# Critical path method

The critical path method (CPM) is a scheduling technique that identifies the longest chain of dependent activities in a project network, which fixes the minimum time in which the project can finish, and shows which jobs can slip without moving the completion date. It was developed in the late 1950s as a joint venture between the DuPont Chemical Company and the computer firm Remington Rand Univac<sup>[1](https://www.jcohenpa.com/methods-of-analyzing-the-critical-path-for-proving-delay-damages-and-courts-preferences/)</sup>, and its purpose is twofold: to determine which jobs are "critical" in their effect on total project time, and how to schedule all jobs to meet a target date at minimum cost<sup>[2](https://hbr.org/1963/09/the-abcs-of-the-critical-path-method)</sup>. The underlying mathematics formulates the problem as a special parametric linear program that can be solved efficiently by network flow methods through the primal-dual algorithm<sup>[3](http://psycnet.apa.org/doi/10.1287/opre.9.3.296)</sup>.

| Key fact | Detail |
|---|---|
| Definition | The longest logical path through the CPM network; a delay to any activity on it delays project completion, absent date constraints or multiple calendars<sup>[4](https://www.alphacorporation.com/documents/49R-06.pdf)</sup> |
| Computation | A forward pass computes early start (ES) and early finish (EF); a backward pass computes late start (LS) and late finish (LF); total float = LS − ES<sup>[5](https://www.pmi.org/learning/library/critical-path-method-calculations-scheduling-8040)</sup> |
| Criticality test | In a traditional, unconstrained CPM network, critical activities have zero float; the durations along a critical path sum to the overall project duration<sup>[5](https://www.pmi.org/learning/library/critical-path-method-calculations-scheduling-8040)</sup> |
| Total vs free float | Total float = LF − EF = LS − ES; free float = the earliest early start among succeeding activities minus the activity's early finish, and free float can never exceed total float<sup>[6](http://www.civil.uwaterloo.ca/tarek/596/part3.pdf)</sup><sup> • </sup><sup>[5](https://www.pmi.org/learning/library/critical-path-method-calculations-scheduling-8040)</sup> |
| Tool settings | Primavera P6 offers two criticality definitions: a user-selectable total float threshold (default zero) and the longest path method, which traces driving logic using free float<sup>[7](https://cdn.fs.pathlms.com/oYQSbbEUQaqENeRlZ8Sq)</sup> |
| Contractual role | In US construction, CPM schedules are often a contractual requirement of owners, typically delivered within a defined window after contract signing (e.g., 10–30 days)<sup>[8](https://acris.aalto.fi/ws/portalfiles/portal/86966677/ENG_Scala_et_al_Comparative_analysis_of_planning_EMJ.pdf)</sup> |
| Legal use | The CPM schedule is the primary evidence in schedule-related disputes for whether an event actually delayed the project's critical path<sup>[9](https://www.agc.org/sites/default/files/Files/RiskManagement/Schedule%20as%20Sword%20and%20Shield_FINAL%20(1).pdf)</sup> |

## What the critical path method is

AACE International, the professional body for cost engineering, defines the critical path as the longest logical path through the CPM network, consisting of the activities that determine the shortest time for project completion<sup>[4](https://www.alphacorporation.com/documents/49R-06.pdf)</sup>. The same idea appears in the peer-reviewed operations research literature: the minimum time to complete all activities in a network equals the length of the longest path from the source node to the destination node, which is the critical path<sup>[10](https://www.sciencedirect.com/science/article/abs/pii/S0305054809003098)</sup>. A delay of one time period to any activity on this chain extends final completion correspondingly<sup>[11](https://www.spireconsultinggroup.com/wp-content/uploads/2019/02/Roger-Nelson-article-in-Cost-Engineering.pdf)</sup>.

The method was originally practiced as activity-on-arrow deterministic scheduling and is now commonly practiced as activity-on-node scheduling, in which boxes represent activities and arrows represent dependencies<sup>[8](https://acris.aalto.fi/ws/portalfiles/portal/86966677/ENG_Scala_et_al_Comparative_analysis_of_planning_EMJ.pdf)</sup>.

## How the critical path is computed

**Forward pass.** Analysis always starts with the forward pass, which calculates how soon each activity can start based on the logic of the network, activity durations, and any imposed constraints, producing an early start time (ES) and early finish time (EF) for every activity and milestone<sup>[12](https://mosaicprojects.com.au/PDF/Schedule_Calculations.pdf)</sup>. The arithmetic is: Early Start = the maximum EF value from immediate predecessors; Early Finish = ES + Duration<sup>[5](https://www.pmi.org/learning/library/critical-path-method-calculations-scheduling-8040)</sup>. The forward pass determines the total project duration<sup>[13](https://www.jstage.jst.go.jp/article/jscejcm/69/4/69_I_97/_pdf/-char/en)</sup>.

**Backward pass.** The backward pass then calculates how late each activity can start and finish without delaying project completion or an imposed constraint, working from finish to beginning<sup>[12](https://mosaicprojects.com.au/PDF/Schedule_Calculations.pdf)</sup>. Its formulas run in reverse: Late Start = LF − Duration, and Late Finish = the minimum LS of successors<sup>[5](https://www.pmi.org/learning/library/critical-path-method-calculations-scheduling-8040)</sup>.

**Float.** Float, or slack, is the difference between the two passes. Total float is calculated as LF − EF = LS − ES = LF − ES − d, and is equated with total slack<sup>[6](http://www.civil.uwaterloo.ca/tarek/596/part3.pdf)</sup>. The difference between early and late start is also called path float or lead-time margin, and on the critical path it is generally close to or equal to zero<sup>[14](https://opess.ethz.ch/course/section-13-3/13-3-4-network-planning/)</sup>. In a traditional, unconstrained CPM network, activities with zero float are critical; the durations along a critical path equal the overall project duration, so a delay to any one of them delays completion<sup>[5](https://www.pmi.org/learning/library/critical-path-method-calculations-scheduling-8040)</sup>. The US Defense Acquisition University's EVM 202 job aid states the same practical rule: tasks on the critical path typically have zero or very little float and cannot be delayed without delaying the project's finish time<sup>[15](https://www.dau.edu/sites/default/files/2023-09/DAU_EVM202_JobAid_Build-PDM-Network-Schedule.pdf)</sup>.

## Float, dependencies, and why schedules change

**Total versus free float.** Total float measures how long an activity can slip before the project finish date moves; free float measures how long it can slip before the early start of any succeeding activity is affected<sup>[4](https://www.alphacorporation.com/documents/49R-06.pdf)</sup><sup> • </sup><sup>[16](https://highways.dot.gov/federal-lands/pddm/cfl/cfl-guide-develop-cpm.pdf)</sup>. Free float is computed as the earliest early start among succeeding activities minus the early finish of the activity in question<sup>[6](http://www.civil.uwaterloo.ca/tarek/596/part3.pdf)</sup>, and free float can never be larger than total float<sup>[5](https://www.pmi.org/learning/library/critical-path-method-calculations-scheduling-8040)</sup>. The distinction matters in claims: delays to non-critical activities may consume available float without delaying overall project completion, but once a non-critical activity is delayed beyond its available float it becomes a critical path delay<sup>[1](https://www.jcohenpa.com/methods-of-analyzing-the-critical-path-for-proving-delay-damages-and-courts-preferences/)</sup>.

**Dependencies, leads, and lags.** Relationship types such as finish-to-start (FS) and start-to-start (SS) can each be modified by a lag factor, the time difference between predecessor and successor activities<sup>[17](https://journal.nafe.org/ojs/index.php/nafe/article/download/144/874/3039)</sup>. A lag delays the succeeding task by the specified number of time units; leads, or negative lags, accelerate it and must be used with care in some software packages<sup>[12](https://mosaicprojects.com.au/PDF/Schedule_Calculations.pdf)</sup>. Date constraints override the logical relationships that would normally drive an activity's start date<sup>[17](https://journal.nafe.org/ojs/index.php/nafe/article/download/144/874/3039)</sup>.

**Multiple and shifting paths.** Normally there is only one critical path through a network, but multiple critical paths occur when different paths have exactly the same overall duration or when constrained milestones make different paths critical simultaneously<sup>[4](https://www.alphacorporation.com/documents/49R-06.pdf)</sup>; a schedule can also have more than one branch or string of activities making up the critical path<sup>[5](https://www.pmi.org/learning/library/critical-path-method-calculations-scheduling-8040)</sup>. Activities that are not critical but may easily become critical are called near-critical activities, and schedulers must identify and monitor them<sup>[4](https://www.alphacorporation.com/documents/49R-06.pdf)</sup>. The path can shift when other work paths are delayed or changed to the point that they become the longest path, and analysts should never assume the critical path is static; experience teaches the reverse is more often true<sup>[18](https://www.traunerconsulting.com/wp-content/uploads/TRAUNER_Construction_Delays_Chapter_3.pdf)</sup>. Deliberate pacing or strategic floating of off-critical work can itself introduce risk, because a noncritical activity delayed long enough becomes critical and affects the completion date<sup>[19](https://pmaconsultants.com/publication/RISK-2196%20Removing%20the%20Early-Dates%20Bias%20in%20CPM%20Risk%20Analysis%2023%20May%2016.pdf)</sup>.

**A definitional tension.** Two definitions coexist. AACE defines the critical path as the longest logical path<sup>[4](https://www.alphacorporation.com/documents/49R-06.pdf)</sup>, while the zero-float definition, "an activity with no float is on the critical path," appears in case law and standard texts<sup>[11](https://www.spireconsultinggroup.com/wp-content/uploads/2019/02/Roger-Nelson-article-in-Cost-Engineering.pdf)</sup>. AACE itself warns that using float alone to define the critical path is often confusing, because constraints, calendars, and sequencing methods can cause sequential critical activities to carry different float values<sup>[4](https://www.alphacorporation.com/documents/49R-06.pdf)</sup>.

## How it compares with PERT, critical chain, and other methods

**PERT.** The Program Evaluation and Review Technique, developed in 1957, analyzes networks with uncertain durations by assigning each activity pessimistic, most likely, and optimistic estimates and applying the critical path method to a weighted average, using a beta distribution<sup>[19](https://pmaconsultants.com/publication/RISK-2196%20Removing%20the%20Early-Dates%20Bias%20in%20CPM%20Risk%20Analysis%2023%20May%2016.pdf)</sup><sup> • </sup><sup>[14](https://opess.ethz.ch/course/section-13-3/13-3-4-network-planning/)</sup>. In the standard comparison, PERT focuses on time management and visualizes work as activity-on-arrow, while CPM focuses on scheduling jobs to meet a target date at minimum cost, uses activity-on-node, and is sequence-oriented; the two are not mutually exclusive, but CPM is generally much more common in construction<sup>[20](https://www.procore.com/library/pert-vs-cpm-construction)</sup>.

**Critical chain.** The critical chain method, introduced by Eliyahu Goldratt in his 1997 book *Critical Chain* within the theory of constraints, extends CPM by considering resource constraints in addition to technological precedence<sup>[14](https://opess.ethz.ch/course/section-13-3/13-3-4-network-planning/)</sup><sup> • </sup><sup>[21](https://www.somaprojectcontrols.com/resources/glossary/critical-path-vs-critical-chain/)</sup>. CPM treats activities as logic-linked but assumes resources are unlimited; if two parallel activities both need the same crane, CPM does not notice, whereas critical chain makes shared-resource activities effectively sequential, so the chain can be longer than the critical path<sup>[21](https://www.somaprojectcontrols.com/resources/glossary/critical-path-vs-critical-chain/)</sup><sup> • </sup><sup>[22](https://eprints.hud.ac.uk/id/eprint/25932/1/2010_Last_Panner_%2526_crit_chain_in_const_mgmnt_comparative_analysis.pdf)</sup>. Instead of padding each task, critical chain strips activity estimates to roughly 50% confidence and aggregates the protection into an explicit project buffer plus feeding buffers; the established dimensioning start point is to halve existing activity times, with each buffer equal to a third of the related activity and buffer combination<sup>[21](https://www.somaprojectcontrols.com/resources/glossary/critical-path-vs-critical-chain/)</sup><sup> • </sup><sup>[22](https://eprints.hud.ac.uk/id/eprint/25932/1/2010_Last_Panner_%2526_crit_chain_in_const_mgmnt_comparative_analysis.pdf)</sup>. Last Planner, by contrast, was developed through [design science research](https://www.edgepedia.org/design-science-research) to alleviate practical problems of construction teams, while critical chain originated from an attempt to rectify shortcomings of CPM<sup>[22](https://eprints.hud.ac.uk/id/eprint/25932/1/2010_Last_Panner_%2526_crit_chain_in_const_mgmnt_comparative_analysis.pdf)</sup>. A peer-reviewed survey identifies CPM, Last Planner System, and location-based techniques as the three main production planning and control methods in construction<sup>[23](https://ascelibrary.com/doi/abs/10.1061/%28ASCE%29CO.1943-7862.0001644)</sup>.

## CPM in practice: industries, tools, and resource leveling

**Adoption.** In the United States, CPM schedules are often a contractual requirement of owners, who expect a CPM schedule after contract signing to guide completion within a defined timeframe, for example 10 to 30 days<sup>[8](https://acris.aalto.fi/ws/portalfiles/portal/86966677/ENG_Scala_et_al_Comparative_analysis_of_planning_EMJ.pdf)</sup>. In Galloway's 2006 study, 75% or more of respondents used CPM to support control functions during and after construction, inform execution decisions, develop lookahead schedules, coordinate subcontractors, and perform schedule impact analysis<sup>[8](https://acris.aalto.fi/ws/portalfiles/portal/86966677/ENG_Scala_et_al_Comparative_analysis_of_planning_EMJ.pdf)</sup>. Despite documented shortcomings, CPM remains the preferred choice of construction owners and contractors, even when it is not properly understood in practice<sup>[8](https://acris.aalto.fi/ws/portalfiles/portal/86966677/ENG_Scala_et_al_Comparative_analysis_of_planning_EMJ.pdf)</sup>. In UK infrastructure, CPM is described as universal, embedded in NEC4 contracts, Primavera P6, MS Project, Ministry of Defence practice, and all major projects, while critical chain is rare there, with occasional pharmaceutical and R&D use and almost no construction use<sup>[21](https://www.somaprojectcontrols.com/resources/glossary/critical-path-vs-critical-chain/)</sup>.

**Tool settings.** Primavera P6 offers two ways to define criticality: a user-selectable total float threshold, defaulting to zero, and the longest path method, which identifies the sequence of driving activities that determine the project end date using free float to trace driving logic rather than the total float calculation<sup>[7](https://cdn.fs.pathlms.com/oYQSbbEUQaqENeRlZ8Sq)</sup><sup> • </sup><sup>[11](https://www.spireconsultinggroup.com/wp-content/uploads/2019/02/Roger-Nelson-article-in-Cost-Engineering.pdf)</sup>. The longest path definition is considered preferable because total float-based criticality can miss activities or become discontinuous when activity calendars change or constraints are present; multiple calendars or finish constraints can also produce negative float, a phenomenon not possible in a pure CPM network<sup>[7](https://cdn.fs.pathlms.com/oYQSbbEUQaqENeRlZ8Sq)</sup><sup> • </sup><sup>[11](https://www.spireconsultinggroup.com/wp-content/uploads/2019/02/Roger-Nelson-article-in-Cost-Engineering.pdf)</sup>. P6's multiple float path calculation additionally identifies sub-critical float paths that could transmit delay to the most critical path<sup>[7](https://cdn.fs.pathlms.com/oYQSbbEUQaqENeRlZ8Sq)</sup>.

**Resource leveling.** Resource leveling is a separate operation applied after CPM logic, and the leveled schedule may differ substantially from the unlevelled critical path<sup>[21](https://www.somaprojectcontrols.com/resources/glossary/critical-path-vs-critical-chain/)</sup>. AACE states the consequence plainly: resource-leveled schedules usually do not show correct float values, so the total float method does not identify the correct critical path, and the resource-constrained float values displayed by software are incorrect<sup>[4](https://www.alphacorporation.com/documents/49R-06.pdf)</sup>. AACE recognizes a "resource critical path" in which activities are further delayed, interrupted, or accelerated after CPM calculations to meet a predetermined resource limit<sup>[4](https://www.alphacorporation.com/documents/49R-06.pdf)</sup>. In P6, enabling "Level Resources During Scheduling" lets resource availability influence or dictate the schedule logic and durations, so the underlying CPM no longer functions as expected<sup>[7](https://cdn.fs.pathlms.com/oYQSbbEUQaqENeRlZ8Sq)</sup>.

## Delay claims and forensic schedule analysis

The CPM schedule becomes the primary evidence for the central question in every schedule-related dispute: whether a particular event actually delayed the project's critical path<sup>[9](https://www.agc.org/sites/default/files/Files/RiskManagement/Schedule%20as%20Sword%20and%20Shield_FINAL%20(1).pdf)</sup>. In claims handling, any "delay" referred to is assumed to be critical, meaning it impacts the critical path and delays overall completion<sup>[24](https://www.americanbar.org/groups/tort_trial_insurance_practice/resources/journal/2022-fall/understanding-construction-scheduling/)</sup>.

A NAFE Journal article cites *Wilner v. United States*, 26 Cl. Ct. 260 (1992), in discussing the standard of proof for delay claims<sup>[17](https://journal.nafe.org/ojs/index.php/nafe/article/download/144/874/3039)</sup>. A functional and valid CPM network schedule must include valid activity durations and proper logic; if not, it cannot be used as a management tool or as a basis to prove a delay was caused to the critical path<sup>[17](https://journal.nafe.org/ojs/index.php/nafe/article/download/144/874/3039)</sup>. Meeting the standard requires contractors to revise durations to reflect actual experience, revise logic for out-of-sequence work, and track actual start and finish dates<sup>[17](https://journal.nafe.org/ojs/index.php/nafe/article/download/144/874/3039)</sup>. [Case law](https://www.edgepedia.org/case-law) reinforces the zero-float reading: in *Utley James Inc. v. United States* (1985), one day's delay to a zero-float activity costs one day of project completion unless it is somehow made up<sup>[11](https://www.spireconsultinggroup.com/wp-content/uploads/2019/02/Roger-Nelson-article-in-Cost-Engineering.pdf)</sup>. Courts have used CPM to resolve construction claims over the past decade, and in the post-construction phase CPM analysis is used forensically to determine what activity caused the delay and the amount of compensable delay supporting damages calculations<sup>[25](https://ascelibrary.org/doi/10.1061/%28ASCE%29LA.1943-4170.0000079)</sup><sup> • </sup><sup>[1](https://www.jcohenpa.com/methods-of-analyzing-the-critical-path-for-proving-delay-damages-and-courts-preferences/)</sup>. Because the critical path can shift as conditions change, reliance on contemporaneous project schedules enables analysts to identify which activities were actually critical at each stage<sup>[18](https://www.traunerconsulting.com/wp-content/uploads/TRAUNER_Construction_Delays_Chapter_3.pdf)</sup>.

## References

1. [Methods of Analyzing the Critical Path for Proving Delay Damages and Courts' Preferences, J. Cohen PA](https://www.jcohenpa.com/methods-of-analyzing-the-critical-path-for-proving-delay-damages-and-courts-preferences/)
2. [The ABCs of the Critical Path Method, Harvard Business Review (1963)](https://hbr.org/1963/09/the-abcs-of-the-critical-path-method)
3. [Critical-Path Planning and Scheduling: Mathematical Basis, Operations Research (1961)](http://psycnet.apa.org/doi/10.1287/opre.9.3.296)
4. [AACE International Recommended Practice 49R-06: Identifying the Critical Path](https://www.alphacorporation.com/documents/49R-06.pdf)
5. [Critical Path Method Calculations, PMI Learning Library](https://www.pmi.org/learning/library/critical-path-method-calculations-scheduling-8040)
6. [Critical-Path Analysis for Network Scheduling, University of Waterloo course notes](http://www.civil.uwaterloo.ca/tarek/596/part3.pdf)
7. [Primavera's Float Path Calculation: Review and Analysis of Applications (CDR-2966)](https://cdn.fs.pathlms.com/oYQSbbEUQaqENeRlZ8Sq)
8. [Comparative Analysis of Planning with CPM, LPS, and Location-Based Techniques in Brazil, Finland, and the United States, Engineering Management Journal](https://acris.aalto.fi/ws/portalfiles/portal/86966677/ENG_Scala_et_al_Comparative_analysis_of_planning_EMJ.pdf)
9. [Construction Schedules as Sword and Shield, Associated General Contractors of America](https://www.agc.org/sites/default/files/Files/RiskManagement/Schedule%20as%20Sword%20and%20Shield_FINAL%20(1).pdf)
10. [A solution approach to find the critical path in a time-constrained activity network, Computers & Operations Research](https://www.sciencedirect.com/science/article/abs/pii/S0305054809003098)
11. [Critical Path Definitions in Cost Engineering, via Spire Consulting Group](https://www.spireconsultinggroup.com/wp-content/uploads/2019/02/Roger-Nelson-article-in-Cost-Engineering.pdf)
12. [Schedule Calculations, Mosaic Projects](https://mosaicprojects.com.au/PDF/Schedule_Calculations.pdf)
13. [Resource-Dependent Critical Path Method for Identifying the Critical Path, Journal of JSCE](https://www.jstage.jst.go.jp/article/jscejcm/69/4/69_I_97/_pdf/-char/en)
14. [Network Planning and CPM, ETH Zurich Open Educational Resources](https://opess.ethz.ch/course/section-13-3/13-3-4-network-planning/)
15. [DAU EVM 202 Job Aid: Build a PDM Network Schedule, US Defense Acquisition University (September 2023)](https://www.dau.edu/sites/default/files/2023-09/DAU_EVM202_JobAid_Build-PDM-Network-Schedule.pdf)
16. [CFL Guidelines for Developing Critical Path Method Schedules, US Federal Highway Administration](https://highways.dot.gov/federal-lands/pddm/cfl/cfl-guide-develop-cpm.pdf)
17. [CPM Network Schedule Activities, NAFE Journal](https://journal.nafe.org/ojs/index.php/nafe/article/download/144/874/3039)
18. [Construction Delays, Second Edition, Chapter 3, Trauner Consulting](https://www.traunerconsulting.com/wp-content/uploads/TRAUNER_Construction_Delays_Chapter_3.pdf)
19. [Removing the Early-Dates Bias in CPM Risk Analysis, AACE paper RISK.2196.5](https://pmaconsultants.com/publication/RISK-2196%20Removing%20the%20Early-Dates%20Bias%20in%20CPM%20Risk%20Analysis%2023%20May%2016.pdf)
20. [PERT vs. CPM: Comparing Construction Scheduling Methods, Procore](https://www.procore.com/library/pert-vs-cpm-construction)
21. [Critical Path vs Critical Chain, SOMA Project Controls](https://www.somaprojectcontrols.com/resources/glossary/critical-path-vs-critical-chain/)
22. [Comparison of Critical Chain and Last Planner in Construction Management, University of Huddersfield Repository](https://eprints.hud.ac.uk/id/eprint/25932/1/2010_Last_Panner_%2526_crit_chain_in_const_mgmnt_comparative_analysis.pdf)
23. [Survey Comparing Critical Path Method, Last Planner System, and Location-Based Techniques, Journal of Construction Engineering and Management](https://ascelibrary.com/doi/abs/10.1061/%28ASCE%29CO.1943-7862.0001644)
24. [Understanding Construction Scheduling: A Critical Path to Successful Claims Handling, American Bar Association (2022)](https://www.americanbar.org/groups/tort_trial_insurance_practice/resources/journal/2022-fall/understanding-construction-scheduling/)
25. [Judiciary's Use of the Critical Path Method to Resolve Construction Claims, ASCE](https://ascelibrary.org/doi/10.1061/%28ASCE%29LA.1943-4170.0000079)

---
*Topic: Encyclopedia › Society and history › Economics and business › Business and work › Business and work overview › Management and workplace › Project and operations management*

*Initially written Sep 17, 2026 · Reviewed: Oct 10, 2026 · Edited: Oct 10, 2026; Oct 11, 2026; Oct 15, 2026 · Last review: Oct 10, 2026*

*Copyright 2026 EdgeChat AI, a subsidiary of Biostate AI.*

License: Edgepedia Community License 1.0, https://www.edgepedia.org/edgepedia/license
