%881946-2003%EF%BC%89/1998/08/1998-08-10.htm)</sup>. The design principle was to convert coal into electricity on site rather than ship the coal, summarized in the slogan \"let the coal travel through the air\"<sup>[7](https://rmrb.zhouenlai.info/%E4%BA%BA%E6%B0%91%E6%97%A5%E6%8A%A5%EF%BC%881946-2003%EF%BC%89/1998/08/1998-08-10.htm)</sup>.\n\nThe integration is physical as well as corporate. Two enclosed conveyor corridors link the mine and the plant: a blue corridor carries coal to the boilers, and an orange corridor returns combustion ash to backfill mined-out pits. The plant supplies production electricity to the mine and waste heat to industrial and [residential areas](https://www.edgepedia.org/residential-area), while groundwater drained from the coalfield is piped about 4.8 km to serve as the power station's water source. The 1998 [People's Daily](https://www.edgepedia.org/peoples-daily) report credited this water-coal-ash cycling with saving several hundred million yuan of investment in Phase I alone<sup>[7](https://rmrb.zhouenlai.info/%E4%BA%BA%E6%B0%91%E6%97%A5%E6%8A%A5%EF%BC%881946-2003%EF%BC%89/1998/08/1998-08-10.htm)</sup><sup> • </sup><sup>[2](https://m.thepaper.cn/baijiahao_30886920)</sup>.\n\nThe integrated structure also buffered the plant against coal-price swings. In 2008, a year in which rising coal prices pushed many standalone power generators into loss, Yimin generated 10.72 billion kWh, produced 13.83 million tonnes of coal, and recorded a profit of 867 million yuan<sup>[8](https://finance.sina.cn/2021-06-11/detail-ikqciyzi8971521.d.html?vt=4)</sup>. In 2023, 69.9% of the coal sold by Huaneng's mines went to the group's own power plants, with the Yimin base cited as a model of cost efficiency<sup>[9](https://www.hkexnews.hk/listedco/listconews/sehk/2024/0708/2024070800202_c.pdf)</sup>.\n\n## The associated mine\n\nThe Yimin open-pit mine lies in the same coalfield as the plant and is owned by the same Huaneng subsidiary<sup>[4](https://www.gem.wiki/Yimin_Surface_Mine)</sup>. The National Mine Safety Administration approved an expansion of its capacity to 35 million tonnes per year in April 2022, and Chinese sources report that its single-mine output ranked first nationally that year<sup>[4](https://www.gem.wiki/Yimin_Surface_Mine)</sup><sup> • </sup><sup>[2](https://m.thepaper.cn/baijiahao_30886920)</sup>. A 2024 environmental approval for further expansion describes a mine area of 24.57 square kilometers with remaining recoverable reserves of 455 million tonnes and a remaining service life of 11.8 years, with product coal moved mainly by conveyor to the Yimin power station or by dedicated rail<sup>[10](https://www.mee.gov.cn/xxgk2018/xxgk/xxgk11/202405/t20240516_1073343.html)</sup>.\n\nThe mine has also become a testbed for mining automation. In 2025 a fleet of more than 100 unmanned pure-electric mining trucks of the \"Huaneng Ruichi\" type, which have no driver's cab, entered commercial operation at Yimin, described as the first hundred-truck deployment of unmanned electric mining trucks worldwide, with per-truck transport efficiency put at 120% of manual operation<sup>[2](https://m.thepaper.cn/baijiahao_30886920)</sup>. The Yimin open-pit mine was also among the first batch of national demonstration intelligent coal mines accepted in China<sup>[11](https://www.chng.com.cn/en/documents/816545/837789/3cdbdd89-c975-457e-9f6f-76d370e1e855.pdf)</sup>.\n\n## Heating role and retrofit\n\nThe plant is the main heat source for the surrounding area of eastern [Inner Mongolia](https://www.edgepedia.org/inner-mongolia). In 2021 the company completed a 70.46 km heating pipeline, described as the world's longest in a high-cold region<sup>[2](https://m.thepaper.cn/baijiahao_30886920)</sup>. Under China's \"three transformations\" program for coal power (energy-saving, heating-supply, and flexibility retrofits), the plant reorganized its heating system around the Phase III units 5 and 6, consolidated four separate heat networks under unified control, and reported a 5-degree-Celsius drop in return-water temperature on the open-pit network, reducing circulating-water evaporation and operating costs<sup>[12](https://www.chng.com.cn/subject/detail_25ssw/-/article/pYajnwkyFhWe/v/1294337.html)</sup>.\n\n## Expansion plans and their fate\n\nHuaneng announced in 2011 that it planned to expand the plant to 7,000 MW by 2015, and in 2014 said it would add a [Phase IV](https://www.edgepedia.org/phase-iv) of 2 x 1,000 MW; an environmental assessment tender was subsequently filed for two 600 MW units, with a longer-term plan for six more 600 MW units in three phases, a 4,800 MW expansion of the existing station<sup>[1](https://www.gem.wiki/Yimin_power_station)</sup>. A 2014 CoalSwarm report listed \"Huaneng Yimin Power Generation Phase IV\" at 3,200 MW as announced<sup>[13](https://rynek-gazu.cire.pl/pliki/2/coal_tracker_report.pdf)</sup>. GEM's current unit table lists Phase IV Units 7 and 8 at 660 MW each with announced status<sup>[1](https://www.gem.wiki/Yimin_power_station)</sup>. Following nationwide restrictions on new coal-fired capacity announced in 2016 by the National Energy Administration and the [National Development and Reform Commission](https://www.edgepedia.org/national-development-and-reform-commission), further expansion at the site appears to be on hold or canceled<sup>[1](https://www.gem.wiki/Yimin_power_station)</sup>.\n\n## Emissions and context\n\nSwitchCoal estimates the station's CO2 emissions at 16.0 Mt per year and lists an investment need of 5.7 billion dollars<sup>[5](https://www.switchcoal.org/en/region/inner-mongolia)</sup>. Satellite observations from NASA's OMI instrument show nitrogen dioxide levels above the plant declining 9.73% between 2005 and 2021, with a 2021 average of 8.358 x 10<sup>14</sup> molecules per square centimeter and an uncertainty of 11.59%<sup>[14](https://airquality.gsfc.nasa.gov/power-plants/huaneng-yimin-power-station)</sup>. The plant operates in Inner Mongolia, a region that in 2025 generated about 590 billion kWh from coal against about 277 billion kWh from wind and solar combined, and where officials describe coal units increasingly serving a supporting and regulating role alongside expanding renewables<sup>[15](https://apnews.com/article/9867147f572583e20788e4b4fdf63ce0)</sup>.\n\n## References\n\n1. [Yimin power station, Global Energy Monitor (GEM.wiki)](https://www.gem.wiki/Yimin_power_station)\n2. [四秩丰碑丨煤电一体化，它首开先河！, The Paper](https://m.thepaper.cn/baijiahao_30886920)\n3. [伊敏电厂三期通过168小时试运行, 中国能源网](https://www.china5e.com/news/news-145219-1.html)\n4. [华能伊敏煤电有限责任公司露天矿, Global Energy Monitor (GEM.wiki)](https://www.gem.wiki/Yimin_Surface_Mine)\n5. [Coal power plants in Inner Mongolia, China, SwitchCoal](https://www.switchcoal.org/en/region/inner-mongolia)\n6. [华能伊敏煤电专题, 内蒙古新闻网](https://ztpd.nmgnews.com.cn/system/2009/12/16/010349657.shtml)\n7. [让煤空中走——访我国第一个煤电联营企业伊敏煤电公司, 人民日报 1998-08-10](https://rmrb.zhouenlai.info/%E4%BA%BA%E6%B0%91%E6%97%A5%E6%8A%A5%EF%BC%881946-2003%EF%BC%89/1998/08/1998-08-10.htm)\n8. [煤电联营航母在伊敏启航, 新浪财经](https://finance.sina.cn/2021-06-11/detail-ikqciyzi8971521.d.html?vt=4)\n9. [Huaneng offering document, HKEXnews (2024)](https://www.hkexnews.hk/listedco/listconews/sehk/2024/0708/2024070800202_c.pdf)\n10. [关于华能集团华能伊敏煤电有限责任公司伊敏矿区（河西区）伊敏露天矿改扩建项目（3500万吨/年）环境影响报告书的批复, 生态环境部](https://www.mee.gov.cn/xxgk2018/xxgk/xxgk11/202405/t20240516_1073343.html)\n11. [2021 Sustainability Report of China Huaneng Group](https://www.chng.com.cn/en/documents/816545/837789/3cdbdd89-c975-457e-9f6f-76d370e1e855.pdf)\n12. [华能•奋进这5年：伊敏电厂, 中国华能集团](https://www.chng.com.cn/subject/detail_25ssw/-/article/pYajnwkyFhWe/v/1294337.html)\n13. [Boom and Bust: Tracking the Global Coal Plant Pipeline, CoalSwarm (2014)](https://rynek-gazu.cire.pl/pliki/2/coal_tracker_report.pdf)\n14. [Huaneng Yimin power station, NASA Air Quality Observations from Space](https://airquality.gsfc.nasa.gov/power-plants/huaneng-yimin-power-station)\n15. [China's Inner Mongolia bets on solar and wind but coal stays close, AP News](https://apnews.com/article/9867147f572583e20788e4b4fdf63ce0)\n\n---\n*Topic: Encyclopedia › Technology and the built world › Energy technology › Coal-fired power › Coal power stations in China › Coal power stations in Inner Mongolia*\n\n*Initially written Oct 15, 2026*\n\n*Copyright 2026 EdgeChat AI, a subsidiary of Biostate AI.*\n\nLicense: Edgepedia Community License 1.0, https://www.edgepedia.org/edgepedia/license\n",
 "same_as": [],
 "url": "https://www.edgepedia.org/yimin-power-station",
 "markdown_url": "https://www.edgepedia.org/yimin-power-station.md",
 "license": {
  "name": "Edgepedia Community License 1.0",
  "url": "https://www.edgepedia.org/edgepedia/license",
  "summary": "Free with credit, commercial use included. AI training is open to everyone. For other uses, organizations over USD 100M in revenue or 100M monthly users license separately.",
  "spdx": "LicenseRef-Edgepedia-Community-1.0"
 },
 "credit": "\"Yimin power station\", Edgepedia (EdgeChat), https://www.edgepedia.org/yimin-power-station. Edgepedia Community License 1.0.",
 "credit_md": "\"[Yimin power station](https://www.edgepedia.org/yimin-power-station)\", Edgepedia (EdgeChat), [https://www.edgepedia.org/yimin-power-station](https://www.edgepedia.org/yimin-power-station). [Edgepedia Community License 1.0](https://www.edgepedia.org/edgepedia/license).",
 "credit_html": "\"<a href=\"https://www.edgepedia.org/yimin-power-station\">Yimin power station</a>\", Edgepedia (EdgeChat), <a href=\"https://www.edgepedia.org/yimin-power-station\">https://www.edgepedia.org/yimin-power-station</a>. <a href=\"https://www.edgepedia.org/edgepedia/license\">Edgepedia Community License 1.0</a>.",
 "speakable": "Yimin power station, also known as Huaneng Yimin power station, is a lignite-fired power station in Hulunbuir, Inner Mongolia, China, with six units totaling 3,400 MW, built between 1998 and 2010."
}
