# Last planner system

The Last Planner System (LPS) is a production planning and control system for design and construction, based on lean construction principles, in which the people who will execute the work make collaborative, reliable commitments at successive planning levels from milestone schedules down to weekly work plans.<sup>[1](https://escholarship.org/uc/item/1wr2c7mv)</sup><sup> • </sup><sup>[2](https://leanconstruction.org/lean-topics/last-planner-system/)</sup> Glenn Ballard is credited with its invention, beginning systematic development in 1992, with Greg Howell as a principal collaborator; the two later co-founded the Lean Construction Institute in 1997.<sup>[3](https://leanconstructionblog.com/History-of-the-Last-Planner.html)</sup> A literature review describes LPS as the most advanced and widely used lean construction technique.<sup>[4](https://pure.hud.ac.uk/en/publications/systematic-literature-review-of-design-management-in-construction/)</sup>

| Key fact | Detail |
|---|---|
| Origin | Developed by Glenn Ballard from 1992, with Greg Howell; lookahead planning added after a 1995 $1.2 billion refinery expansion project in Venezuela; pull planning and milestone planning added in the late 1990s<sup>[3](https://leanconstructionblog.com/History-of-the-Last-Planner.html)</sup> |
| Planning levels | Four tiers: master scheduling, phase scheduling, lookahead planning, and commitment/weekly work planning<sup>[1](https://escholarship.org/uc/item/1wr2c7mv)</sup> |
| Core questions | Five conversations: should, can, will, did, and learn<sup>[2](https://leanconstruction.org/lean-topics/last-planner-system/)</sup> |
| Headline metric | Percent Plan Complete (PPC), the percentage of promised weekly tasks actually completed; a PPC above 70% is treated as a reliable planning indicator<sup>[5](https://www.teras.unimal.ac.id/teras/article/view/1376)</sup> |
| Baseline problem | In traditional projects, on average only 54% of work planned for a given week is completed within the allotted schedule<sup>[2](https://leanconstruction.org/lean-topics/last-planner-system/)</sup> |
| Reported gains | Improvements tended to be from PPC levels around 50% to the 65–70% level, with a corresponding increase of about 30% in productivity; productivity improvement ranged from 10% to 40%+<sup>[6](https://leanconstruction.org/wp-content/uploads/2022/09/the-last-planner-system-of-production-control-ballard2000-dissertation.pdf)</sup> |
| Companion metrics | Tasks Anticipated (TA) and Tasks Made Ready (TMR) measure lookahead planning quality<sup>[7](https://www.mdpi.com/2075-5309/13/11/2684)</sup> |

## Purpose and intellectual background

LPS addresses the unreliability of conventional construction planning. In traditional projects, commitments made are followed through at a low rate, and the consequences include late and over-budget delivery, dissatisfied stakeholders, and worker injuries.<sup>[2](https://leanconstruction.org/lean-topics/last-planner-system/)</sup> The system aims to generate and maintain flow in work processes by promoting conversations among team members so that problems are identified before they interrupt the flow.<sup>[2](https://leanconstruction.org/lean-topics/last-planner-system/)</sup>

The intellectual setting is lean production thinking adapted to construction. The lean philosophy was adjusted to the construction sector in 1992, following [Lauri Koskela](https://www.edgepedia.org/lauri-koskela)'s publication "Application of the new production philosophy to construction".<sup>[8](https://www.scielo.cl/scielo.php?lng=en&pid=S0718-33052021000400601&script=sci_arttext)</sup> Ballard, Howell, and Koskela read *The Machine that Changed the World*, the book that popularized the word "lean", and the connection between its concepts and the Last Planner approach led to the founding of the International Group for Lean Construction in 1993.<sup>[3](https://leanconstructionblog.com/History-of-the-Last-Planner.html)</sup> The Lean Construction Institute identifies six core tenets for a lean enterprise: respect for people, removal of waste, focus on process and flow, generation of value, continuous improvement, and optimizing the whole.<sup>[2](https://leanconstruction.org/lean-topics/last-planner-system/)</sup>

## Structure: levels and conversations

The system organizes planning into four hierarchical tiers: master scheduling, which identifies major milestone dates (what should be done); phase scheduling, which specifies the processes performed by the various organizations in each phase and the handoffs between them; lookahead planning, which breaks processes down into operations, designs those operations, and makes them ready; and commitment or weekly work planning.<sup>[1](https://escholarship.org/uc/item/1wr2c7mv)</sup><sup> • </sup><sup>[9](https://www.sciencedirect.com/science/article/pii/S0926580514002039)</sup>

The Lean Construction Institute frames the same structure as five conversations around which all planning occurs: should, can, will, did, and learn.<sup>[2](https://leanconstruction.org/lean-topics/last-planner-system/)</sup> Pull planning establishes what should be done; make-ready planning gets upcoming work into a condition where it can be done; weekly work planning records the promises of specific people for the work that will be done; daily commitment management keeps last planners on track so the work did get done; and at least weekly, the last planners learn from their performance.<sup>[2](https://leanconstruction.org/lean-topics/last-planner-system/)</sup> Eight key elements align with these conversations: milestone planning, pull planning, make-ready planning, weekly work planning, constraint management, daily huddles, Percent Plan Complete, and reasons for variance.<sup>[2](https://leanconstruction.org/lean-topics/last-planner-system/)</sup>

**The last planner.** The last planner is the person closest to the work with authority to make schedule decisions and to make reliable commitments to complete the work of their discipline, typically a foreman or supervisor.<sup>[2](https://leanconstruction.org/lean-topics/last-planner-system/)</sup> A key early finding of the research was that only about half of the assignments made to construction crews were completed, which motivated the criteria of definition, soundness, sequence, size, and learning for weekly assignments.<sup>[6](https://leanconstruction.org/wp-content/uploads/2022/09/the-last-planner-system-of-production-control-ballard2000-dissertation.pdf)</sup>

## Lookahead planning and shielding

Lookahead planning is the bridge between long-term and short-term planning, and Ballard's dissertation describes its purpose as shielding production from upstream uncertainty and variation: selecting only sound assignments so that productive capacity is not wasted waiting for or looking for materials.<sup>[6](https://leanconstruction.org/wp-content/uploads/2022/09/the-last-planner-system-of-production-control-ballard2000-dissertation.pdf)</sup> Three rules govern the scheduling hierarchy: activities remain in the master schedule unless there is positive knowledge they cannot be executed as scheduled; activities remain in the lookahead window only if the planner is confident they can be made ready; and activities are released into weekly work plans only if all constraints have been removed.<sup>[6](https://leanconstruction.org/wp-content/uploads/2022/09/the-last-planner-system-of-production-control-ballard2000-dissertation.pdf)</sup>

The lookahead process also shapes work flow sequence and rate, matches work flow with capacity, decomposes master schedule activities into work packages and operations, develops detailed execution methods, and maintains a backlog of ready work.<sup>[6](https://leanconstruction.org/wp-content/uploads/2022/09/the-last-planner-system-of-production-control-ballard2000-dissertation.pdf)</sup> Early data showed how demanding anticipation is: plans as close as week 2 contained only about half the assignments that later appeared on the weekly work plans for that week, and week 3 plans contained only 40%.<sup>[6](https://leanconstruction.org/wp-content/uploads/2022/09/the-last-planner-system-of-production-control-ballard2000-dissertation.pdf)</sup>

Two metrics gauge lookahead quality. Tasks Anticipated (TA) measures how successfully lookahead planning anticipated, a few weeks ahead, the tasks to be included in the weekly work plan, and how well planners can design operations and break down tasks from the master and phase schedules. Tasks Made Ready (TMR) measures how many anticipated tasks were successfully made ready by identifying and removing their constraints.<sup>[7](https://www.mdpi.com/2075-5309/13/11/2684)</sup> [Simulation](https://www.edgepedia.org/simulation) research indicates that increasing TA can have a positive influence on reducing project duration.<sup>[9](https://www.sciencedirect.com/science/article/pii/S0926580514002039)</sup>

## Measurement and learning

PPC is the percentage of tasks completed at the end of a period, typically a week, relative to the tasks promised for that period; it compares DID to WILL.<sup>[9](https://www.sciencedirect.com/science/article/pii/S0926580514002039)</sup> In a Semarang, Indonesia mall building project managed with LPS and Primavera P6, the average PPC was 86.4%, in the good category, with implementation time efficiencies of 2 weeks on the 3rd floor and 1 week on the 4th floor compared with the conventional-schedule baseline.<sup>[5](https://www.teras.unimal.ac.id/teras/article/view/1376)</sup> A Kenyan 64-classroom project that combined LPS with concurrent engineering recorded a PPC of 83%.<sup>[10](https://uonjournals.uonbi.ac.ke/index.php/ahr/article/view/2956)</sup>

PPC has known limits as a measure. Ballard's dissertation notes that PPC does not directly measure plan quality, because success or failure in assignment completion may reflect either the quality of the assignment or its execution.<sup>[11](https://etheses.bham.ac.uk/4789/1/Ballard00PhD.pdf)</sup> Research on lookahead planning similarly found that poor lookahead planning weakens the linkage between weekly work plans and the master schedule, so that weekly planning may fail to select tasks critical to project success and PPC becomes a weak indicator of project progress.<sup>[1](https://escholarship.org/uc/item/1wr2c7mv)</sup> A study of 69 Chilean and Colombian projects examined the correlations among PPC, percent constraints removed, and the schedule performance index across five equal progress intervals, addressing the relationship between work preparation and project performance.<sup>[12](https://ascelibrary.org/doi/abs/10.1061/%28ASCE%29ME.1943-5479.0000942)</sup>

## Implementation experience and barriers

Case studies span building, infrastructure, and design work. In a Nigerian road construction project studied by action research, the initial state of production plan reliability was highly unreliable with a high degree of variability; as implementation commenced, production plans stabilized with improved schedule reliability, showing benefits even though road construction is a linear process.<sup>[13](https://ir.uitm.edu.my/id/eprint/14665)</sup> A study of sixteen Colombian construction companies found multiple ways of applying the tool along with conceptual and practical failures, and identified a lack of training and permanent feedback that prevented LPS from becoming part of corporate culture.<sup>[8](https://www.scielo.cl/scielo.php?lng=en&pid=S0718-33052021000400601&script=sci_arttext)</sup> A survey of the Vietnamese construction industry found that procedures at the team workshop and weekly work plan steps were well performed, whereas most procedures at the lookahead plan step were superficially performed; low understanding of LPS concepts was the largest barrier, language and culture issues the smallest, and indirect cost savings the most beneficial factor if the barriers were removed.<sup>[14](https://www.sciencedirect.com/science/article/pii/S1226798824000497)</sup> A systematic review of implementation factors concluded that project participants, the organization, and external enablers all need to make relevant efforts to secure the full benefits of LPS.<sup>[15](https://opus.lib.uts.edu.au/bitstream/10453/153163/2/AUBEAproceedingsbook_2021.pdf)</sup>

## Digitalization and current research

A 2024 systematic literature review of 112 studies on automating LPS planning and control identified 50 functionalities and associated benefits across six LPS stages, with the lookahead planning stage having the maximum functionalities, and found that automated planning and control can support achieving ten lean construction principles; future research directions include constraint management, knowledge reuse, dynamic replanning, and workforce training.<sup>[16](https://eprints.whiterose.ac.uk/id/eprint/211083/)</sup> Research on integrating LPS with Building Information Modeling has produced conceptual models and case-study applications, though a review found that existing tools do not support the Last Planner System to its full extent, neglecting collaborative aspects such as handoff discussions among last planners or systematic task breakdown.<sup>[17](https://www.mdpi.com/2076-3417/10/3/821)</sup> Machine learning research using LPS indicators predicted construction schedule outcomes with a mean absolute error of 1.24% and R² of 0.96 averaged across nine execution intervals, using data from 164 projects, and found that integrating LPS metrics with traditional indicators outperforms traditional metrics alone.<sup>[18](https://www.sciencedirect.com/science/article/abs/pii/S0926580524004527)</sup>

## References

1. [Hamzeh, F. (2009). Improving Construction Workflow – The Role of Production Planning and Control. eScholarship, University of California.](https://escholarship.org/uc/item/1wr2c7mv)
2. [The Last Planner System®. Lean Construction Institute.](https://leanconstruction.org/lean-topics/last-planner-system/)
3. [Richert, T. (2018). The History of the Last Planner® System. Lean Construction Blog.](https://leanconstructionblog.com/History-of-the-Last-Planner.html)
4. [Kortenko, S., Koskela, L., Tzortzopoulos, P., Haghsheno, S. Systematic Literature Review of Design Management in Construction through the Last Planner® System Perspective. University of Huddersfield.](https://pure.hud.ac.uk/en/publications/systematic-literature-review-of-design-management-in-construction/)
5. [Analisis Implementasi Last Planner System Terhadap Percent Plan Complete Pada Proyek Konstruksi dengan Menggunakan Aplikasi Primavera P6. Teras Jurnal.](https://www.teras.unimal.ac.id/teras/article/view/1376)
6. [Ballard, G. (2000). The Last Planner System of Production Control. PhD dissertation, University of Birmingham.](https://leanconstruction.org/wp-content/uploads/2022/09/the-last-planner-system-of-production-control-ballard2000-dissertation.pdf)
7. [Last Planner System Framework to Assess Planning Reliability in Architectural Design. Buildings (MDPI), 2023.](https://www.mdpi.com/2075-5309/13/11/2684)
8. [Hoyos Restrepo, M. F., Botero Botero, L. F. (2021). Implementation of the last planner system in Colombian construction sector: A case study. Revista Ingeniería de Construcción.](https://www.scielo.cl/scielo.php?lng=en&pid=S0718-33052021000400601&script=sci_arttext)
9. [Understanding the role of "tasks anticipated" in lookahead planning through simulation. Automation in Construction (ScienceDirect).](https://www.sciencedirect.com/science/article/pii/S0926580514002039)
10. [Kioko, C. W., Masu, S. M., Rukwaro, R. W. Lean Design to Lean Construction: Integrating the Last Planner System with Concurrent Engineering. Africa Habitat Review.](https://uonjournals.uonbi.ac.ke/index.php/ahr/article/view/2956)
11. [Ballard, G. (2000). The Last Planner System of Production Control. eTheses, University of Birmingham.](https://etheses.bham.ac.uk/4789/1/Ballard00PhD.pdf)
12. [Alarcón, L. F. et al. (2021). Assessing the Relationship between Constraint Management and Schedule Performance in Chilean and Colombian Construction Projects. Journal of Management in Engineering.](https://ascelibrary.org/doi/abs/10.1061/%28ASCE%29ME.1943-5479.0000942)
13. [Ahiakwo, O. et al. (2015). Implementing the Last Planner System in a Road Construction Project in Nigeria. Built Environment Journal 12(2), 33–49.](https://ir.uitm.edu.my/id/eprint/14665)
14. [Khanh, H., Kim, S. (2016). A survey on production planning system in construction projects based on Last Planner System. KSCE Journal of Civil Engineering 20(1), 1–11.](https://www.sciencedirect.com/science/article/pii/S1226798824000497)
15. [Development of A Framework for Successful Last Planner System Implementation: A Systematic Review. AUBEA Proceedings, 2021.](https://opus.lib.uts.edu.au/bitstream/10453/153163/2/AUBEAproceedingsbook_2021.pdf)
16. [Agrawal, A. K. et al. (2024). Moving toward lean construction through automation of planning and control in last planner system: A systematic literature review. Developments in the Built Environment 18.](https://eprints.whiterose.ac.uk/id/eprint/211083/)
17. [The Last Planner® System and Building Information Modeling in Construction Execution: From an Integrative Review to a Conceptual Model for Integration. Applied Sciences (MDPI), 2020.](https://www.mdpi.com/2076-3417/10/3/821)
18. [Lagos, C. I. et al. (2024). Predicting construction schedule performance with last planner system and machine learning. Automation in Construction 167, 105716.](https://www.sciencedirect.com/science/article/abs/pii/S0926580524004527)

---
*Topic: Encyclopedia › Technology and the built world › Engineering and manufacturing › Manufacturing systems and industrial engineering › Lean and just-in-time manufacturing*

*Initially written Oct 15, 2026*

*Copyright 2026 EdgeChat AI, a subsidiary of Biostate AI.*

License: Edgepedia Community License 1.0, https://www.edgepedia.org/edgepedia/license
