**北方发电有限公司**（Northern Power Generation Company Limited，简称NPGCL，亦称GENCO-III）是巴基斯坦一家国有发电企业，总部位于旁遮普省[穆扎法尔格尔](https://www.edgepedia.org/zh/muzaffargarh)（Muzaffargarh），隶属能源部电力司行政管理。<sup>[1](https://agp.gov.pk/SiteImage/Policy/FORENSIC%20AUDIT%20REPORT%20Northern%20power%20generation%20company.pdf)</sup> 公司持有国家电力监管局（NEPRA）2002年7月1日颁发的第GL/03/2002号发电许可证，涵盖三处位置不同的发电设施：穆扎法尔格尔火电厂（TPS Muzaffargarh）、[费萨拉巴德](https://www.edgepedia.org/zh/faisalabad)（Faisalabad）燃气轮机发电站（GTPS Faisalabad），以及古杰兰瓦拉（Gujranwala）县南迪普尔（Nandipur）联合循环电厂（CCPP）。<sup>[2](https://nepra.org.pk/licensing/Licences/Generation/GENCOs/LAG-03%20Northern%20Power%20Generation%20Co%20Ltd/2023/Generation%20Licence%20for%20NPGCL%20for%20its%20nandipur%20power%20plant.pdf)</sup> 其许可装机容量合计2,059.65兆瓦。<sup>[2](https://nepra.org.pk/licensing/Licences/Generation/GENCOs/LAG-03%20Northern%20Power%20Generation%20Co%20Ltd/2023/Generation%20Licence%20for%20NPGCL%20for%20its%20nandipur%20power%20plant.pdf)</sup>

| 关键事实 | 详情 |
|---|---|
| 身份 | 国有GENCO-III，总部穆扎法尔格尔，隶属能源部电力司；NEPRA许可证GL/03/2002（2002年7月1日）<sup>[1](https://agp.gov.pk/SiteImage/Policy/FORENSIC%20AUDIT%20REPORT%20Northern%20power%20generation%20company.pdf)</sup><sup> • </sup><sup>[2](https://nepra.org.pk/licensing/Licences/Generation/GENCOs/LAG-03%20Northern%20Power%20Generation%20Co%20Ltd/2023/Generation%20Licence%20for%20NPGCL%20for%20its%20nandipur%20power%20plant.pdf)</sup> |
| 许可机组 | 2,059.65兆瓦：穆扎法尔格尔火电厂1,350.00兆瓦，费萨拉巴德燃气轮机电站144.00兆瓦，南迪普尔联合循环电厂565.65兆瓦<sup>[2](https://nepra.org.pk/licensing/Licences/Generation/GENCOs/LAG-03%20Northern%20Power%20Generation%20Co%20Ltd/2023/Generation%20Licence%20for%20NPGCL%20for%20its%20nandipur%20power%20plant.pdf)</sup> |
| 发电量 | GENCO-III在2019-20财年发电1,775.86吉瓦时，低于2018-19财年的2,716吉瓦时；三家GENCO在中央购电代理担保有限公司（CPPA-G）购电结构中的份额从10.54%降至6.52%<sup>[1](https://agp.gov.pk/SiteImage/Policy/FORENSIC%20AUDIT%20REPORT%20Northern%20power%20generation%20company.pdf)</sup> |
| 热耗率损失 | 十年间因电厂热耗率高于NEPRA允许限值损失458.0亿卢比；穆扎法尔格尔火电厂占损失的76%<sup>[1](https://agp.gov.pk/SiteImage/Policy/FORENSIC%20AUDIT%20REPORT%20Northern%20power%20generation%20company.pdf)</sup> |
| 财务状况 | 2019-20财年末累计亏损357.39亿卢比（十年累计计算为858.05亿卢比）；截至2024年12月为558.5亿卢比<sup>[1](https://agp.gov.pk/SiteImage/Policy/FORENSIC%20AUDIT%20REPORT%20Northern%20power%20generation%20company.pdf)</sup><sup> • </sup><sup>[3](https://www.nation.com.pk/15-Jul-2025/liabilities-of-3-state-owned-power-generation-companies-hit-rs508b)</sup> |
| 电价基础 | “照付不议”容量电费，无论CPPA-G是否购电均须支付<sup>[1](https://agp.gov.pk/SiteImage/Policy/FORENSIC%20AUDIT%20REPORT%20Northern%20power%20generation%20company.pdf)</sup> |
| 重组 | 南迪普尔于2021年12月31日从许可证中剥离，以便在私有化前单独发证；南迪普尔改用再气化液化天然气（RLNG）后，渣油燃料油不再作为其燃料<sup>[2](https://nepra.org.pk/licensing/Licences/Generation/GENCOs/LAG-03%20Northern%20Power%20Generation%20Co%20Ltd/2023/Generation%20Licence%20for%20NPGCL%20for%20its%20nandipur%20power%20plant.pdf)</sup> |

## 历史与公司沿革

1993年的同期报道记载，2号机组预计于1994年8月第一周投产，3号机组于1994年12月投产，5号和6号机组各210兆瓦、4号机组320兆瓦，由中国机械设备工程股份有限公司（CMEC）供货。<sup>[4](https://www.thefreelibrary.com/Development+of+thermal+projects.-a016531518)</sup> 公司官网称GENCO-III自1993年起为全国供电。<sup>[5](https://npgcl.com.pk/?n=137898316)</sup>

NPGCL在巴基斯坦电力部门重组期间形成现有公司架构。2015年，市场运营机构中央购电代理担保有限公司（CPPA-G）从国家输配电公司（NTDC）分离，后者继续担任系统运营机构；2017年，原水利电力部重组。<sup>[6](https://www.adb.org/sites/default/files/evaluation-document/397216/files/eap-pak-spe-energy_6.pdf)</sup> 2021年2月指派巴基斯坦审计长开展的 forensic 审计，涵盖NPGCL的2010-11至2019-20财年；NPGCL是此次受审计的四家主要亏损国有企业之一。<sup>[1](https://agp.gov.pk/SiteImage/Policy/FORENSIC%20AUDIT%20REPORT%20Northern%20power%20generation%20company.pdf)</sup>

## 电厂与容量

**穆扎法尔格尔火电厂**是公司最大的电站，许可容量1,350.00兆瓦，在其运行历史的大部分时期燃烧渣油燃料油（RFO）。<sup>[2](https://nepra.org.pk/licensing/Licences/Generation/GENCOs/LAG-03%20Northern%20Power%20Generation%20Co%20Ltd/2023/Generation%20Licence%20for%20NPGCL%20for%20its%20nandipur%20power%20plant.pdf)</sup>

**费萨拉巴德燃气轮机电站**是一座144.00兆瓦的燃气轮机电站，机组于1975年投产，已运行超过45年，远超其有效寿命，效率极低。其主要燃料为天然气/再气化液化天然气，高速柴油（HSD）和渣油燃料油为替代燃料；在天然气不可用时以再气化液化天然气、渣油燃料油或高速柴油运行均不经济。<sup>[7](https://nepra.org.pk/licensing/Licences/Generation/GENCOs/LAG-03%20Northern%20Power%20Generation%20Co%20Ltd/2023/Modification%20V%20in%20the%20Generation%20Licence%20of%20NPGCL.PDF)</sup>

**南迪普尔联合循环电厂**由三台通用电气PG9171E Frame 9E燃气轮机（3×122.10兆瓦）、三台余热锅炉和一台中国东方汽轮机（1×199.35兆瓦）组成。其天然气/再气化液化天然气工况装机容量为565.65兆瓦，渣油燃料油工况为474.0兆瓦，于2015年7月23日达到商业运行日期。NPGCL报告天然气/再气化液化天然气工况联合循环效率为49%。<sup>[2](https://nepra.org.pk/licensing/Licences/Generation/GENCOs/LAG-03%20Northern%20Power%20Generation%20Co%20Ltd/2023/Generation%20Licence%20for%20NPGCL%20for%20its%20nandipur%20power%20plant.pdf)</sup> 审计长的 forensic 审计及后续公司文件将同一电厂描述为525兆瓦毛容量联合循环电厂。<sup>[1](https://agp.gov.pk/SiteImage/Policy/FORENSIC%20AUDIT%20REPORT%20Northern%20power%20generation%20company.pdf)</sup><sup> • </sup><sup>[8](https://ghcl.gov.pk/SiteImage/Publication/SCI.pdf)</sup>

## 运营与绩效

NPGCL旗下机组走势相反。南迪普尔效率从2015-16年的35.93%升至2021-22年的46.53%，2021-22年可用率为95.03%；而费萨拉巴德燃气轮机电站2021-22年效率为26.76%。<sup>[9](https://npgcl.com.pk/wp-content/uploads/2023/07/Annual-Report-2022.pdf)</sup> 穆扎法尔格尔利用率从2012-13年的41.9%降至2021-22年的2.37%。<sup>[9](https://npgcl.com.pk/wp-content/uploads/2023/07/Annual-Report-2022.pdf)</sup> 费萨拉巴德5-9号机组五年利用率约6.58%，各年净效率分别为27.96%、29.02%、0.0%、23.89%和26.86%。<sup>[7](https://nepra.org.pk/licensing/Licences/Generation/GENCOs/LAG-03%20Northern%20Power%20Generation%20Co%20Ltd/2023/Modification%20V%20in%20the%20Generation%20Licence%20of%20NPGCL.PDF)</sup>

forensic 审计记录GENCO-III在2019-20财年发电1,775.86吉瓦时，而2018-19财年为2,716吉瓦时，<sup>[1](https://agp.gov.pk/SiteImage/Policy/FORENSIC%20AUDIT%20REPORT%20Northern%20power%20generation%20company.pdf)</sup> 公司年报表格则显示穆扎法尔格尔早年净发电量约5,132至5,160吉瓦时，另有4,477、4,645和4,311吉瓦时的较低历史值。<sup>[9](https://npgcl.com.pk/wp-content/uploads/2023/07/Annual-Report-2022.pdf)</sup>

## 数据一览

forensic 审计量化了热耗率不佳的成本。NPGCL十年间因电厂未达到NEPRA确定的热耗率而损失458.0亿卢比，其中穆扎法尔格尔火电厂因持续燃烧渣油燃料油占损失的76%。<sup>[1](https://agp.gov.pk/SiteImage/Policy/FORENSIC%20AUDIT%20REPORT%20Northern%20power%20generation%20company.pdf)</sup> 审计表列记录的热耗率（英热单位/千瓦时基准）在五个审计年度中穆扎法尔格尔分别为11,494、10,378、10,584、10,730和10,684，南迪普尔为8,995和8,006；相比之下，古杜（Guddu）11-13号机组为12,763至13,844，贾姆肖罗（Jamshoro）约11,000至11,619。<sup>[1](https://agp.gov.pk/SiteImage/Policy/FORENSIC%20AUDIT%20REPORT%20Northern%20power%20generation%20company.pdf)</sup> 南迪普尔和古杜14-16号机组等以再气化液化天然气为燃料的电厂热耗率低于渣油燃料油电厂，表明效率更高。<sup>[1](https://agp.gov.pk/SiteImage/Policy/FORENSIC%20AUDIT%20REPORT%20Northern%20power%20generation%20company.pdf)</sup>

盈利能力也同样因燃料种类而分化：南迪普尔联合循环电厂2019-20财年以再气化液化天然气获得毛利润42.91748亿卢比（2018-19财年：39.23705亿卢比），而穆扎法尔格尔火电厂因昂贵的渣油燃料油出现毛亏损5.50788亿卢比。<sup>[1](https://agp.gov.pk/SiteImage/Policy/FORENSIC%20AUDIT%20REPORT%20Northern%20power%20generation%20company.pdf)</sup> 整个GENCO板块2019-20财年总发电容量为4,881兆瓦，较上年的5,637兆瓦减少756兆瓦。<sup>[1](https://agp.gov.pk/SiteImage/Policy/FORENSIC%20AUDIT%20REPORT%20Northern%20power%20generation%20company.pdf)</sup>

## 治理、监管与财务

NPGCL受NEPRA监管，后者确定其许可容量、热耗率基准和电价；NPGCL还根据2021年2月 forensic 审计任务接受巴基斯坦审计长审计。<sup>[1](https://agp.gov.pk/SiteImage/Policy/FORENSIC%20AUDIT%20REPORT%20Northern%20power%20generation%20company.pdf)</sup><sup> • </sup><sup>[2](https://nepra.org.pk/licensing/Licences/Generation/GENCOs/LAG-03%20Northern%20Power%20Generation%20Co%20Ltd/2023/Generation%20Licence%20for%20NPGCL%20for%20its%20nandipur%20power%20plant.pdf)</sup> 审计的治理发现包括：董事会十年间未任命首席内部审计师，财务总监的任命违反公共采购监管局（PPRA）规则。<sup>[1](https://agp.gov.pk/SiteImage/Policy/FORENSIC%20AUDIT%20REPORT%20Northern%20power%20generation%20company.pdf)</sup>

**容量电费。** GENCO-I、II和III实行“照付不议”电价，即无论CPPA-G是否向其购电，均有资格获得容量电费。<sup>[1](https://agp.gov.pk/SiteImage/Policy/FORENSIC%20AUDIT%20REPORT%20Northern%20power%20generation%20company.pdf)</sup>

近期账目显示持续恶化。截至2024年12月，GENCO-III报告毛亏损14.2亿卢比，上年为2.78亿卢比；销售额208.9亿卢比，销售成本223.2亿卢比；尽管有其他收入34.6亿卢比（大部分为非经营性），税前亏损仍达31.2亿卢比，财务成本10.4亿卢比。<sup>[3](https://www.nation.com.pk/15-Jul-2025/liabilities-of-3-state-owned-power-generation-companies-hit-rs508b)</sup> 累计亏损558.5亿卢比，由1,167.7亿卢比土地重估盈余抵消，支撑总权益788亿卢比；流动负债970亿卢比。<sup>[3](https://www.nation.com.pk/15-Jul-2025/liabilities-of-3-state-owned-power-generation-companies-hit-rs508b)</sup>

## 与其他巴基斯坦GENCO及独立发电商的比较

2019-20财年，GENCO-I（贾姆肖罗）发电209.90吉瓦时，低于上年的880.09吉瓦时；GENCO-II（古杜）发电5,921.75吉瓦时，低于9,385吉瓦时；GENCO-III的1,775.86吉瓦时居于两者之间。<sup>[1](https://agp.gov.pk/SiteImage/Policy/FORENSIC%20AUDIT%20REPORT%20Northern%20power%20generation%20company.pdf)</sup> 热耗率方面，南迪普尔（8,995和8,006）是审计表列电厂中表现最好的，而穆扎法尔格尔渣油燃料油热耗率约10,378至11,494，接近贾姆肖罗的11,000至11,619，远低于古杜较老机组的12,763至13,844。<sup>[1](https://agp.gov.pk/SiteImage/Policy/FORENSIC%20AUDIT%20REPORT%20Northern%20power%20generation%20company.pdf)</sup>

与独立发电商的结构性差距源于维护。世界银行一份行业评估将巴基斯坦持续供电短缺归因于GENCO低效和投资不足，发现GENCO自投产以来可靠容量损失源于缺乏及时大修、错过年度计划维护例行工作和运行计划不佳，而独立发电商通过及时运维维持了容量。<sup>[10](https://openknowledge.worldbank.org/server/api/core/bitstreams/35b9998c-8ed5-5781-a722-d8eace6221e4/content)</sup>

## 私有化、退役与近期动态

重组沿两条轨道推进：退役老旧机组，[私有化](https://www.edgepedia.org/zh/privatization)或外包较新电厂。

**退役与处置。** 能源内阁委员会于2020年9月10日决定，费萨拉巴德燃气轮机电站5-9号机组仅保留至特里穆（Trimmu）电厂投产，该厂首台400兆瓦燃气轮机于2022年7月6日测试并并网。<sup>[7](https://nepra.org.pk/licensing/Licences/Generation/GENCOs/LAG-03%20Northern%20Power%20Generation%20Co%20Ltd/2023/Modification%20V%20in%20the%20Generation%20Licence%20of%20NPGCL.PDF)</sup> 该内阁委员会关停决定后，2021年首批1,753名GENCO富余员工被调整至配电公司，已处置电厂区块的容量电费停止支付。<sup>[8](https://ghcl.gov.pk/SiteImage/Publication/SCI.pdf)</sup> 老旧低效GENCO电厂在国家工程服务巴基斯坦有限公司（NESPAK）监督下处置，底价由巴基斯坦工程委员会（PEC）和巴基斯坦国家银行（SBP）批准的估值师确定。<sup>[8](https://ghcl.gov.pk/SiteImage/Publication/SCI.pdf)</sup> 2025年，国防部下属瓦赫工业公司（Wah Industries）通过政府对政府协议，以382.55亿卢比从NPGCL、CPGCL和JPCL收购约30座淘汰电厂，略高于382.24亿卢比底价，此前公开国际拍卖流拍；此次出售是旨在削减容量电费和循环债务的改革的一部分。<sup>[11](https://www.dawn.com/news/1926637)</sup>

**南迪普尔。** 2021年12月31日，能源部电力司指示NPGCL将南迪普尔联合循环电厂从发电许可证中剥离，并在私有化委员会决定的私有化实施前取得单独许可证；NEPRA根据《NEPRA法》第26条批准了排除南迪普尔的许可证修改。<sup>[2](https://nepra.org.pk/licensing/Licences/Generation/GENCOs/LAG-03%20Northern%20Power%20Generation%20Co%20Ltd/2023/Generation%20Licence%20for%20NPGCL%20for%20its%20nandipur%20power%20plant.pdf)</sup><sup> • </sup><sup>[7](https://nepra.org.pk/licensing/Licences/Generation/GENCOs/LAG-03%20Northern%20Power%20Generation%20Co%20Ltd/2023/Modification%20V%20in%20the%20Generation%20Licence%20of%20NPGCL.PDF)</sup> 根据NEPRA 2022年4月11日决定，渣油燃料油/高硫燃料油不再作为南迪普尔燃料；天然气/再气化液化天然气成为主要燃料，高速柴油为替代和启动燃料。石油部分配100百万立方英尺/日天然气后，燃气轮机完成全面改造，容量增加约100兆瓦，涡轮机维护减少。<sup>[2](https://nepra.org.pk/licensing/Licences/Generation/GENCOs/LAG-03%20Northern%20Power%20Generation%20Co%20Ltd/2023/Generation%20Licence%20for%20NPGCL%20for%20its%20nandipur%20power%20plant.pdf)</sup> 南迪普尔（525兆瓦）和古杜（747兆瓦）在活跃私有化名单上，南迪普尔私有化前关键问题大多已解决，较新电厂（包括南迪普尔、747兆瓦古杜联合循环电厂和贾姆肖罗660兆瓦燃煤电厂）的运维已外包给专业运营商。<sup>[8](https://ghcl.gov.pk/SiteImage/Publication/SCI.pdf)</sup>

**电价调整。** 2025年4月，巴基斯坦着手降低四座国有电厂电价，包括NPGCL南迪普尔每度电降低0.3216卢比，作为预计节省1.56万亿卢比的改革的一部分，外资股本回报率固定为13%、汇率168卢比/美元，且未来不再指数化。<sup>[12](https://www.nation.com.pk/25-Apr-2025/downward-revision-of-tariff-for-four-state-owned-plants-to-save-rs1-56-trillion)</sup>

## References

1. [Forensic Audit Report of Northern Power Generation Company Limited, Auditor-General of Pakistan](https://agp.gov.pk/SiteImage/Policy/FORENSIC%20AUDIT%20REPORT%20Northern%20power%20generation%20company.pdf)
2. [NEPRA Generation Licence decision for NPGCL's Nandipur power plant (2023)](https://nepra.org.pk/licensing/Licences/Generation/GENCOs/LAG-03%20Northern%20Power%20Generation%20Co%20Ltd/2023/Generation%20Licence%20for%20NPGCL%20for%20its%20nandipur%20power%20plant.pdf)
3. [Liabilities of 3 state-owned power generation companies hit Rs508b, The Nation (July 15, 2025)](https://www.nation.com.pk/15-Jul-2025/liabilities-of-3-state-owned-power-generation-companies-hit-rs508b)
4. [Development of thermal projects, Economic Review (1993)](https://www.thefreelibrary.com/Development+of+thermal+projects.-a016531518)
5. [NPGCL (GENCO-III) official website](https://npgcl.com.pk/?n=137898316)
6. [ADB Sector Assistance Program Evaluation for the Pakistan Power Sector](https://www.adb.org/sites/default/files/evaluation-document/397216/files/eap-pak-spe-energy_6.pdf)
7. [NEPRA Modification V in the Generation Licence of NPGCL (2023)](https://nepra.org.pk/licensing/Licences/Generation/GENCOs/LAG-03%20Northern%20Power%20Generation%20Co%20Ltd/2023/Modification%20V%20in%20the%20Generation%20Licence%20of%20NPGCL.PDF)
8. [GENCO Holding Company Ltd Statement of Corporate Intent 2025-26](https://ghcl.gov.pk/SiteImage/Publication/SCI.pdf)
9. [NPGCL Annual Report 2021-22](https://npgcl.com.pk/wp-content/uploads/2023/07/Annual-Report-2022.pdf)
10. [World Bank document on Pakistan power sector](https://openknowledge.worldbank.org/server/api/core/bitstreams/35b9998c-8ed5-5781-a722-d8eace6221e4/content)
11. [Govt sells obsolete Genco plants to Wah Industries, Dawn (2025)](https://www.dawn.com/news/1926637)
12. [Downward revision of tariff for four state-owned plants to save Rs1.56 trillion, The Nation (April 25, 2025)](https://www.nation.com.pk/25-Apr-2025/downward-revision-of-tariff-for-four-state-owned-plants-to-save-rs1-56-trillion)

---
*Initially written Oct 15, 2026*

Topic: 技术与人造世界 › 能源技术 › 电网与输电 › 公用事业、停电与各国电力行业 › 发电公司与电力生产商 › 东南亚与南亚发电公司

Copyright 2026 Edgepedia

License: Edgepedia Community License 1.0, https://www.edgepedia.org/edgepedia/license

Source: https://www.edgepedia.org/zh/northern-power-generation-company

English original: https://www.edgepedia.org/northern-power-generation-company