# Interconnection queue

An interconnection queue is the list of proposed power plants and storage projects that a transmission system operator (an ISO, RTO, or utility) is processing through a series of impact studies before they can connect to the bulk electric grid. The studies establish what new transmission equipment or upgrades a project needs and assign the costs of that equipment; a project cannot be built until it completes the process and signs an interconnection agreement (IA), the contract between the transmission provider and the developer.<sup>[1](https://emp.lbl.gov/publications/queued-2025-edition-characteristics)</sup><sup> • </sup><sup>[2](https://emp.lbl.gov/news/backlog-power-plants-seeking-transmission-grid-connection-eased-somewhat-2025-amidst)</sup>

| Key fact | Detail |
|---|---|
| Scale (end of 2024) | About 10,300 active projects in U.S. queues, representing 1,400 GW of generation and roughly 890 GW of storage.<sup>[1](https://emp.lbl.gov/publications/queued-2025-edition-characteristics)</sup> |
| Recent trend | Active volume fell 12% in 2024 and another 10% in 2025, to 2,061 GW, after peaking near 2,600 GW at the end of 2023.<sup>[1](https://emp.lbl.gov/publications/queued-2025-edition-characteristics)</sup><sup> • </sup><sup>[2](https://emp.lbl.gov/news/backlog-power-plants-seeking-transmission-grid-connection-eased-somewhat-2025-amidst)</sup> |
| Completion rate | Only 13% of capacity that requested interconnection from 2000 to 2019 had reached commercial operation by the end of 2024; 77% had withdrawn.<sup>[1](https://emp.lbl.gov/publications/queued-2025-edition-characteristics)</sup> |
| Timelines | Median duration from interconnection request to commercial operation doubled from under 2 years for projects built in 2000-2007 to over 4 years for those built in 2018-2024.<sup>[1](https://emp.lbl.gov/publications/queued-2025-edition-characteristics)</sup> |
| Cost asymmetry | Withdrawn projects face average interconnection costs of $373/kW versus $73/kW for projects that completed the study process.<sup>[3](https://emp.lbl.gov/news/grid-connection-barriers-new-build-power-plants-united-states)</sup> |
| Federal reform | FERC Order 2023 (July 27, 2023) requires cluster studies on a first-ready, first-served basis, firm study deadlines with penalties, financial readiness deposits, site control, and withdrawal penalties.<sup>[4](https://www.ferc.gov/news-events/news/fact-sheet-improvements-generator-interconnection-procedures-and-agreements)</sup> |

## How the process works

A developer submits an interconnection request specifying the plant's size, location, and point of connection. The transmission provider then runs system impact and facilities studies to determine whether the project would overload transmission elements and what network upgrades, substations, lines, or other equipment, are needed to accommodate it, and who pays for them. Historically most operators processed requests serially, one at a time in queue order, so each new project had to be restudied whenever an earlier project changed or withdrew.<sup>[1](https://emp.lbl.gov/publications/queued-2025-edition-characteristics)</sup><sup> • </sup><sup>[4](https://www.ferc.gov/news-events/news/fact-sheet-improvements-generator-interconnection-procedures-and-agreements)</sup>

The process culminates in an executed interconnection agreement, but signing one is not the end of development. Projects must also secure land agreements, land-use permits, power purchasers, equipment suppliers, and financing, and withdrawal rates remain high even after an IA is signed: more than 40% of capacity with an agreement still withdrew in recent data.<sup>[2](https://emp.lbl.gov/news/backlog-power-plants-seeking-transmission-grid-connection-eased-somewhat-2025-amidst)</sup>

## Scale and composition of the U.S. queues

**The queues grew dramatically through the early 2020s.** At the end of 2023, nearly 2,600 GW of generation and storage was seeking connection, over 95% of it zero-carbon resources such as solar, wind, and battery storage; solar alone accounted for 1,086 GW.<sup>[5](https://emp.lbl.gov/publications/queued-2024-edition-characteristics)</sup> The backlog then began to shrink: active volume fell 12% during 2024, to about 10,300 projects with 1,400 GW of generation and 890 GW of storage, and fell another 10% during 2025, to 2,061 GW, as withdrawal rates stayed high and fewer new requests entered.<sup>[1](https://emp.lbl.gov/publications/queued-2025-edition-characteristics)</sup><sup> • </sup><sup>[2](https://emp.lbl.gov/news/backlog-power-plants-seeking-transmission-grid-connection-eased-somewhat-2025-amidst)</sup>

The technology mix has shifted. Solar, storage, and wind capacity all declined in 2024 and again in 2025, while active natural gas capacity rose 72% year over year in 2024 (to 136 GW) and 86% in 2025 (to 253 GW).<sup>[1](https://emp.lbl.gov/publications/queued-2025-edition-characteristics)</sup><sup> • </sup><sup>[2](https://emp.lbl.gov/news/backlog-power-plants-seeking-transmission-grid-connection-eased-somewhat-2025-amidst)</sup> Regionally, active capacity is highest in the non-ISO West (567 GW) followed by ERCOT (408 GW) as of 2025.<sup>[2](https://emp.lbl.gov/news/backlog-power-plants-seeking-transmission-grid-connection-eased-somewhat-2025-amidst)</sup>

Queue data are compiled annually by [Lawrence Berkeley National Laboratory](https://www.edgepedia.org/lawrence-berkeley-national-laboratory), in partnership with Interconnection.fyi, from more than 50 transmission grid operators covering roughly 97% to 98% of installed U.S. generating capacity; the dataset covers transmission-connected requests only, not distribution-connected or behind-the-meter projects.<sup>[1](https://emp.lbl.gov/publications/queued-2025-edition-characteristics)</sup><sup> • </sup><sup>[2](https://emp.lbl.gov/news/backlog-power-plants-seeking-transmission-grid-connection-eased-somewhat-2025-amidst)</sup>

## Completion rates and timelines

Most queued projects are never built. Of the capacity that submitted interconnection requests from 2000 to 2019, only 13% had reached commercial operation by the end of 2024, 77% had withdrawn, and 10% was still active; looking at requests from 2000 to 2020, 13% had come online by the end of 2025 and 75% had withdrawn.<sup>[1](https://emp.lbl.gov/publications/queued-2025-edition-characteristics)</sup><sup> • </sup><sup>[2](https://emp.lbl.gov/news/backlog-power-plants-seeking-transmission-grid-connection-eased-somewhat-2025-amidst)</sup> An earlier edition of the same series found that among a subset of queues, only 19% of projects (14% of capacity) seeking connection from 2000 to 2018 had been built as of the end of 2023.<sup>[5](https://emp.lbl.gov/publications/queued-2024-edition-characteristics)</sup>

Timelines have lengthened steadily. The median duration from interconnection request to commercial operation doubled from under 2 years for projects built in 2000-2007 to over 4 years for those built in 2018-2024, with a median of 5 years for projects built in 2023.<sup>[1](https://emp.lbl.gov/publications/queued-2025-edition-characteristics)</sup><sup> • </sup><sup>[5](https://emp.lbl.gov/publications/queued-2024-edition-characteristics)</sup> In 2025 the median time from request to a signed IA was well over 3 years, and the timeline to commercial operations exceeded 5 years in the regions with available data.<sup>[2](https://emp.lbl.gov/news/backlog-power-plants-seeking-transmission-grid-connection-eased-somewhat-2025-amidst)</sup>

## Costs and withdrawal

Interconnection costs, especially network upgrades billed to developers to relieve transmission constraints, are a central driver of withdrawals. Across six organized U.S. electricity markets, withdrawn projects averaged $373 per kilowatt in interconnection costs versus $73 per kilowatt for projects that completed the study process, and a quarter of projects faced costs below $25/kW while a quarter faced more than ten times as much.<sup>[3](https://emp.lbl.gov/news/grid-connection-barriers-new-build-power-plants-united-states)</sup> In the [Southwest Power Pool](https://www.edgepedia.org/southwest-power-pool), average costs for projects that completed all studies were roughly stable across two decades ($54/kW in 2002-2009, $57/kW in 2020-2022), but costs for withdrawn projects escalated from $22/kW in the 2000s to $247/kW in the 2010s and $304/kW in the early 2020s, about five times the cost of completed projects.<sup>[6](https://emp.lbl.gov/news/spp-data-show-rising-network-upgrade)</sup>

Economic research confirms these mechanisms. An NBER working paper by Sarah Johnston of the University of Wisconsin-Madison, Yifei Liu, and Chenyu Yang (December 2023) found that a long queue increases average waiting times and that high interconnection costs are a key factor in a generator's decision to withdraw; their simulations indicate that reducing waiting times, rationing entry, or charging a flat entry fee can significantly increase completed capacity.<sup>[7](https://www.nber.org/papers/w31946)</sup>

## Reform: FERC Order 2023 and regional changes

In July 2023 the Federal Energy Regulatory Commission issued Order 2023, requiring all public utilities to adopt revised interconnection procedures. Its main elements are:<sup>[4](https://www.ferc.gov/news-events/news/fact-sheet-improvements-generator-interconnection-procedures-and-agreements)</sup>

- **Cluster studies on a first-ready, first-served basis.** Transmission providers study many proposed facilities at once rather than one per study, with a 150-day cluster study timeline, and allocate shared study and network upgrade costs among participants using a proportional impact method.<sup>[4](https://www.ferc.gov/news-events/news/fact-sheet-improvements-generator-interconnection-procedures-and-agreements)</sup><sup> • </sup><sup>[8](https://www.ferc.gov/explainer-interconnection-final-rule)</sup>
- **Readiness requirements.** Customers must pay study deposits scaled to project size, demonstrate 90% site control at request submission and 100% at the facilities study agreement, post commercial readiness deposits, and face withdrawal penalties when a withdrawal materially affects other projects.<sup>[8](https://www.ferc.gov/explainer-interconnection-final-rule)</sup>
- **Firm deadlines.** The rule eliminated the prior "reasonable efforts" standard and imposes penalties on transmission providers that miss study deadlines.<sup>[8](https://www.ferc.gov/explainer-interconnection-final-rule)</sup>
- **Technology provisions.** The rule addresses co-located facilities sharing a single request, storage charging assumptions, alternative transmission technologies, and modeling standards for inverter-based resources.<sup>[4](https://www.ferc.gov/news-events/news/fact-sheet-improvements-generator-interconnection-procedures-and-agreements)</sup>

A rehearing order, Order 2023-A (March 21, 2024), clarified acceptable forms of financial security and the "option to build" for shared network upgrades; compliance filings were due in May 2024.<sup>[9](https://www.ferc.gov/sites/default/files/2024-11/FY24%20AFR%209.30.24.pdf)</sup>

**Regional operators have gone further.** [PJM Interconnection](https://www.edgepedia.org/pjm-interconnection) paused new queue reviews in 2022 to clear a backlog, then transitioned to a cycle-based process beginning in 2023; its transition queue, which started with roughly 200,000 MW of projects, was reduced to about 63 GW as of June 2025, and Cycle 1 of the new process is studying more than 800 projects totaling 220 GW, with a study turnaround of one to two years.<sup>[10](https://www.pjm.com/-/media/DotCom/about-pjm/newsroom/fact-sheets/interconnection-reform-progress-fact-sheet.pdf)</sup> Several ISOs, including MISO, SPP, and PJM, have also launched limited-term fast-track programs for reliability-critical projects, and many operators are adopting automation and AI tools to speed studies.<sup>[2](https://emp.lbl.gov/news/backlog-power-plants-seeking-transmission-grid-connection-eased-somewhat-2025-amidst)</sup> Berkeley Lab notes that it remains too early to measure the full impact of Order 2023 and the regional reforms, though the 2025 data show rising interconnection agreement volumes, with CAISO and ERCOT each executing more than 30 GW of IAs in 2025.<sup>[1](https://emp.lbl.gov/publications/queued-2025-edition-characteristics)</sup><sup> • </sup><sup>[2](https://emp.lbl.gov/news/backlog-power-plants-seeking-transmission-grid-connection-eased-somewhat-2025-amidst)</sup>

## Why the queues matter

The backlogged queues and lengthy approval processes became a major bottleneck for adding generation capacity needed for load growth, grid reliability, and electricity affordability, a concern sharpened by demand from new industrial loads such as data centers.<sup>[2](https://emp.lbl.gov/news/backlog-power-plants-seeking-transmission-grid-connection-eased-somewhat-2025-amidst)</sup><sup> • </sup><sup>[11](https://www.spglobal.com/market-intelligence/en/news-insights/research/2026/09/us-power-interconnection-queue-analysis-gas-surge-renewable-decline-2026)</sup> Because queue entry is only one step in development, queue data serve as an indicator of developer activity rather than a forecast of construction, but the gap between the roughly 2,000 GW seeking connection and the much smaller volume actually reaching commercial operation illustrates how much proposed capacity is speculative.<sup>[2](https://emp.lbl.gov/news/backlog-power-plants-seeking-transmission-grid-connection-eased-somewhat-2025-amidst)</sup>

## References

1. [Queued Up: 2025 Edition, Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2024, Lawrence Berkeley National Laboratory](https://emp.lbl.gov/publications/queued-2025-edition-characteristics)
2. [Backlog of power plants seeking transmission grid connection eased somewhat in 2025 amidst high withdrawals, Lawrence Berkeley National Laboratory (July 1, 2026)](https://emp.lbl.gov/news/backlog-power-plants-seeking-transmission-grid-connection-eased-somewhat-2025-amidst)
3. [Grid Connection Barriers To New-Build Power Plants In the United States, Lawrence Berkeley National Laboratory](https://emp.lbl.gov/news/grid-connection-barriers-new-build-power-plants-united-states)
4. [Fact Sheet: Improvements to Generator Interconnection Procedures and Agreements, Federal Energy Regulatory Commission (July 27, 2023)](https://www.ferc.gov/news-events/news/fact-sheet-improvements-generator-interconnection-procedures-and-agreements)
5. [Queued Up: 2024 Edition, Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2023, Lawrence Berkeley National Laboratory](https://emp.lbl.gov/publications/queued-2024-edition-characteristics)
6. [SPP Data Show Rising Network Upgrade Costs, Especially for Withdrawn Projects, Lawrence Berkeley National Laboratory](https://emp.lbl.gov/news/spp-data-show-rising-network-upgrade)
7. [Sarah Johnston, Yifei Liu, Chenyu Yang (2023). An Empirical Analysis of the Interconnection Queue. NBER Working Paper 31946.](https://www.nber.org/papers/w31946)
8. [Explainer on the Interconnection Final Rule, Federal Energy Regulatory Commission](https://www.ferc.gov/explainer-interconnection-final-rule)
9. [FERC Annual Financial Report FY2024, interconnection reform actions](https://www.ferc.gov/sites/default/files/2024-11/FY24%20AFR%209.30.24.pdf)
10. [New, Faster Generation Interconnection Process fact sheet, PJM Interconnection](https://www.pjm.com/-/media/DotCom/about-pjm/newsroom/fact-sheets/interconnection-reform-progress-fact-sheet.pdf)
11. [US Interconnection Queues See Natural Gas Surge as Renewables' Share Declines for Second Year, S&P Global](https://www.spglobal.com/market-intelligence/en/news-insights/research/2026/09/us-power-interconnection-queue-analysis-gas-surge-renewable-decline-2026)

---
*Topic: Encyclopedia › Technology and the built world › Energy technology › Grids and transmission › Grid equipment and concepts › Grid operation and planning concepts*

*Initially written Oct 15, 2026*

*Copyright 2026 EdgeChat AI, a subsidiary of Biostate AI.*

License: Edgepedia Community License 1.0, https://www.edgepedia.org/edgepedia/license
