# 拉文纳液化天然气终端

拉文纳液化天然气终端（Ravenna LNG Terminal）是意大利的一座海上液化天然气（LNG）进口终端，浮式储存再气化装置（FSRU）“BW新加坡”号永久系泊于北亚得里亚海拉文纳附近蓬塔马里纳外约8.5公里处，将液化天然气再气化后注入意大利国家天然气管道网络。<sup>[1](https://www.snam.it/content/dam/snam/pages-attachments/it/i-nostri-business/rigassificazione/documents/codice-tariffe-area-comitato/codice-di-rigassificazione-fsru-ravenna/manuali-del-terminale/Regolamento%20Terminal%20GNL%20Ravenna%20ed.%2026.02.2025_inglese.pdf)</sup>该终端由Snam FSRU Italia S.r.l.（后更名为Snam LNG S.r.l.）运营，于2025年5月投入商业运行，成为意大利第五座运营中的再气化终端。<sup>[2](https://www.snam.it/en/media/news-and-press-releases/comunicati-stampa/2025/BW-Singapore-FSRU-completes-commissioning-Commercial-operations-in-May.html)</sup>

| 关键事实 | 详情 |
|---|---|
| 再气化船舶 | FSRU“BW新加坡”号，IMO编号9684495，2015年建造；总吨位106,793吨，总长293米，型宽44米，四个薄膜型储罐<sup>[1](https://www.snam.it/content/dam/snam/pages-attachments/it/i-nostri-business/rigassificazione/documents/codice-tariffe-area-comitato/codice-di-rigassificazione-fsru-ravenna/manuali-del-terminale/Regolamento%20Terminal%20GNL%20Ravenna%20ed.%2026.02.2025_inglese.pdf)</sup><sup> • </sup><sup>[3](https://www.snam.it/content/dam/snam/pages-attachments-search/en/documenti/bilanci-annuali/2024/annual_report_2024.pdf)</sup> |
| LNG储存 | 货舱最大名义容量171,000立方米液化天然气<sup>[1](https://www.snam.it/content/dam/snam/pages-attachments/it/i-nostri-business/rigassificazione/documents/codice-tariffe-area-comitato/codice-di-rigassificazione-fsru-ravenna/manuali-del-terminale/Regolamento%20Terminal%20GNL%20Ravenna%20ed.%2026.02.2025_inglese.pdf)</sup> |
| 外输能力 | 最大再气化能力880,000标准立方米/小时；年最大许可量50亿标准立方米<sup>[1](https://www.snam.it/content/dam/snam/pages-attachments/it/i-nostri-business/rigassificazione/documents/codice-tariffe-area-comitato/codice-di-rigassificazione-fsru-ravenna/manuali-del-terminale/Regolamento%20Terminal%20GNL%20Ravenna%20ed.%2026.02.2025_inglese.pdf)</sup> |
| 位置 | SNAM（原“Petra”）海上终端，位于拉文纳港防波堤东南约4海里处，坐标44° 27.865' N, 012° 23.865' E（WGS 84）<sup>[1](https://www.snam.it/content/dam/snam/pages-attachments/it/i-nostri-business/rigassificazione/documents/codice-tariffe-area-comitato/codice-di-rigassificazione-fsru-ravenna/manuali-del-terminale/Regolamento%20Terminal%20GNL%20Ravenna%20ed.%2026.02.2025_inglese.pdf)</sup> |
| 管网连接 | 约8.5公里海底管道，其中包括1,300米海岸微隧道，接入拉文纳节点，汇入国家天然气管道网络<sup>[1](https://www.snam.it/content/dam/snam/pages-attachments/it/i-nostri-business/rigassificazione/documents/codice-tariffe-area-comitato/codice-di-rigassificazione-fsru-ravenna/manuali-del-terminale/Regolamento%20Terminal%20GNL%20Ravenna%20ed.%2026.02.2025_inglese.pdf)</sup> |
| 投运时间 | 2025年4月28日完成调试；2025年5月起商业运营；2025年6月12日卸下首船商业货物<sup>[2](https://www.snam.it/en/media/news-and-press-releases/comunicati-stampa/2025/BW-Singapore-FSRU-completes-commissioning-Commercial-operations-in-May.html)</sup><sup> • </sup><sup>[4](https://www.arera.it/fileadmin/allegati/relaz_ann/25/AR_2025_EN.pdf)</sup> |
| 投资 | 项目总成本略超10亿欧元<sup>[5](https://www.snam.it/content/dam/snam/news-assets/comunicati-stampa/en/2025/PR_BW%20Singapore%20floating%20regasification%20unit%20to%20enter%20operation%20in%20the%20coming%20weeks.pdf)</sup> |

## 目的与国家背景

该终端依据2022年5月17日意大利第50号法令第5条启动，该条款宣布通过连接现有输送网络的FSRU提升国家再气化能力的工程为具有公共事业属性的战略性干预措施，属紧急且不可推迟事项，以应对俄罗斯入侵乌克兰后的能源危机。<sup>[1](https://www.snam.it/content/dam/snam/pages-attachments/it/i-nostri-business/rigassificazione/documents/codice-tariffe-area-comitato/codice-di-rigassificazione-fsru-ravenna/manuali-del-terminale/Regolamento%20Terminal%20GNL%20Ravenna%20ed.%2026.02.2025_inglese.pdf)</sup><sup> • </sup><sup>[6](https://www.snam.it/content/dam/snam/pages-attachments/en/governance/documents/storico-assemblee/2025/Snam%20S.p.A.%20-%20Fascicolo%20Domande%20e%20risposte%20Recommon%20ETS%20-%20Assemblea%202025%2005%2014%20-%20ENG.pdf)</sup>Snam于2022年7月从BW LNG手中收购“BW新加坡”号，交易据报道约4亿美元；该船此前租给埃及EGAS，直至2023年11月。<sup>[7](https://www.blackridgeresearch.com/project-profiles/fsru-ravenna-location-cost-contractors-operation-date-details)</sup>

随着拉文纳终端投运，意大利再气化总能力升至约280亿立方米/年，这一体量相当于2021年从俄罗斯管道进口的天然气量，约合该国国内天然气需求的45%。<sup>[2](https://www.snam.it/en/media/news-and-press-releases/comunicati-stampa/2025/BW-Singapore-FSRU-completes-commissioning-Commercial-operations-in-May.html)</sup>意大利五座运营中的再气化设施分别为帕尼加利亚（陆上）、[亚得里亚海](https://www.edgepedia.org/zh/adriatic-sea)LNG（海上重力式结构），以及里窝那、皮翁比诺和拉文纳的FSRU。<sup>[8](https://www.trade.gov/market-intelligence/italy-energy-liquefied-natural-gas-lng)</sup>

## 船舶与场址

“BW新加坡”号系泊于SNAM海上终端，该终端复用了建于20世纪80年代的Petra海上平台，船首朝北（011°），右舷由八根系泊桩固定。<sup>[1](https://www.snam.it/content/dam/snam/pages-attachments/it/i-nostri-business/rigassificazione/documents/codice-tariffe-area-comitato/codice-di-rigassificazione-fsru-ravenna/manuali-del-terminale/Regolamento%20Terminal%20GNL%20Ravenna%20ed.%2026.02.2025_inglese.pdf)</sup><sup> • </sup><sup>[9](https://teconsrl.it/project/fsru-ravenna-terminal/)</sup>LNG运输船通过船对船转运卸货，最多使用六条软管连接，包括LNG输送和蒸发气回流；FSRU以5至7天的固定间隔由不同大小的运输船补给，并可反过来向中小型运输船供气，用于小规模LNG分销。<sup>[1](https://www.snam.it/content/dam/snam/pages-attachments/it/i-nostri-business/rigassificazione/documents/codice-tariffe-area-comitato/codice-di-rigassificazione-fsru-ravenna/manuali-del-terminale/Regolamento%20Terminal%20GNL%20Ravenna%20ed.%2026.02.2025_inglese.pdf)</sup><sup> • </sup><sup>[10](https://www.portaleseveso.isprambiente.gov.it/NotifichePubblico?CodiceUnivoco=NH201&notifica=5008)</sup>拉文纳港务局第29/2025号令规定了到港、过驳作业和安全要求，包括所有靠泊LNG运输船必须配备紧急关断系统。<sup>[1](https://www.snam.it/content/dam/snam/pages-attachments/it/i-nostri-business/rigassificazione/documents/codice-tariffe-area-comitato/codice-di-rigassificazione-fsru-ravenna/manuali-del-terminale/Regolamento%20Terminal%20GNL%20Ravenna%20ed.%2026.02.2025_inglese.pdf)</sup>

## 管道与管网连接

再气化后的天然气通过约8.5公里海底管道离开船舶抵达系泊点，然后经约1,300米地下微隧道穿越海岸线，到达蓬塔马里纳原“Sarom”区域。管道沿克里斯托弗·哥伦布海滨大道向北延伸，经第二条微隧道穿过松林后，抵达PDE过滤、调压及贸易计量站，再由新建管道输送至城市东北的拉文纳节点，在此汇入国家天然气管道网络。<sup>[1](https://www.snam.it/content/dam/snam/pages-attachments/it/i-nostri-business/rigassificazione/documents/codice-tariffe-area-comitato/codice-di-rigassificazione-fsru-ravenna/manuali-del-terminale/Regolamento%20Terminal%20GNL%20Ravenna%20ed.%2026.02.2025_inglese.pdf)</sup>Snam 2024年年报称连接点距系泊点约42公里。<sup>[3](https://www.snam.it/content/dam/snam/pages-attachments-search/en/documenti/bilanci-annuali/2024/annual_report_2024.pdf)</sup>蓬塔马里纳地区距管道登陆点约2公里处设有一座沃泊指数调节站，已单独获得单一环境许可。<sup>[3](https://www.snam.it/content/dam/snam/pages-attachments-search/en/documenti/bilanci-annuali/2024/annual_report_2024.pdf)</sup>

## 审批与建设

再气化装置政府特别专员、[艾米利亚-罗马涅](https://www.edgepedia.org/zh/emilia-romagna)大区主席于2022年11月7日签署综合许可令；后于2024年2月6日以法令修订。<sup>[1](https://www.snam.it/content/dam/snam/pages-attachments/it/i-nostri-business/rigassificazione/documents/codice-tariffe-area-comitato/codice-di-rigassificazione-fsru-ravenna/manuali-del-terminale/Regolamento%20Terminal%20GNL%20Ravenna%20ed.%2026.02.2025_inglese.pdf)</sup><sup> • </sup><sup>[11](https://notizie.regione.emilia-romagna.it/comunicati/2022/novembre/rigassificatore-al-largo-di-ravenna-il-presidente-bonaccini-firma-il-decreto-di-autorizzazione-dell2019opera-che-completa-l2019iter-previsto-201cvia-libera-condiviso-con-le-parti-sociali-e-il-territorio-a-una-infrastruttura-al-servizio-dell2019intero)</sup>该许可涵盖自调试起25年的建设和运营，环境综合许可令于2025年3月21日签发。<sup>[3](https://www.snam.it/content/dam/snam/pages-attachments-search/en/documenti/bilanci-annuali/2024/annual_report_2024.pdf)</sup><sup> • </sup><sup>[12](https://va.mite.gov.it/it-IT/Oggetti/Documentazione/11251/16902)</sup>2024年11月，拉文纳港务局签署了一份价值约2亿欧元的合同，由存款与贷款银行（Cassa Depositi e Prestiti）出资，用于修建保护再气化装置的防波堤，建设预计耗时两年多。<sup>[13](https://www.port.ravenna.it/comunicazione/e-stato-firmato-questa-mattina-presso-la-sede-dell-autorita-portuale-di-ravenna-alla-presenza-del-ministro-delle-infrastrutture-e-dei-trasporti-matteo-salvini-il-contratto-per-la-realizzazione-della-diga-a-protezione-del-rigassificatore-di-ravenna)</sup>建设高峰期Snam雇用了多达1,200人，公司估计每年在技术航海服务、平台管理和环境监测上的运营支出约为2,000万至3,000万欧元。<sup>[5](https://www.snam.it/content/dam/snam/news-assets/comunicati-stampa/en/2025/PR_BW%20Singapore%20floating%20regasification%20unit%20to%20enter%20operation%20in%20the%20coming%20weeks.pdf)</sup>

## 运营与产能预订

调试于2025年4月28日完成，2025年5月开始再气化，2025年6月12日卸下首船商业货物。<sup>[2](https://www.snam.it/en/media/news-and-press-releases/comunicati-stampa/2025/BW-Singapore-FSRU-completes-commissioning-Commercial-operations-in-May.html)</sup><sup> • </sup><sup>[4](https://www.arera.it/fileadmin/allegati/relaz_ann/25/AR_2025_EN.pdf)</sup>产能通过竞争性拍卖分配，规则由监管机构ARERA制定，该机构还审批终端年度再气化费率；2026年费率由2025年7月29日第369/2025/R/gas号决议批准。<sup>[4](https://www.arera.it/fileadmin/allegati/relaz_ann/25/AR_2025_EN.pdf)</sup><sup> • </sup><sup>[14](https://www.arera.it/atti-e-provvedimenti/dettaglio/25/369-25)</sup>

初期需求低迷：在2025年5月举行的6月至9月产能拍卖中，该终端（据Argus评估，年再气化能力为380万吨）仅售出一个再气化时段，据报道价格为290万美元，且终端须承担相当于每船货物总量2%的实物天然气成本。<sup>[15](https://www.argusmedia.com/news-and-insights/latest-market-news/2695945-italy-s-ravenna-lng-sells-only-one-regas-slot)</sup>此后认购量增长：2025年该终端再气化17.2亿立方米，接卸17艘LNG运输船；到2026年中期，通过最近几次拍卖，约40%的产能已被预订至未来十年。<sup>[16](https://www.adriaports.com/en/shipping-en/snam-strategic-plan-reinforces-role-of-ravenna-lng-terminal/)</sup><sup> • </sup><sup>[17](https://www.emarketstorage.it/sites/default/files/comunicati/2026-07/20260729_187382.pdf)</sup>2026年上半年，该厂在六次卸货中新增再气化量8.3亿立方米——2025年同期仅运营两个月——并为Snam的监管收入贡献了2,300万欧元。<sup>[18](https://www.emarketstorage.it/sites/default/files/comunicati/2026-07/20260731_187626.pdf)</sup>

## 环境争议

环境团体在审批过程中反对该项目。意大利环境联盟（Legambiente）提交了负面意见，指出环境报告不充分，缺乏包含甲烷泄漏风险的详细排放清单，次氯酸钠排放的化学影响，以及约7°C温差的水体排放。<sup>[19](https://www.legambientefaenza.it/energie-alternative/2022/09/rigassificatore-infrastruttura-inutile-e-pericolosa/)</sup>意大利Nostra组织对生物保护区及波河三角洲公园Natura 2000区域的影响提出质疑，指出项目自身的监测计划就提议通过贻贝（该地区商业捕捞物种）的生物累积来检查氯化副产物。<sup>[20](https://www.italianostra.org/sezioni-e-consigli-regionali/emilia-romagna/ravenna/snam-rassicura-il-presidente-bonaccini-benedice-ma-qual-e-il-reale-impatto-del-previsto-rigassificatore-a-ravenna-e-sulle-zone-di-tutela-marina-e-sulla-pesca/)</sup>Snam表示，项目优先考虑自然区域，尽量减少土地使用，采用非开挖管道铺设以减少海岸线影响，并开展了涵盖陆上70,000项参数和海上20,000项参数的环境监测，涉及三所大学和十个分析实验室。<sup>[5](https://www.snam.it/content/dam/snam/news-assets/comunicati-stampa/en/2025/PR_BW%20Singapore%20floating%20regasification%20unit%20to%20enter%20operation%20in%20the%20coming%20weeks.pdf)</sup>

## References

1. [Ravenna Harbour Master's Office, Regulation of the Ravenna LNG Terminal, Order No. 29/2025 (Snam)](https://www.snam.it/content/dam/snam/pages-attachments/it/i-nostri-business/rigassificazione/documents/codice-tariffe-area-comitato/codice-di-rigassificazione-fsru-ravenna/manuali-del-terminale/Regolamento%20Terminal%20GNL%20Ravenna%20ed.%2026.02.2025_inglese.pdf)
2. [BW Singapore FSRU successfully completes commissioning. Commercial operations to begin in May, Snam press release, 28 April 2025](https://www.snam.it/en/media/news-and-press-releases/comunicati-stampa/2025/BW-Singapore-FSRU-completes-commissioning-Commercial-operations-in-May.html)
3. [Snam Annual Report 2024](https://www.snam.it/content/dam/snam/pages-attachments-search/en/documenti/bilanci-annuali/2024/annual_report_2024.pdf)
4. [ARERA, Annual Report on the natural gas market, 31 July 2025](https://www.arera.it/fileadmin/allegati/relaz_ann/25/AR_2025_EN.pdf)
5. [BW Singapore floating regasification unit to enter operation in the coming weeks, Snam press release](https://www.snam.it/content/dam/snam/news-assets/comunicati-stampa/en/2025/PR_BW%20Singapore%20floating%20regasification%20unit%20to%20enter%20operation%20in%20the%20coming%20weeks.pdf)
6. [Snam S.p.A., Question and answer dossier, 2025 Annual General Meeting](https://www.snam.it/content/dam/snam/pages-attachments/en/governance/documents/storico-assemblee/2025/Snam%20S.p.A.%20-%20Fascicolo%20Domande%20e%20risposte%20Recommon%20ETS%20-%20Assemblea%202025%2005%2014%20-%20ENG.pdf)
7. [FSRU Ravenna project profile, Blackridge Research](https://www.blackridgeresearch.com/project-profiles/fsru-ravenna-location-cost-contractors-operation-date-details)
8. [Italy Energy: Liquefied Natural Gas (LNG), U.S. International Trade Administration](https://www.trade.gov/market-intelligence/italy-energy-liquefied-natural-gas-lng)
9. [FSRU Ravenna Terminal, Tecon S.r.l.](https://teconsrl.it/project/fsru-ravenna-terminal/)
10. [Portale Seveso, ISPRA, public notification NH201 for the Ravenna marine regasification terminal](https://www.portaleseveso.isprambiente.gov.it/NotifichePubblico?CodiceUnivoco=NH201&notifica=5008)
11. [Emilia-Romagna Region, authorization decree for the Ravenna regasifier, 7 November 2022](https://notizie.regione.emilia-romagna.it/comunicati/2022/novembre/rigassificatore-al-largo-di-ravenna-il-presidente-bonaccini-firma-il-decreto-di-autorizzazione-dell2019opera-che-completa-l2019iter-previsto-201cvia-libera-condiviso-con-le-parti-sociali-e-il-territorio-a-una-infrastruttura-al-servizio-dell2019intero)
12. [Snam FSRU Italia, Ravenna Terminal, environmental assessment documentation, Valutazioni e Autorizzazioni Ambientali (MASE/VAS-VIA-AIA portal)](https://va.mite.gov.it/it-IT/Oggetti/Documentazione/11251/16902)
13. [Port Authority of Ravenna, Comunicazione 157/2024, breakwater contract signing, 12 November 2024](https://www.port.ravenna.it/comunicazione/e-stato-firmato-questa-mattina-presso-la-sede-dell-autorita-portuale-di-ravenna-alla-presenza-del-ministro-delle-infrastrutture-e-dei-trasporti-matteo-salvini-il-contratto-per-la-realizzazione-della-diga-a-protezione-del-rigassificatore-di-ravenna)
14. [ARERA, Delibera 369/2025/R/gas, approval of the 2026 regasification tariff for the Ravenna FSRU terminal](https://www.arera.it/atti-e-provvedimenti/dettaglio/25/369-25)
15. [Italy's Ravenna LNG sells only one regas slot, Argus Media, 5 June 2025](https://www.argusmedia.com/news-and-insights/latest-market-news/2695945-italy-s-ravenna-lng-sells-only-one-regas-slot)
16. [Snam strategic plan reinforces role of Ravenna LNG terminal, AdriaPorts](https://www.adriaports.com/en/shipping-en/snam-strategic-plan-reinforces-role-of-ravenna-lng-terminal/)
17. [Snam, 1H 2026 Industrial Growth key achievements presentation](https://www.emarketstorage.it/sites/default/files/comunicati/2026-07/20260729_187382.pdf)
18. [Snam, Half-Year Financial Report 2026](https://www.emarketstorage.it/sites/default/files/comunicati/2026-07/20260731_187626.pdf)
19. [Legambiente Faenza, Rigassificatore: infrastruttura inutile e pericolosa, 3 September 2022](https://www.legambientefaenza.it/energie-alternative/2022/09/rigassificatore-infrastruttura-inutile-e-pericolosa/)
20. [Italia Nostra Ravenna, Snam rassicura... qual è il reale impatto del previsto rigassificatore a Ravenna?, 26 September 2022](https://www.italianostra.org/sezioni-e-consigli-regionali/emilia-romagna/ravenna/snam-rassicura-il-presidente-bonaccini-benedice-ma-qual-e-il-reale-impatto-del-previsto-rigassificatore-a-ravenna-e-sulle-zone-di-tutela-marina-e-sulla-pesca/)

---
*Initially written Oct 15, 2026*

Topic: 技术与人造世界 › 能源技术 › 天然气 › LNG terminals › LNG terminals in Southern Europe

Copyright 2026 Edgepedia

License: Edgepedia Community License 1.0, https://www.edgepedia.org/edgepedia/license

Source: https://www.edgepedia.org/zh/ravenna-lng-terminal

English original: https://www.edgepedia.org/ravenna-lng-terminal