# 布雷德伍德核电站

**布雷德伍德核电站**（业主将其命名为布雷德伍德清洁能源中心）是位于伊利诺伊州布雷斯维尔的一座双机组核电站，距乔利埃特西南约20英里、芝加哥西南约60英里，运行两台西屋四环路压水堆，合计净容量2,386兆瓦<sup>[1](https://www.nrc.gov/docs/ML1518/ML15182A051.pdf)</sup><sup> • </sup><sup>[2](https://www.constellationenergy.com/content/dam/constellationenergy/pdfs/fact-sheets/Braidwood_Clean_Energy_Center_Fact_Sheet.pdf)</sup>。星座能源公司全资拥有该电站，它是伊利诺伊州各类发电站中规模最大的一座<sup>[2](https://www.constellationenergy.com/content/dam/constellationenergy/pdfs/fact-sheets/Braidwood_Clean_Energy_Center_Fact_Sheet.pdf)</sup><sup> • </sup><sup>[3](https://www.illinoisepi.org/publications/reports/nuclear-energy-in-il-final.pdf)</sup>。

| 关键事实 | 详情 |
|---|---|
| 反应堆 | 两台西屋四环路压水堆，各自许可热功率3,645兆瓦，毛电功率约1,260兆瓦<sup>[1](https://www.nrc.gov/docs/ML1518/ML15182A051.pdf)</sup> |
| 净容量 | 全站净发电2,386兆瓦，相当于近180万户家庭的用电量<sup>[2](https://www.constellationenergy.com/content/dam/constellationenergy/pdfs/fact-sheets/Braidwood_Clean_Energy_Center_Fact_Sheet.pdf)</sup><sup> • </sup><sup>[4](https://www.constellationenergy.com/about/locations/braidwood-clean-energy-center.html)</sup> |
| 商业运行 | 1号机组1988年7月29日、2号机组1988年10月17日投入商业运行，建设许可证于1975年12月31日签发<sup>[2](https://www.constellationenergy.com/content/dam/constellationenergy/pdfs/fact-sheets/Braidwood_Clean_Energy_Center_Fact_Sheet.pdf)</sup><sup> • </sup><sup>[1](https://www.nrc.gov/docs/ML1518/ML15182A051.pdf)</sup> |
| 许可证 | 2016年续期；1号机组许可至2046年10月17日，2号机组至2047年12月18日<sup>[5](https://www.govinfo.gov/content/pkg/FR-2016-02-03/html/2016-02070.htm)</sup><sup> • </sup><sup>[2](https://www.constellationenergy.com/content/dam/constellationenergy/pdfs/fact-sheets/Braidwood_Clean_Energy_Center_Fact_Sheet.pdf)</sup> |
| 2025年发电量 | 20,165,000兆瓦时，容量因子96.5%<sup>[2](https://www.constellationenergy.com/content/dam/constellationenergy/pdfs/fact-sheets/Braidwood_Clean_Energy_Center_Fact_Sheet.pdf)</sup> |
| 冷却方式 | 闭式循环2,537英亩冷却池，以坎卡基河为补给水源<sup>[6](https://epa.illinois.gov/content/dam/soi/en/web/epa/documents/public-notices/2014/exelon-generation.pdf)</sup> |
| 员工规模 | 683名员工；年物业税约3,000万美元<sup>[2](https://www.constellationenergy.com/content/dam/constellationenergy/pdfs/fact-sheets/Braidwood_Clean_Energy_Center_Fact_Sheet.pdf)</sup> |

## 设计与运行

布雷德伍德每台机组配备一座西屋四环路压水堆及一台西屋汽轮发电机。许可热功率约为每台3,645兆瓦，毛电功率约1,260兆瓦<sup>[1](https://www.nrc.gov/docs/ML1518/ML15182A051.pdf)</sup>。在压水堆中，加压水将堆芯热量输送到蒸汽发生器，在那里另一个独立的二回路将水煮沸驱动汽轮机。针对一种常见但错误的说法——即布雷德伍德的反应堆为巴布科克-威尔科克斯设计——核管理委员会、国际原子能机构以及电站业主均认定其为西屋四环路机组；巴布科克-威尔科克斯仅为1号机组供应蒸汽发生器，2号机组的蒸汽发生器由西屋供应，萨金特-伦迪公司担任建筑与工程设计单位<sup>[1](https://www.nrc.gov/docs/ML1518/ML15182A051.pdf)</sup><sup> • </sup><sup>[7](https://www.mdpi.com/2076-3417/10/13/4434)</sup>。每座安全壳均为压水堆干式常压结构<sup>[1](https://www.nrc.gov/docs/ML1518/ML15182A051.pdf)</sup>。

国际原子能机构列出的布雷德伍德单机组参考电功率为1,194兆瓦，而许可热功率为3,645兆瓦；两者之比约为33%，同时国际原子能机构另行列出设计净容量为1,120兆瓦<sup>[8](https://www.iaea.org/PRIS/CountryStatistics/ReactorDetails.aspx?current=737)</sup>。

**冷却系统。** 布雷德伍德采用闭式循环冷却系统，核心是一座2,537英亩的冷却池；补给水从厂址以东约五英里的[坎卡基河](https://www.edgepedia.org/zh/kankakee-river)泵入，以补偿蒸发和排污损失，排污则排回河中<sup>[6](https://epa.illinois.gov/content/dam/soi/en/web/epa/documents/public-notices/2014/exelon-generation.pdf)</sup>。《[联邦公报](https://www.edgepedia.org/zh/federal-register)》记录给出的冷却池面积为2,540英亩（1,030公顷），通常蓄水22,300英亩英尺（2,750万立方米）<sup>[9](https://www.federalregister.gov/documents/2021/07/07/2021-14456/exelon-generation-company-llc-braidwood-station-units-1-and-2)</sup>。另有一座99英亩的应急冷却池作为最终热阱，可在无额外补给水的情况下维持电站冷却系统运行30天<sup>[9](https://www.federalregister.gov/documents/2021/07/07/2021-14456/exelon-generation-company-llc-braidwood-station-units-1-and-2)</sup>。伊利诺伊州环保局认定该冷却池符合《联邦法规》第40篇第125.90(b)条关于冷却水取水结构的“最佳可行技术”等效要求，因为它仅取用维持池水位所需的水量<sup>[6](https://epa.illinois.gov/content/dam/soi/en/web/epa/documents/public-notices/2014/exelon-generation.pdf)</sup>。该湖由4,457英亩厂址上受损的农田和一座旧露天矿坑改造而成<sup>[4](https://www.constellationenergy.com/about/locations/braidwood-clean-energy-center.html)</sup>。

## 建设与调试

核管理委员会于1975年12月31日签发布雷德伍德的建设许可证，并于1987年7月2日（1号机组）和1988年5月20日（2号机组）签发运行许可证，从建设到运行历时约十二年<sup>[1](https://www.nrc.gov/docs/ML1518/ML15182A051.pdf)</sup>。1号机组于1987年5月29日首次并网，1988年7月29日投入商业运行；2号机组于1988年10月17日跟进<sup>[8](https://www.iaea.org/PRIS/CountryStatistics/ReactorDetails.aspx?current=737)</sup><sup> • </sup><sup>[2](https://www.constellationenergy.com/content/dam/constellationenergy/pdfs/fact-sheets/Braidwood_Clean_Energy_Center_Fact_Sheet.pdf)</sup>。

## 所有权、许可与监管

艾克赛隆公司于2013年5月29日提交许可证续期申请，寻求将NPF-72和NPF-77号许可证各延长20年<sup>[1](https://www.nrc.gov/docs/ML1518/ML15182A051.pdf)</sup>。核管理委员会签发的续期许可证于2016年1月27日生效，批准反应堆堆芯功率水平各不超过3,645兆瓦<sup>[5](https://www.govinfo.gov/content/pkg/FR-2016-02-03/html/2016-02070.htm)</sup>。2022年，[星座能源](https://www.edgepedia.org/zh/constellation-energy)从艾克赛隆拆分出来经营发电业务，现完全拥有并运营布雷德伍德<sup>[10](https://digitaledition.chicagotribune.com/tribune/article_popover.aspx?guid=f784dd9c-c9b7-4640-ad7c-cf99fb355ca4)</sup>。

## 性能与经济

布雷德伍德2025年发电20,165,000兆瓦时，容量因子96.5%<sup>[2](https://www.constellationenergy.com/content/dam/constellationenergy/pdfs/fact-sheets/Braidwood_Clean_Energy_Center_Fact_Sheet.pdf)</sup>。国际原子能机构数据显示，单台机组2023年发电10,562.93吉瓦时、2024年发电9,801.78吉瓦时，负荷因子分别为90.1%和90.2%，寿期累计供电333.09太瓦时，寿期能量可用因子91.1%<sup>[8](https://www.iaea.org/PRIS/CountryStatistics/ReactorDetails.aspx?current=737)</sup>。该机组在2002、2008、2011、2014、2020和2023年全年100%时间运行<sup>[8](https://www.iaea.org/PRIS/CountryStatistics/ReactorDetails.aspx?current=737)</sup>。星座能源表示其机组群以94%的容量因子运行，居行业领先水平<sup>[11](https://ipa.illinois.gov/content/dam/soi/en/web/ipa/documents/20250919-constellation-2026-epp.pdf)</sup>。电站每18个月停运一台反应堆，引入一千多名专业承包商更换燃料并进行维护<sup>[12](https://www.gmtoday.com/business/as-data-centers-seek-more-power-constellation-launches-illinois-nuclear-plant-upgrades-to-meet-rising/article_1259b586-7ca4-458c-b920-7aa3a85085e0.html)</sup>。

**经济贡献。** 据星座能源的情况介绍，电站雇用683人，年缴纳物业税约3,000万美元<sup>[2](https://www.constellationenergy.com/content/dam/constellationenergy/pdfs/fact-sheets/Braidwood_Clean_Energy_Center_Fact_Sheet.pdf)</sup>；公司位置页面给出的数字略低，约为每年2,650万美元，用于威尔县、格兰迪县和坎卡基县的学校、道路及其他公共服务<sup>[4](https://www.constellationenergy.com/about/locations/braidwood-clean-energy-center.html)</sup>。艾克赛隆时期较早的数据则称员工及承包商共800人，年工资总额超过6,000万美元<sup>[13](https://www.eia.gov/nuclear/state/illinois/)</sup>。

**州政府支持与功率提升。** 2021年《气候与公平就业法》引入了碳减排抵免，支持了布雷德伍德和拜伦核电站——据称这两座电站当年濒临关停；伊利诺伊州六座核电站中有五座获得州政府补助，最近一轮五年合计7亿美元，2027年到期<sup>[12](https://www.gmtoday.com/business/as-data-centers-seek-more-power-constellation-launches-illinois-nuclear-plant-upgrades-to-meet-rising/article_1259b586-7ca4-458c-b920-7aa3a85085e0.html)</sup><sup> • </sup><sup>[10](https://digitaledition.chicagotribune.com/tribune/article_popover.aspx?guid=f784dd9c-c9b7-4640-ad7c-cf99fb355ca4)</sup>。星座能源已在布雷德伍德和拜伦投入8亿美元进行功率提升，合计增加158兆瓦；布雷德伍德的提升工程计划于2026年春季开工、2029年完工，公司称将自行出资<sup>[12](https://www.gmtoday.com/business/as-data-centers-seek-more-power-constellation-launches-illinois-nuclear-plant-upgrades-to-meet-rising/article_1259b586-7ca4-458c-b920-7aa3a85085e0.html)</sup>。2026年1月，州长J.B.普利茨克签署《清洁可靠电网法》，结束了伊利诺伊州数十年来对新建大型核电站的禁令<sup>[12](https://www.gmtoday.com/business/as-data-centers-seek-more-power-constellation-launches-illinois-nuclear-plant-upgrades-to-meet-rising/article_1259b586-7ca4-458c-b920-7aa3a85085e0.html)</sup>。星座能源还指出，通过重启核电站和提升其功率，到2040年可新增约1.6吉瓦容量，同时通过按期续证维持近8吉瓦在运。<sup>[11](https://ipa.illinois.gov/content/dam/soi/en/web/ipa/documents/20250919-constellation-2026-epp.pdf)</sup>

## 关键数据

- 净容量：两台机组合计2,386兆瓦<sup>[2](https://www.constellationenergy.com/content/dam/constellationenergy/pdfs/fact-sheets/Braidwood_Clean_Energy_Center_Fact_Sheet.pdf)</sup>
- 许可热功率：每台3,645兆瓦；国际原子能机构列出的参考电功率为1,194兆瓦，设计净容量为1,120兆瓦<sup>[1](https://www.nrc.gov/docs/ML1518/ML15182A051.pdf)</sup><sup> • </sup><sup>[8](https://www.iaea.org/PRIS/CountryStatistics/ReactorDetails.aspx?current=737)</sup>
- 2025年发电量：20,165,000兆瓦时，容量因子96.5%<sup>[2](https://www.constellationenergy.com/content/dam/constellationenergy/pdfs/fact-sheets/Braidwood_Clean_Energy_Center_Fact_Sheet.pdf)</sup>
- 寿期发电量：333.09太瓦时，寿期可用率91.1%<sup>[8](https://www.iaea.org/PRIS/CountryStatistics/ReactorDetails.aspx?current=737)</sup>
- 冷却湖：2,537英亩，蓄水约22,300英亩英尺<sup>[6](https://epa.illinois.gov/content/dam/soi/en/web/epa/documents/public-notices/2014/exelon-generation.pdf)</sup><sup> • </sup><sup>[9](https://www.federalregister.gov/documents/2021/07/07/2021-14456/exelon-generation-company-llc-braidwood-station-units-1-and-2)</sup>
- 厂址：伊利诺伊州布雷斯维尔，4,457英亩<sup>[2](https://www.constellationenergy.com/content/dam/constellationenergy/pdfs/fact-sheets/Braidwood_Clean_Energy_Center_Fact_Sheet.pdf)</sup>

## 与伊利诺伊州其他电站的比较

伊利诺伊州有六座核电站、11台反应堆，大部分由星座能源拥有，无碳发电量超过9,000万兆瓦时，支撑5,000多个就业岗位<sup>[14](https://icc.illinois.gov/api/web-management/documents/downloads/public/eagenda/RA%20Policy%20Sessions%202%20Combined%20Deck%20-%20FINAL.pdf)</sup>。布雷德伍德规模最大：伊利诺伊州商务委员会数据列其铭牌容量为2,389兆瓦，领先于拜伦的2,347兆瓦、拉萨尔的2,320兆瓦、阔德城的1,871兆瓦和德累斯顿的1,845兆瓦<sup>[14](https://icc.illinois.gov/api/web-management/documents/downloads/public/eagenda/RA%20Policy%20Sessions%202%20Combined%20Deck%20-%20FINAL.pdf)</sup>。按净夏季容量计，布雷德伍德的2,330兆瓦也超过该州最大的化石燃料电站——鲍德温燃煤电站的1,778兆瓦和普雷里州燃煤电站的1,628兆瓦<sup>[3](https://www.illinoisepi.org/publications/reports/nuclear-energy-in-il-final.pdf)</sup>。

设计上将机组群分为两大家族：伊利诺伊州的压水堆位于布雷德伍德和拜伦，沸水堆位于德累斯顿、克林顿、拉萨尔和阔德城<sup>[15](https://iemaohs.illinois.gov/content/dam/soi/en/web/iemaohs/nrs/documents/bnfs-powerplantbrochure.pdf)</sup>。拜伦与布雷德伍德共用西屋四环路压水堆设计，并在同一份核管理委员会安全评价下建造<sup>[1](https://www.nrc.gov/docs/ML1518/ML15182A051.pdf)</sup>。有一座电站在所有权上有所不同：阔德城75%归星座能源、25%归中美能源，而布雷德伍德及伊利诺伊州其他星座能源电站均为星座能源全资拥有<sup>[14](https://icc.illinois.gov/api/web-management/documents/downloads/public/eagenda/RA%20Policy%20Sessions%202%20Combined%20Deck%20-%20FINAL.pdf)</sup>。

## 环境与监管记录

**氚泄漏。** 氚是氢的放射性同位素，曾通过一条42英寸循环水排放管道及相关真空破坏器的历史泄漏进入布雷德伍德的地下水，该管道将水输送约五英里至坎卡基河。1998年和2000年泄漏了数百万加仑，自1996年以来还有更多较小的泄漏；该管线也用于定期排放液态放射性流出物，持证人已在调查期间暂停排放<sup>[16](https://www.nrc.gov/docs/ML0603/ML060340583.pdf)</sup>。2006年1月31日，艾克赛隆通知核管理委员会第三区，在布雷德伍德沙丘森林保护区的监测井样本中发现可检测水平的氚，浓度为每升24,800皮居里<sup>[16](https://www.nrc.gov/docs/ML0603/ML060340583.pdf)</sup>。1、2、3号真空破坏器附近的氚浓度在6,000至58,500皮居里/升之间，2号和3号真空破坏器附近场内及场外深井测得高达约247,000皮居里/升<sup>[16](https://www.nrc.gov/docs/ML0603/ML060340583.pdf)</sup>。核管理委员会独立实验室分析显示，附近一处住宅的饮用水井为1,300至1,500皮居里/升，仅为环保局饮用水标准20,000皮居里/升的一小部分<sup>[16](https://www.nrc.gov/docs/ML0603/ML060340583.pdf)</sup>。

**执法与应对。** 2004年秋该电站发生泄漏、部分场内井检测到氚之后，伊利诺伊州环保局意识到此类设施地下水可能存在氚污染<sup>[17](https://epa.illinois.gov/topics/community-relations/sites/exelon-braidwood.html)</sup>。2006年3月16日，伊利诺伊州总检察长莉萨·麦迪根和州检察官格拉斯哥就1996年以来的含氚废水泄漏提起诉讼<sup>[18](https://illinoisattorneygeneral.gov/News-Room/2006-2018-Press-Archive/200603-16%20GLASGOW%20FILE%20SUIT%20FOR%20RADIOACTIVE%20LEAKS%20AT%20BRAIDWOOD%20NUCLEAR%20PLANT.pdf)</sup>。2006年6月30日，核管理委员会披露一项“白色”发现，并向艾克赛隆发电公司发出违规通知，指其在以往泄漏后疏于开展调查、疏于公共环境影响评估、疏于许可证所涉放射性物质的管控。<sup>[13](https://www.eia.gov/nuclear/state/illinois/)</sup>

## References

1. [Safety Evaluation Report Related to License Renewal of Byron Station and Braidwood Station, NRC](https://www.nrc.gov/docs/ML1518/ML15182A051.pdf)
2. [Braidwood Clean Energy Center Fact Sheet, Constellation Energy](https://www.constellationenergy.com/content/dam/constellationenergy/pdfs/fact-sheets/Braidwood_Clean_Energy_Center_Fact_Sheet.pdf)
3. [Nuclear Energy in Illinois, Illinois Economic Policy Institute](https://www.illinoisepi.org/publications/reports/nuclear-energy-in-il-final.pdf)
4. [Braidwood Clean Energy Center, Constellation Energy locations page](https://www.constellationenergy.com/about/locations/braidwood-clean-energy-center.html)
5. [Federal Register (February 3, 2016): Braidwood Station license renewal and record of decision](https://www.govinfo.gov/content/pkg/FR-2016-02-03/html/2016-02070.htm)
6. [Illinois EPA public notice, Exelon Generation, Braidwood Station NPDES (February 19, 2014)](https://epa.illinois.gov/content/dam/soi/en/web/epa/documents/public-notices/2014/exelon-generation.pdf)
7. [A Global Review of PWR Nuclear Power Plants, Applied Sciences (2020)](https://www.mdpi.com/2076-3417/10/13/4434)
8. [IAEA PRIS Reactor Details, Braidwood unit](https://www.iaea.org/PRIS/CountryStatistics/ReactorDetails.aspx?current=737)
9. [Federal Register (July 7, 2021): Exelon Generation Company, LLC; Braidwood Station, Units 1 and 2](https://www.federalregister.gov/documents/2021/07/07/2021-14456/exelon-generation-company-llc-braidwood-station-units-1-and-2)
10. [Nuclear plants in Illinois are caught in the crosshairs, Chicago Tribune](https://digitaledition.chicagotribune.com/tribune/article_popover.aspx?guid=f784dd9c-c9b7-4640-ad7c-cf99fb355ca4)
11. [Constellation Energy Generation, LLC's Comments on the Illinois Power Agency's Draft 2026 Electricity Procurement Plan](https://ipa.illinois.gov/content/dam/soi/en/web/ipa/documents/20250919-constellation-2026-epp.pdf)
12. [As data centers seek more power, Constellation launches Illinois nuclear plant upgrades to meet rising demand, GMT Today](https://www.gmtoday.com/business/as-data-centers-seek-more-power-constellation-launches-illinois-nuclear-plant-upgrades-to-meet-rising/article_1259b586-7ca4-458c-b920-7aa3a85085e0.html)
13. [EIA State Nuclear Profiles: Illinois](https://www.eia.gov/nuclear/state/illinois/)
14. [Illinois Commerce Commission policy session deck on Illinois nuclear generation](https://icc.illinois.gov/api/web-management/documents/downloads/public/eagenda/RA%20Policy%20Sessions%202%20Combined%20Deck%20-%20FINAL.pdf)
15. [Illinois Nuclear Power Plants brochure, IEMA-OHS](https://iemaohs.illinois.gov/content/dam/soi/en/web/iemaohs/nrs/documents/bnfs-powerplantbrochure.pdf)
16. [NRC Preliminary Notification PNO-III-05-016C, Potential Off-Site Migration of Tritium Contamination](https://www.nrc.gov/docs/ML0603/ML060340583.pdf)
17. [Illinois EPA, Exelon Braidwood Nuclear Facility Tritium Releases and Groundwater Impacts](https://epa.illinois.gov/topics/community-relations/sites/exelon-braidwood.html)
18. [Illinois Attorney General press release: Madigan, Glasgow File Suit for Radioactive Leaks at Braidwood Nuclear Plant (March 16, 2006)](https://illinoisattorneygeneral.gov/News-Room/2006-2018-Press-Archive/200603-16%20GLASGOW%20FILE%20SUIT%20FOR%20RADIOACTIVE%20LEAKS%20AT%20BRAIDWOOD%20NUCLEAR%20PLANT.pdf)

---
*Initially written Oct 15, 2026*

Topic: 技术与人造世界 › 能源技术 › 核电 › Plants, industry, and national programs › Nuclear power plants in the United States

Copyright 2026 Edgepedia

License: Edgepedia Community License 1.0, https://www.edgepedia.org/edgepedia/license

Source: https://www.edgepedia.org/zh/braidwood-nuclear-power-plant

English original: https://www.edgepedia.org/braidwood-nuclear-power-plant
